• Title/Summary/Keyword: Project Cost Saving

Search Result 104, Processing Time 0.035 seconds

An RFID and BIM based Simulator for Construction Material Logistics and Progress Management (RFID와 BIM을 활용한 건설 자재 물류 및 진도관리 시뮬레이터 개발)

  • Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.46-54
    • /
    • 2011
  • There have been research and developments for effective and efficient logistics and progress management in a construction project. Among them, RFID+4D has been developed for the supply chain management of long-lead item materials such as steel component, precast concrete component and curtain wall by integrating RFID with 4D CAD. And the feasibility of RFID+4D has been verified and validated and the benefits in terms of time and cost were shown in several case studies. However, the previous development of RFID+4D has not been adapted widely because of additional modeling cost, non-real time data update, additional labor for data update, and so forth. Therefore, this research has proposed a framework and process for solving these problems. And the web based simulation system has been developed and verified based on the proposed framework. The proposed framework and process can improve the existing RFID+4D system in a construction project by saving its operation cost and utilizing project information more efficiently and effectively. Also it is expected that the proposed framework could be applied to a method transferring design RIM data to construction BIM data.

Analyzing Characteristics of Design-Build Delivery System in Korea Using System Dynamics Modeling (시스템다이내믹스 모델을 이용한 국내 설계시공 일괄입찰 발주방식 특성분석)

  • Lee, Hyun-Soo;Ji, Sae-Hyun;Park, Moon-Seo;Song, Sang-Hun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.119-131
    • /
    • 2007
  • Design build (DB) is a construction project delivery system which has become one of the favored ones and the growth of DB by the public agencies has been steadily increasing. DB can be viewed as an evolutionary project delivery system, since DB project team members collaborate on work with each other, keep seeking cost effective and innovative alternatives that meet the construction needs of the project. Thus DB outperformed others in delivery speed, cost saving, and turnover quality. In Korea, DB projects likewise have steadily increased that it is needed to analyze characteristics of DB delivery system in Korea. For that purpose, this research would offer an analysis of characteristics of DB delivery system in Korea using system dynamics model with investigating the public market trend, comparing DB performance to DBB, and analyzing questionnaire survey.

Industrialized Building Systems for the Kingdom of Saudi Arabia

  • Santoso, Try P.;Trigunarsyah, Bambang;Hassanain, Mohammad A.;Tuffaha, Firas
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.73-79
    • /
    • 2017
  • Rapidly expanding population in the Kingdom of Saudi Arabia has a massive impact to put pressure on the shortage of housing and existing infrastructure. With average population growth rate of 1,9% yearly, the population in Saudi Arabia is projected to increase from 31 million in 2015 to 37 million in 2025. According to the housing ministry, Saudi Arabia needs to provide 3.3 million units to meet the demand in 2025, which is about 300,000 unit a year. In the past 40 years, using the conventional construction method, the Saudi construction industry was only able to build about 150,000 units per year. To meet the demand gap for the housing shortage, a new approach and innovation in construction methods are needed. Industrialized construction as an approach in construction methods has been studied and implemented in some countries that experienced similar corncerns. Industrialized construction can be defined as the implementation of manufacturing methods to construction-related activities to improve quality, reduce cost and project duration. Compared to the conventional construction method, prefabrication as industrialized construction methods has reduced construction labor on-site by 9.5%, construction project duration by 20%, and construction waste by 56%. It improves the quality, durability and cost saving not only for construction project owners, but also construction contractors. This paper discusses the possibility of 'industrialization' of building system in the Kingdom of Saudi Arabia as a solution for the housing shortage. It is an initial part of a study aims to develop a framework to develop industrialized building system in the Kingdom of Saudi Arabia. The is paper based on extensive literature review and case studies.

  • PDF

A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

Demonstration of UAS Image-Based Intellectual Demarcation in Cadastral Reexaminationy (지적재조사에서 UAS 영상 기반 지적 경계확정 시범 연구)

  • Kim, Dal-Joo;Kang, Joon-Oh;Han, Woong-ji;Lee, Yong-Chang
    • Journal of Urban Science
    • /
    • v.7 no.1
    • /
    • pp.29-38
    • /
    • 2018
  • The cadastral rehabilitation project, which has been implemented since 2012, is a project to re-examine the national land that is not in conformity with the cadastral map, There is a lot of trouble in securing financial resources for business execution. This study examines the utility of UAS(Unmanned Aerial System) image - based cadastral demarcation as an alternative to budget reduction in the current state of cadastral rehabilitation, reasonable boundary adjustment, UAV(Unmanned Aerial Vehicles) is used to create 3D models and orthoimages of business districts, and to check accuracy by superimposing and comparing with digital maps of NGII(National Geographic Information Institute). As a result of the study, the accuracy of the 3D model and the orthoimage through the SfM(Structure-from-Motion) - based image interpretation of the digital map of the NGII were derived. In particular, we confirmed the similarity of UAS-based orthoimage with the cadastral boundaries affirmation, It is anticipated that the cost saving effect of current survey and boundary survey can be expected. In addition, it is easy to prepare a report to reduce civil complaints, which is a problematic element of the adjustment.

ASEAN+3 Satellite Image Archive for Environmental Study

  • Vibulsresth, Suvit
    • Proceedings of the KSRS Conference
    • /
    • 2002.10a
    • /
    • pp.803-803
    • /
    • 2002
  • Several environmental problems have occurred and extremely affected throughout the East Asia region. Satellite imageries and spatial information have been used in the applications of environmental and natural hazard management for years. Sharing these data and resources in the community is considered as one of the optimal solution. It would consequently bring cost saving to all participated countries and eventually be beneficial to mankind as a whole. Encouraged by these factors, ASEAN+3 Satellite Image Archive for Environmental Study project was submitted by Thailand in the 3rd Senior Official Meeting between ASEAN, China, Japan and Korea (SEOM+3 Meeting) and approved by the SEOM+3. The main objectives of this project are to share satellite images, information related to natural resources and environmental issues, and to provide data information services to all ASEAN+3 countries. The proposed system is basically embedded by distributed system. The network of data users, data providers, and the center will be established using the Internet. User can access, navigate, display, and even download some archived contents. Its service site can be generally categorized into two parts, which are environmental related data archive and the Integrated satellite image catalogue. The extension of web based GIS is also planned for future development so that GIS users can conduct some preliminary analysis directly on line. This presentation will indicate scope of work, system, working scenario, and work plan of the project.

  • PDF

A Study on Cost Management at the Pre-construction Phase in the Korean Construction Market (공공건설사업 시공 전 단계 사업비관리 개선에 관한 연구)

  • Kim Min-Kee;Shin Sung-Hoon;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.265-270
    • /
    • 2002
  • Frequent design changes or unnecessary project executions due to illogical practice, lack of feasibility study and, hasty drive have raised problems of budget waste in Korean construction projects. Since the MOCT (Ministry of Construction & Transportation) published Master Plan for budget efficiency for government projects, there have been a lot of policy efforts for budget saving. However, it has been pointed out that cost management at the pre-construction phase, which greatly influences the cost still remains imperfect. The target cost for government clients is not being estimated reasonably, and cost controlling at the pre-construction phase is not yet being carried out properly for keeping the budget. Therefore, improved construction cost management at the pre-construction phase was proposed in this paper. The cost management systems of advanced countries were investigated for it, and the issues were drawn from the cost management systems of these countries. On the basis of the issues, the present conditions and problems of domestic construction cost management at the pre-construction phase were analyzed for suggestion.

  • PDF

Cost Effective Analysis of Recall Methods for Cervical Cancer Screening in Selangor - Results from a Prospective Randomized Controlled Trial

  • Abdul Rashid, Rima Marhayu;Ramli, Sophia;John, Jennifer;Dahlui, Maznah
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.15 no.13
    • /
    • pp.5143-5147
    • /
    • 2014
  • Cervical cancer screening in Malaysia is by opportunistic Pap smear which contributes to the low uptake rate. To overcome this, a pilot project called the SIPPS program (translated as information system of Pap smear program) had been introduced whereby women aged 20-65 years old are invited for Pap smear and receive recall to repeat the test. This study aimed at determining which recall method is most cost-effective in getting women to repeat Pap smear. A randomised control trial was conducted where one thousand women were recalled for repeat smear either by registered letter, phone messages, phone call or the usual postal letter. The total cost applied for cost-effectiveness analysis includes the cost of sending letter for first invitation, cost of the recall method and cost of two Pap smears. Cost-effective analysis (CEA) of Pap smear uptake by each recall method was then performed. The uptake of Pap smear by postal letter, registered letters, SMS and phone calls were 18.8%, 20.0%, 21.6% and 34.4%, respectively (p<0.05). The CER for the recall method was lowest by phone call compared to other interventions; RM 69.18 (SD RM 0.14) compared to RM 106.53 (SD RM 0.13), RM 134.02 (SD RM 0.15) and RM 136.38 (SD RM 0.11) for SMS, registered letter and letter, respectively. ICER showed that it is most cost saving if the usual method of recall by postal letter be changed to recall by phone call. The possibility of letter as a recall for repeat Pap smear to reach the women is higher compared to sending SMS or making phone call. However, getting women to do repeat Pap smear is better with phone call which allows direct communication. Despite the high cost of the phone call as a recall method for repeat Pap smear, it is the most cost-effective method compared to others.

RFID Technology Applications with PMIS for Managing RMC Truck Operations

  • Kim, Seung-Ho;Kim, Sang-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.468-481
    • /
    • 2011
  • This research presents a strategy and information system to manage the logistics of delivery ready mixed concrete (RMC) under the integrated environment of PMIS+RFID. PMIS is system tool and technique used in construction sectors to delivery information. Information that can be extracted electronically in real time is more valuable than data gathered and maintained manually. RFID technology can help to improve data accuracy through supply chains and by identifying products and objects at specific points through automatic identification. The objectives of these two implementations can be able to improve the efficiency of logistics management for RMC truck process, and to verify the technical and practical feasibility of PMIS+RFID application in construction industry. This may be realistic given the dynamics of daily activities on construction sites. This research is focused on examples on real world case study, applications and research theme related and connected to PMIS+RFID technology. It demonstrated that PMIS+RFID technology has been automatically implemented and has shown process information about the RMC truck and the overall status information about it, both quickly and accurately. As a result, the construction site where needs 300 $m^3$ pouring (50 RMC trucks) per day can be reduced total 250 minutes. Moreover, this time saving is related to the labour cost saving. From the case studies, RFID+PMIS system was proven in terms of effectiveness rather than current method.

Analysis for the Economic efficiency of District Heating and Gas Engine Co-generation System comparing with Central Heating System (중앙난방방식을 지역난방.소형열병합난방방식으로 전환시의 경제성 비교 분석)

  • Kim, Kyu-Saeng;Lee, Sang-Hyeok;Hong, Kyung-Pyo;Won, Young-Jae
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.459-465
    • /
    • 2007
  • This study was conducted to calculate the LCC of a apartment complex with a type of heating system, district heating and cogeneration system. For the purpose of analyzing LCC according to size of apartment complex, 500, 1,500 and 4,000 houses of model apartment selected. This research performs design of heating system and the life cycle cost analysis including an initial cost, energy cost, maintenance and operation cost, replacement cost and renovation cost during the project period(15years). According to the calculated results, 1) Initial cost of cogeneration system with 500, 1500 and 4000 houses is higher than district heating system each of 20%, 13%, 12%. 2) In case of cogeneration system, the payback period by electric generation is 5.21, 4.92 and 4.47 years and saving cost was calculated 29 billion won, 94 billion won and 262 billion won after payback period. 3) Cogeneration system LCC was 1.12, 1.07 and 1.06 times larger than district system with the size of apartment complex. According to the case of this study district heating system is more efficient than cogeneration system in terms of the reduction of LCC. 4) Gas Engine Co-generation System is more efficient than other systems because it can collect progressive part from electric charge progressive stage system. However, the efficiency is decreasing because of raising of fuel bills(LNG) and lowering of power rate for house use. Especially the engine is foreign-made so the cost of maintenance and repair is high and the technical expert is short. 5) District heating is also affected by fuel bills so we should improve energy efficiency through recovering of waste heat(incineration heat, etc.). Also, we should supply district cooling on the pattern of heat using of let the temperature high in winter and low in summer.

  • PDF