• Title/Summary/Keyword: Project Cost Calculation

Search Result 106, Processing Time 0.026 seconds

A study on the normal project duration development for the construction of multi-utility tunnel in the existing city (기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구)

  • Lee, Seong-Won;Lee, Pil-Yoon;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.677-685
    • /
    • 2018
  • In construction, schedule management is the basic but important step, for the effective schedule management, the preparation of the reasonable schedule table should be prioritized. In the design stage, the optimal construction period can be selected through comparison of various conditions and construction methods considering weather conditions and site characteristics. But, At the planning phase, it is difficult to select the effective method and calculate the proper construction period by the basic data(D/B) analysis. In this paper, the construction method considering characteristics of each type and conditions of existing city was selected. For the reasonable duration calculation, we analyzed the unit schedule for RC method for open type and Shield TBM method for tunnel type. The normal project duration of construction assuming of 1,200m of extension and every 200m of ventilation was prepared by integrating each unit schedule. It was analyzed that it took 893 days for the open type and 616 days for the tunnel type. The results of this study will help to make type selection and normal project duration more easily in the planning phase. If it is linked to the design stage, it will be easy to estimate the process and construction cost.

Calculation of Total Benefit by the Contingent Valuation Method for Cost-Benefit Analysis: Focusing on Income and Distance-Decay Effects (비용편익분석을 위한 조건부가치측정법에서의 총편익 산정: 소득효과 및 거리-소멸 효과를 중심으로)

  • Lee, Jongyearn
    • KDI Journal of Economic Policy
    • /
    • v.36 no.1
    • /
    • pp.43-80
    • /
    • 2014
  • This study suggests a model for calculating total benefit rigorously to use the contingent valuation method (CVM) in cost-benefit analysis (CBA). Estimating households' willingness to pay through survey method, the study attempts to demonstrate if a respondent's income and the distance between a respondent's residence and the location of a target facility affect her willingness to pay. The estimation results from a structural model show that income and distance-decay effects exist and that the calculated total benefit varies largely when these effects are ignored. The study emphasizes the effects of income and distance-decay on the total benefit must be carefully considered in using CVM for CBA. Even though the total project cost is precisely estimated, the benefit/cost (B/C) ratio may differ largely when the total benefit is not correctly calculated. Also, an ad hoc model generates significantly different estimates from the utility difference model this study adopted. The difference in estimates suggests that the total benefit has to be estimated by a structural model. Finally, simulations are performed to check the validity of the model as well as to predict consequences when income and distance-decay effects are not properly treated. The results from simulations reveal it is not desirable to ignore those effects considering the perspectives of balanced regional development.

  • PDF

A Study on the Evaluation Management of Public Housing Architectural Competition using BIM (공공 공동주택의 BIM적용 설계 경기 평가관리에 한 연구 - BIM적용 가능 평가항목 선정을 중심으로 -)

  • Min, Byoung-Jik;Lim, Jae-Bok;Kim, Ju-Hyung;Seo, Jong-Won;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.2 no.2
    • /
    • pp.1-9
    • /
    • 2012
  • In Korea, recently, efforts have been made to introduce BIM(Building Information Modeling) to housing complex projects. However, there have been several problems including excessive competition for building design and outcome-oriented evaluation due to a lack of clear evaluation criteria and poorly organized management process. Under this circumstance, the study surveyed opinions of project managers and conducted a pilot test to improve evaluation criteria of BIM-based design for housing complexes. The objective is to assess the level of BIM technology and its applicability, and to propose a list of reasonable evaluation criteria for better project management. First, the study examined the current condition of evaluation on the BIM-based housing complexes, and identified 15 preliminary items that might be suitable for application of BIM. Second, the study conducted a pilot test for the 15 items to determine their suitability for the level of BIM technology, clarity of the calculation process, and the extent of fulfilling information quality, and short-listed eight items for application of BIM. In particular, in the design concept stage, mostly 3D visual images and area-related items are suitable for BIM-based evaluation. Accordingly, formerly used items such as project cost, energy and environmental analysis, building structure, and facilities were deemed more relevant to the subsequent stages of basic design and its implementation.

A Study on the Application Plan of the Cadastral Resurvey in South Korea Through a Case Analysis of the Japanese Private-Public Boundary (일본 관민경계 사례분석을 통한 우리나라 지적재조사 적용방안에 관한 연구)

  • KIM, Jae-Myeong;LEE, Dong-Hwa
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.22 no.1
    • /
    • pp.39-50
    • /
    • 2019
  • Since the "Special Law on Cadastral Resurvey" was enforced in 2012, the Cadastral Resurvey Project in South Korea has been promoted in earnest. However, it has been difficult to obtain the following items: a budget for the project, the establishment of land boundaries by increasing/decreasing the area of the parcels of land in the downtown area, the calculation of the adjustment fee, and the analysis of the relationship between the business owner and the landowner in regards to conflicts of opinion. The analysis of Japan's private-public boundary system, which is promoting the Cadastral Resurvey ahead of South Korea, should not attempt to determine complex interests, especially when they are pursuing consensus of the boundary setting portion of the Cadastral Resurvey Project. Therefore, this study shows that there is a need to reduce the number of stakeholders and promote them by using a step-by-step process. The introduction of cost-saving measures for the Cadastral Resurvey through a private-public boundary preliminary investigation is needed. This study suggested the following: link the precision road map construction business using MMS, introduce the preliminary research projects for the Cadastral Resurvey, and gather the important land survey information for the private-public boundary basic survey. In order to establish the utilization base, the researcher proposed linking the downtown area regeneration with the downtown area planning business.

DGNSS-CP Performance Comparison of Each Observation Matrix Calculation Method (관측 행렬 산출 기법 별 DGNSS-CP 성능 비교)

  • Shin, Dong-hyun;Lim, Cheol-soon;Seok, Hyo-jeong;Yoon, Dong-hwan;Park, Byungwoon
    • Journal of Advanced Navigation Technology
    • /
    • v.20 no.5
    • /
    • pp.433-439
    • /
    • 2016
  • Several low-cost global navigation satellite system (GNSS) receivers do not support general range-domain correction, and DGNSS-CP (differential GNSS) method had been suggested to solve this problem. It improves its position accuracy by projecting range-domain corrections to the position-domain and then differentiating the stand-alone position by the projected correction. To project the range-domain correction, line-of-sight vectors from the receiver to each satellite should be calculated. The line-of-sight vectors can be obtained from GNSS broadcast ephemeris data or satellite direction information, and this paper shows positioning performance for the two methods. Stand-alone positioning result provided from Septentrio PolaRx4 Pro receiver was used to show the difference. The satellite direction information can reduce the computing load for the DGNSS-CP by 1/15, even though its root mean square(RMS) of position error is bigger than that of ephemeris data by 0.1m.

Comparative Evaluation between Administrative and Watershed Boundary in Carbon Sequestration Monitoring - Towards UN-REDD for Mt. Geum-gang of North Korea - (탄소 저장량 감시에서 배수구역과 행정구역의 비교 평가 - 금강산에 대한 UN-REDD 대응 차원에서 -)

  • Kim, Jun-Woo;Um, Jung-Sup
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.5
    • /
    • pp.439-454
    • /
    • 2013
  • UN-REDD (United Nations programme on Reducing Emissions from Deforestation and forest Degradation) is currently being emerged as one of important mechanism to reduce carbon dioxide in relation to the deforestation. Although administrative boundary has already gained world-wide recognition as a typical method of monitoring unit in the process of GHG (Greenhouse Gas) reduction project, this approach did not provide a realistic evidence in the carbon sequestering monitoring in terms of UN-REDD; the meaningful comparison of land use patterns among watershed boundaries, interpretation for distribution trends of carbon density, calculation of opportunity cost, leakage management, etc. This research proposes a comparative evaluation framework in a more objective and quantitative way for carbon sequestering monitoring between administrative and watershed boundary approaches. Mt. Geumgang of North Korea was selected as a survey objective and an exhaustive and realistic comparison of carbon sequestration between the two approaches was conducted, based on change detection using TM satellite images. It was possible for drainage boundary approach to identify more detailed area-wide patterns of carbon distribution than traditional administrative one, such as estimations of state and trends, including historical trends, of land use / land cover and carbon density in the Mt. Geumgang. The distinctive changing trends in terms of carbon sequestration were specifically identified over the watershed boundary from 4.0% to 34.8% while less than 1% difference was observed in the administrative boundaries, which were resulting in almost 21-22%. It is anticipated that this research output could be used as a valuable reference to support more scientific and objective decision-making in introducing watershed boundary as carbon sequestering monitoring unit.

Study of 'Education-Training-Certificate of Qualification' Design for the Fashion Accessories Production Based on the National Competency Standards (패션소품생산 분야의 국가직무능력표준 기반 교육훈련자격 설계에 관한 연구)

  • Suh, Seunghee;Lee, Shin-Young
    • Journal of the Korean Society of Costume
    • /
    • v.65 no.2
    • /
    • pp.125-143
    • /
    • 2015
  • This study is to propose an 'education-training-certificate of qualification' design of fashion accessories production, which can be applied to education in universities and individuals. It is based on the National Competency Standards (NCS), which was developed through the '2013 National Competency Standards Development Project' for the fashion accessories production. FGI (Focus Group Interviews), which is a research methodology, is carried out on target groups of educational experts and specialists in the field of fashion accessories production. Through this, five courses were suggested; first, 'fashion accessories design' course was proposed for the education and training of 'design development' and 'development of raw materials'. Secondly, 'fashion product production' course was proposed for the education and training of 'production of samples'. Thirdly, 'fashion product manufacture and planning' course was proposed for the competency element units: 'calculation of cost', 'determination of mass production model and price', 'planning of the main manufacturing process' and 'ordering of raw materials'. Lastly, 'mass production of fashion products' course and the 'field practice of fashion product manufacture' course were proposed for the competency element units: 'planning for mass production', 'preparation for mass production', 'mass production' and 'inspection of completed products'. In addition, a new certificate of 'technician of fashion accessory production' was proposed in order to test qualified skills for the fashion accessories production. The test is composed of a written examination of short-answer questions, technical drawing and production.

Development and Application of Menu Engineering Technique for University Residence Hall Foodservice (대학 기숙사 급식의 메뉴 운영 특성을 고려한 Menu Engineering기법 개발 및 적용)

  • 양일선;이해영;신서영;도현욱
    • Korean Journal of Community Nutrition
    • /
    • v.8 no.1
    • /
    • pp.62-70
    • /
    • 2003
  • This article aims to summarize the development and application of menu engineering technique, 'Menu Engineering Modified by Preference (MEMP)'. The site selected for this project was a foodservice operation in Yonsei University residence hall. Sales and food costs data were collected from the daily sales reports for 1 month, and the survey of food preference was conducted during May, 1999. Statistical data analysis was completed using the SAS/Win 6.12 for descriptive analysis. The calculation for menu analysis were carried out with MS 2000 Excel spreadsheet program. This MEMP technique developed had 6 category criteria and 2 dimensions of the contribution margin (CM) and the menu mix modified% (MMM%) . The MMM% was calculated by the sales volumes and also weighted by food preference. The CM and MMM% for each item were compared with a mean menu CM as well as a 70% rule. Four possible classifications by MEMP were fumed out as 'STAR', 'PLOWHORSE', 'PUZZLE', 'DOG'. 'STAR' items were the most popular and profitable items and required to maintain rigid specifications for quality. The decision actions for 'PLOWHORSE' menu items which were relatively popular, but yield a low menu average CM included combining a plowhorse item with lower cost products and reducing the frequency of serving or serving size. There was a need for 'PUZZLE' items to be changed in the menu combination, improve recipe, and promote menu. The last DOG' items were desired to be deleted. This study demonstrates that menu information can be interpreted more easily with MEMP. The use of MEMP is therefore an effective way to improve management decisions about menu of university residence hall foodservice.

Case study of random vibration analysis of train-bridge systems subjected to wind loads

  • Zhu, Siyu;Li, Yongle;Togbenou, Koffi;Yu, Chuanjin;Xiang, Tianyu
    • Wind and Structures
    • /
    • v.27 no.6
    • /
    • pp.399-416
    • /
    • 2018
  • In order to reveal the independent relationship between track irregularity and wind loads, the stochastic characteristics of train-bridge coupling systems subjected to wind loads were investigated by the multi-sample calculation. The vehicle was selected as 23 degrees of freedom dynamical model, and the bridge was described by three-dimensional finite element model. It was assumed that the wind loads were random processes with strong spatial correlation, while the track irregularities were stationary random ones. As a case study, a high-speed train running on a cable-stayed bridge subjected to wind loads was studied. The effect of rail irregularities was deemed to be independent of the effect of wind excitations on the coupling system in the same wind circumstance for the same project, leading to the conclusion that the effect of wind loads and moving vehicle could be calculated separately. The variance results of the stochastic responses of vehicle-bridge coupling system under the action of wind loads and rail irregularities together were equivalent to the sum of the variance of the responses induced by each excitation. Therefore, when one of the input excitations is different, only the effect of changed loads needs to be assessed. Moreover, the new calculated results were combined with the effect of unchanged loads to present the stochastic response of coupling system subjected to the different excitations, reducing the cost of computations. The stochastic characteristics, the CFD (cumulative distribution function) of the coupling system with different wind velocities, vehicle speed, and vehicle marshalling were studied likewise.

Elastoplastic FEM analysis of earthquake response for the field-bolt joints of a tower-crane mast

  • Ushio, Yoshitaka;Saruwatari, Tomoharu;Nagano, Yasuyuki
    • Advances in Computational Design
    • /
    • v.4 no.1
    • /
    • pp.53-72
    • /
    • 2019
  • Safety measures for tower cranes are extremely important among the seismic countermeasures at high-rise building construction sites. In particular, the collapse of a tower crane from a high position is a very serious catastrophe. An example of such an accident due to an earthquake is the case of the Taipei 101 Building (the author was the project director), which occurred on March 31, 2002. Failure of the bolted joints of the tower-crane mast was the direct cause of the collapse. Therefore, it is necessary to design for this eventuality and to take the necessary measures on construction sites. This can only be done by understanding the precise dynamic behavior of mast joints during an earthquake. Consequently, we created a new hybrid-element model (using beam, shell, and solid elements) that not only expressed the detailed behavior of the site joints of a tower-crane mast during an earthquake but also suppressed any increase in the total calculation time and revealed its behavior through computer simulations. Using the proposed structural model and simulation method, effective information for designing safe joints during earthquakes can be provided by considering workability (control of the bolt pretension axial force and other factors) and less construction cost. Notably, this analysis showed that the joint behavior of the initial pretension axial force of a bolt is considerably reduced after the axial force of the bolt exceeds the yield strength. A maximum decrease of 50% in the initial pretension axial force under the El Centro N-S Wave ($v_{max}=100cm/s$) was observed. Furthermore, this method can be applied to analyze the seismic responses of general temporary structures in construction sites.