• Title/Summary/Keyword: Project Control System

Search Result 839, Processing Time 0.03 seconds

Development of Construction Project Control System for Large Sized Construction by Process and Data Modeling (대형건설공사의 프로세스 및 데이터 모델링을 통한 건설프로젝트관리체계 구축에 관한 연구)

  • Choi Yoon-Ki;Lee Hyun-Soo;Hwang Young-Sam;Kim Young-Suk;Kim Woo-Young;Song Young-Woong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.153-161
    • /
    • 2004
  • The systematic material and labor management planning should be established on accomplished EVM data. The matrix method of integrated cost and schedule was used with common category concept according to the construction project control system. The construction project control system was suggested through analyzing process and data modeling based on integrated cost, schedule and material. Information of construction project can be developed the relationship between the field data and the integrated cost, schedule database. Process and data modelling is provide a standard data format which are related to the material, labor management based on integrated cost, schedule database.

The Design and Implementation of Project Management Information System based on 4CM (4CM기반의 건설사업관리 시스템 개발 및 구현)

  • Choi, Sung Youn;Kim, Jae Soo
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.7 no.2
    • /
    • pp.101-113
    • /
    • 2011
  • As information and communication technology advances driving the rapid evolution of e-commerce and e-business becomes on effective marketing means for both business and institutions, the industry deals with these changes and has a profound, positive impact on production and operations management. But the construction industry falls behind compared with other industries in productivity, informationalization, automatization and globalization. Especially even though the informationalization is inevitable in any developing society, a number of construction industries can hardly cope with it properly. As the construction industry gets informationalized and advanced, the introduction of PMIS (Project Management Information System) is making progress actively for the effective construction project control and productivity improvement in construction. With the government officials' political promotion and the rising desire for construction informationalization of enterprises, many are attempting to develop integrated systems or to replace a previous system with a more advanced alternative. Construction Industry, however, has the peculiar properties that the period for the completion of construction is limited and on top of that, most of its data processing systems are seen as being an early stage in the design of management information systems. As a result, there are extremely few applications in the construction industry. In this paper, we propose the PMIS system based on new model 4CM that improves on previous models.

The Development Measuring System of Temperature Effect to Produce Electric Power of Solar Cell

  • Sadmai, Ong-art
    • International journal of advanced smart convergence
    • /
    • v.4 no.1
    • /
    • pp.104-113
    • /
    • 2015
  • This paper focuses on a temperature effects on a PV panel which has been installed in Thailand. The main objective is cleaning PV panels and reduce temperature of PV panel by water injects from waterway and experimental results of PV power what it is difference. This project is designed by PLC control system which water injects and control PV temperature, In addition, this project consists of hardware and software such as water pump, water injection and PLC control has been automatically and it can be control system manually. The automatic control system is working when PV temperature rises up over 45 degree Celsius after that the pumping machine would inject water to the surface of PV panels and it must be stop when the PV panel temperature comes down less than 45 degree Celsius. The result of actual experimental found that the control system has been done correctly under specify condition. The experimental has been shown electrical data before and after water injects on PV system found that the electrical power a bit increases and The energy has been taken from PV panel less than energy consumption equipment of control system which taken to operate the water injecting system.

Project Implementation an Management for the State of the Art Computerized Supervisory Systems (최신의 컴퓨터기술을 적용한 원방감시시스템의 사업수행과 관리)

  • 윤갑구
    • Journal of the Korean Professional Engineers Association
    • /
    • v.26 no.3
    • /
    • pp.69-79
    • /
    • 1993
  • This paper explains about general considerations and project management for a State of the Art utility supervisory systems. [1] The implementation and management of a supervisory system design project requires both a dedication of resources and application of good communications in order to be suc-cessful. [2] Success is on time delivery of a system to a satisfied customer at the proposal cost, [3] The recent experience of a company plus the collected comments from a number of ex-perienced control center project management provide a guideline for the company who is considering such a project. The Comments reflect typical situations or decision points faced by the project Manage.[2] This paper also attempts to help engineers in the task of specifying buying, and instal-ling a supervisory system[1]

  • PDF

An introduction to the MMI system of strip casting Process (박판주조공정의 MMI 시스템 소개)

  • Joo, Moon-G.;Lee, D.S.;Kim, Y.H.;Kang, T.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07d
    • /
    • pp.2778-2780
    • /
    • 2000
  • MMI system for strip caster 2 is described. It has been developed as a PC-based MMI system whose data is collected from the VME-based control system by ETHERNET. MMI elements that mimic the caster and its utilities are designed by using commercial program. In order to implement the UDP/IP communication in MMI, UDP/IP manager program with DDE that is a intercommunication protocol in MS-window is developed and connected with MMI mimics. Operator commands in MMI system are carried out immediately in VME system and the responses are displayed on MMI system. The developed MMI system has been proven to be convenient and stable through the operation of the past 5 years.

  • PDF

Comparative Performance Analysis of Robot-based Automated Construction System Using a Real Scale Test Project

  • Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.339-349
    • /
    • 2015
  • A large-scale research project to develop a robot-based automated building construction system for steel structures was successfully conducted in South Korea. This paper discusses the results of the real-scale test and the key lessons gained from the testing process. The system was assessed in terms of system productivity, construction cost, quality control, and safety improvements. While the productivity of the automated system showed an improvement of about 9.5%, the construction cost was about six times higher than that of the conventional method. The field test also indicated that the automated system requires more on-site quality control measures. However, because the system can eliminate the causes of various safety accidents, safety levels might be expected to be improved significantly. It is expected that this paper will provide knowledge and insight for developing new systems, and the results of the real-scale test might be useful for other researchers and similar research projects in the future.

Safety Estimation of High Pressure Drop Control Valve for Offshore Structures (해양플랜트용 고압.고차압 제어밸브의 구조 안전성 평가)

  • Kim, Jae-Woong
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.20 no.5
    • /
    • pp.553-558
    • /
    • 2011
  • This study have goal with conceptual design for offshore structures of high pressure drop control valve for localization valve for development accomplished with flow analysis based on provision of ANSI B16.34, ANSI B16.10, ANSI B16.25. In order to localize the Offshore structures high pressure drop control valve. This study is numerical analysis for zambil offshore project of high pressure drop control valve. The solver which ANSYS workbench used for offshore structures analysis. The working fluids assumed the glycerin(C3H8O3). The structural analysis used ANSYS which is a commercial code. Stress analysis result of internal pressure in valve showed lower than yield strength. This is expect to need more detail design and verification for stem and disk structure. In this study a multi-disk of high pressure drop control valve is designed and manufactured. Then, the flow rate and high pressure dorp of fluids flowing in the high pressure drop control valve is CAE. So, this system can be easily substituted for the existing zambil offshore project system. Finally, safety estimation for trim design of high pressure drop control valve for offshore structures.

The HPRF system for PEFP 20MeV proton linac

  • Seol, K.T.;Kwon, H.J.;Song, Y.G.;Park, M.Y.;Cho, Y.S.
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 2004.10a
    • /
    • pp.683-684
    • /
    • 2004
  • The RF system for PEFP 20MeV proton linear accelerator is described. The RF system for 3MeV RFQ was already installed and operated to drive the RFQ. The klystron was tested up to 600kW itself and operated up to 350kW routinely. The HPRF dummy load was stabilized with the change of the coolant. Preparation of 20MeV DTL HPRF test has been completed. LCP and PLC system for klystron power supply was already prepared. Voltage fluctuation was measured during klystron test. Voltage control feedback loop seems to be re-adjusted.

  • PDF

Development of standard logic network for PWR NSSS System design (경수로계통설계 표준 Logic Network의 개발)

  • 박준원;이병령;이판권;이해준;송태길;김동희;최현호
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1993.10a
    • /
    • pp.212-226
    • /
    • 1993
  • The self-reliance of NSSS System Design is required not only the design capability to perform the system design but also the management capability to control the resource and time for the Project effectively. The purpose of this study is to develop the simplified standard Logic Network that is scheduled on the time and resource using the PERT/CPM method. That is mainly focused on Ulchin 3&4 Project. We prepare the management tool of NSSS System Design project. And we can utilize it as a reference tool for the similar project which are complex and long term in a next project.

  • PDF

Advanced Real Time Simulation Platform for Control and Protection Studies of LSIS 80kV 60MW Jeju HVDC System

  • Iwa, Kartiwa;Lee, Kyung-Bin
    • Proceedings of the KIPE Conference
    • /
    • 2013.11a
    • /
    • pp.85-86
    • /
    • 2013
  • This paper describes the physical configuration and features of the advanced control and protection devices, and operation control and monitoring system that are connected to a real time simulator for LS Industrial System 80kV 60 MW Jeju HVDC Pilot Project. Highlight of simulation result are provided to demonstrate the control and protection functionality.

  • PDF