• 제목/요약/키워드: Project Control System

검색결과 839건 처리시간 0.029초

Toward the Application of a Critical-Chain-Project-Management-based Framework on Max-plus Linear Systems

  • Takahashi, Hirotaka;Goto, Hiroyuki;Kasahara, Munenori
    • Industrial Engineering and Management Systems
    • /
    • 제8권3호
    • /
    • pp.155-161
    • /
    • 2009
  • We focus on discrete event systems with a structure of parallel processing, synchronization, and no-concurrency. We use max-plus algebra, which is an effective approach for controller design for this type of system, for modeling and formulation. Since a typical feature of this type of system is that the initial schedule is frequently changed due to unpredictable disturbances, we use a simple model and numerical examples to examine the possibility of applying the concepts of the feeding buffer and the project buffer of critical chain project management (CCPM) on max-plus linear discrete event systems in order to control the occurrence of an undesirable state change. The application of a CCPM-based framework on a max-plus linear discrete event system was proven to be effective.

대형공공공사에 J/V(Joint Venture)시스템의 합리적 도입을 통한 건설사업 효율화 전략 (A Strategy of Construction through Rationally Adapting JV(Joint Venture) in Large Public Constructions)

  • 이태식;김용천;박동찬;선우강;김열규
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 춘계학술대회 논문집
    • /
    • pp.24-29
    • /
    • 2001
  • Despite of the introduction some sorts of the contract and the bid method like CM(Construction management) that will be efficient to manage the construction project. Korean agencies limit to control project management to do large public constructions. In the case of Taiwan, THSRC is apply J/V system in the public construction project, they are accomplishing that expend optimal the cost and save the construction time. To success J/V it has two factors, one is risk management and another is sharing information of construction project. Therefore, we will study to introduce J/V system to our construction project.

  • PDF

A Model Study for Software Development Effort and Cost Estimation by Adaptive Neural Fuzzy Inference System

  • Kim, Dong-Hwa
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.376-376
    • /
    • 2000
  • Several algorithmic models have been proposed to estimate software cost and other management parameters. In particular, early prediction of completion time is absolutely essential for proper advance planning and a version of the possible ruin of a project. However, estimation is difficult because of its similarity to export judgment approaches and for its potential as an expert assistant in support of human judgment. Especially, the nature of the Norden/Rayleigh curve used by Putnam, renders it unreliable during the initial phases of the project, in projects involving a fast manpower buildup, as is the case with most software projects. Estimating software development effort is more complexity, because of infrastructure software related to target-machines hardware and process characteristics should be considered in software development for DCS (Distributed Control System). In this paper, we propose software development effort estimation technique using adaptive neural fuzzy inference system. The methods is applied to case-based projects and discussed.

  • PDF

LMI를 이용한 자기부상 시스템의 $H_{\infty}$ 제어기 설계 ($H_{\infty}$ Controller Design for Electromagnetic Suspension System using LMIs)

  • 장석명;성소영;성호경;김봉섭
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 추계학술대회 논문집 학회본부 B
    • /
    • pp.280-283
    • /
    • 2000
  • In this paper, a fault tolerant control problem is considered for a class of nonlinear system formulated in a gain scheduling form with LMI-based H-inf control technique Key benefits of this proposed scheme are demonstrated in the simulation of an electromagnetic suspension system with actuator and/or sensor failures, and the method is compared with the convensional state-feedback and output-feedback controller. It is clearly observed that the proposed control scheme shows an improved output performance in comparision with convensional methods.

  • PDF

Development of Hard-wired Instrumentation and Control for the Neutral Beam Test Facility at KAERI

  • Jung Ki-Sok;Yoon Byung-Joo;Yoon Jae-Sung;Seo Min-Seok
    • Journal of Electrical Engineering and Technology
    • /
    • 제1권3호
    • /
    • pp.359-365
    • /
    • 2006
  • Since the start of the KSTAR (Korea Superconducting Tokamak Advanced Research) project, Instrumentation and Control (I&C) of the Neutral Beam Test Facility (NB-TF) has been striving to answer diverse requests arising from various facets during the project's development and construction phases. Hard-wired electrical circuits have been designed, tested, fabricated, and finally installed to the relevant parts of the system. In relation to the vacuum system I&C, controlling functions for the rotary pumps, a Roots pump, two turbomolecular pumps, and four cryosorption pumps have been constructed. I&C for the ion source operation are the temperature and flow rate signal monitoring, Langmuir probe signal measurements, gradient grid current measurements, and arc detector circuit. For the huge power system to be monitored or safely operated, many temperature measurement functions have also been implemented for the beam line components like the neutralizer, bending magnet, ion dump, and calorimeter. Nearly all of the control and probe signals between the NB test stand and the control room were made to be transmitted through the optical cables. Failures of coolant flow or beam line vacuum pressure were made to be safely blocked from influencing the system by an appropriate interlock circuit that will shut down the extraction voltage application to the system or prevent damages to the vacuum components. Preliminary estimation of the beam power through the calorimetric measurement shows that 87.9% of the total power of the 60kV/18A beam with 200 seconds duration is absorbed by the calorimeter surface. Most of these I&C results would be highly appropriate for the construction of the main NBI facility for the KSTAR national fusion research project.

Programmable Controller의 명령어 수행 System (Instruction execution system in programmable controller)

  • 최호현;안재봉;유지훈;이영준
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1987년도 한국자동제어학술회의논문집; 한국과학기술대학, 충남; 16-17 Oct. 1987
    • /
    • pp.419-421
    • /
    • 1987
  • The high-speed tendency of Programmable Controller requires a fast processing of instruction. This project investigate the instruction execution system for a fast processing in Programmable Controller.

  • PDF

주택사업의 리스크 원인분석 및 대응방안에 관한 연구 (A Study on the Method of the Risk Management in the Housing Project)

  • 이종규;이주형
    • KIEAE Journal
    • /
    • 제8권2호
    • /
    • pp.79-86
    • /
    • 2008
  • A housing project is very sensitive the changing environment. Therefor, a housing project is the high risk. Therefor in order to be succeed the project it becomes necessary to effectively manage the risk involved in the process of the housing project. This study analysed the risk factors that involved in the process of the housing project as compared with the precede research. The results of this research are as follows : First, complete feasibility study and verification with conviction in market and environment are required. And, securing organization and specificity for simulation and variation of environment are required in the process by step. And then, complaint and flaw are required in the final stage. The results of this study can be used as the guideline to make the risk management system for the housing project.

수용가 자동원방검침 및 부하집중제어 시스템 현장 실증시험연구 (A study on field trial system for automatic meter reading and load control system)

  • 이원빈;문홍석;김석구;양완식
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1988년도 한국자동제어학술회의논문집(국내학술편); 한국전력공사연수원, 서울; 21-22 Oct. 1988
    • /
    • pp.663-668
    • /
    • 1988
  • A study on Automatic Meter Reading and Load Control System used to Distribution Line Carrer has started since 1986, and the field trial system for AMR and LCS was installed to KEPCO on June, 1988. Now this system will be operated for testing. This paper will describe project and planning for field trial of KEPCO.

  • PDF

요구사항 불확실성과 표준화가 소프트웨어 프로젝트 성과에 미치는 영향 : 한국과 미국의 비교연구 (The Impacts of Requirement Uncertainty and Standardization on Software Project Performance : A Comparison of Korea and USA)

  • 나관식
    • Journal of Information Technology Applications and Management
    • /
    • 제11권2호
    • /
    • pp.15-27
    • /
    • 2004
  • Most software projects inevitably involve various types and degrees of uncertainty. Without proper risk assessment and coordination, software projects can easily run out of control and consume significant additional resource. Thus, risk management techniques are critical issues to information system researchers. Previous empirical studies of U.S. software firms support the adoption of development standardization and user requirement analysis techniques in risk-based software project management. Using data collected from software projects developed in Korea during 1999-2000, we conduct a comparative study to determine how risk management strategies impact software product and process performance in countries with dissimilar IT capabilities. In addition, we offer an alternative conceptualization of residual performance risk. We show that the use of residual performance risk as an intervening variable is inappropriate in IT developing countries like Korea where the role of late stage risk control remedies are critical. A revised model is proposed that generates more reliable empirical implications for Korean software projects.

  • PDF

건설 생애주기를 고려한 BIM 기반의 PMIS 활용 (Application of BIM-based PMIS Considering Construction Life-Cycle)

  • 문성우;권기남;김상도;정준호
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.654-657
    • /
    • 2008
  • 최근 건설 프로젝트가 대형화 복잡화됨에 따라 단일 프로젝트의 건설 사업비 규모가 증가하는 반면 IT 산업의 발달과 더불어 건설현장에서 발생하는 다양한 자료 축적이 쉬워지고 있다. 따라서 건설공사 라이프싸이클 관점에서 축적된 실적 데이터를 활용하여 생산성을 향상시키기 위한 연구가 활발히 진행 중이다. 최근 건설사업관리를 위해서 많이 사용하고 있는 PMIS(Project Management Information System)는 시공단계에서 데이터의 축적과 활용에 많은 편리함을 준다. 그러나 대부분의 PMIS는 시공단계에 제한되어 있으며 기획, 설계 및 유지관리의 단계까지는 적용되지 않고 있는 실정이다. 본 논문에서는 기획, 설계, 시공, 유지보수 단계까지 관리를 위한 효율적인 하나의 방안으로 BIM(Building Information Modeling) 기반의 PMIS인 BPMS(BIM-based Project Management System)를 제시한다. BPMS는 대상물의 설계 및 시공정보를 포함하여 건설 생애주기 관점에서 사업관리를 지원하고자 개발되고 있다.

  • PDF