• 제목/요약/키워드: Project Control System

검색결과 839건 처리시간 0.029초

PEFP CONTROL SYSTEM USING EPICS

  • Choi HyunMi;Hong In.Seok;Song YoungGi;Cho YongSub
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2005년도 Proceedings of ISRS 2005
    • /
    • pp.656-658
    • /
    • 2005
  • KAERI (Korea Atomic Energy Research Institute) has been performing the project named PEFP (proton engineering frontier project). PEFP has been performing the project of a high power proton accelerator. Control system for 20 MeV proton accelerating structure has developed. We use the EPICS(Experimental Physics and Industrial Control System) tool kit as a foundation of the control system. EPICS is adopted for control systems which have OPI(OPerator Interface) and IOqlnput Output Controller). We have performed the PEPF control system on SUN workstation host computer. In this paper, we present the vacuum monitor, RFQ, and DTL Turbo pump control system.

  • PDF

요르단연구로건설사업 문서관리시스템 구축 (Establishment of Document Control System for the Jordan Research and Training Reactor Project)

  • 박국남;고영철;우상익;오수열;이두정
    • 산업경영시스템학회지
    • /
    • 제34권4호
    • /
    • pp.49-56
    • /
    • 2011
  • The Project of Jordan Research and Training Reactor (JRTR) officially launched in Aug. 2010. JRTR is the first made-in-Korea nuclear system to be built abroad by year 2015, and Korea Atomic Energy Research Institute (KAERI) is responsible for the design of major systems including the reactor core. While the PDCS (Project Document Control System) being operated by EPC company controls all the documents of the whole Project, KAERI is supposed to have its own system for KAERI documents. Meeting such a need; KAERI has implemented a document control for the JRTR Project into already existing ANSIM (KAERI Advanced Nuclear Safety Information Management) system. The documents of JRTR project to be controlled are defined in the PPM (Project Procedures Manual), QAP (Quality Assurance Procedure) and PEP (Project Execution Program). The ANSIM consists of the document management holder, document container holder and organization management holder. The document management holder, which is the most important part of ANSIM-JRTR, consists of the DDA (Document Distribution for Agreement), IOC (Inter-office Correspondence), PM Memo. (Project Manager Memorandum) and cover sheets of design documents. Other materials such as meeting minutes, sub-department materials and design information materials are stored in an independent COP (Community of Practice). This established computerized document control system, ANSIM, could lessen a burden for project management team and enhance the productivity as well.

Earned Value 기반 프로젝트 관리체계 및 사례연구 (Earned Value based Construction Project Control System)

  • 이유섭;조창연;오규환;김정훈
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.123-130
    • /
    • 2002
  • 건설공사 관리프로세스 및 관리체계는 건설공사를 성공적으로 수행하는데 필수적인 요소이다. 이러한 공사관리체계는 건설공사를 계획${\cdot}$관리함에 있어서 일정, 비용, 성과측정, 현금흐름(cash flow)예측 등의 업무체계가 통합 또는 연계될 때, 효과적인 관리도구로 활용할 수 있으며, 이는 건설공사에 대한 정확하고 신속한 의사결정을 도모하고 관리의 효율성을 증대시킬 수 있다. 이를 위해 우리나라 건설업계에서는 건설공사의 수행과정을 효과적으로 계획하고 통제, 관리한 수 있도록 업무프로세스를 혁신하고, 이를 지원하는 공사관리시스템의 구축에 많은 시간과 노력을 기울이고 있다. 본 연구에서는 건설공사를 효과적으로 계획, 관리하여 업무프로세스의 투명성을 확보하고 비용효과를 증대시키기 위한 방안의 일환으로 구축되고 있는 공사관리시스템의 개발 동향과 기능적 특징을 비교 분석하고, 구축된 공사관리시스템이 유효하게 기능할 수 있도록 하기위한 현안과제와 대응방안을 제시하고 있다.

  • PDF

EV기반 공사관리시스템 기능의 비교분석 연구 (Earned Value based Construction Project Control System)

  • 이유섭
    • 한국건설관리학회논문집
    • /
    • 제5권1호
    • /
    • pp.168-174
    • /
    • 2004
  • 건설공사 관리프로세스 및 관리체계는 건설공사를 성공적으로 수행하는데 필수적인 요소이다. 이러한 공사관리체계는 건설공사를 계획$\cdot$관리함에 있어서 일정, 비용, 성과측정, 현금흐름 예측 등의 업무체계가 통합 또는 연계될 때, 효과적인 관리도구로 활용할 수 있으며, 이는 건설공사에 대한 정확하고 신속한 의사결정을 도모하고 관리의 효율성을 증대시킬 수 있다. 이를 위해 우리나라 건설업계에서는 건설공사의 수행과정을 효과적으로 계획하고 통제, 관리할 수 있도록 업무프로세스를 혁신하고, 이를 지원하는 공사관리시스템의 구축에 많은 시간과 노력을 기울이고 있다. 본 연구에서는 건설공사를 효과적으로 계획, 관리하여 업무프로세스의 투명성을 확보하고 비용효과를 증대시키기 위한 방안의 일환으로 구축되고 있는 공사관리시스템의 개발 동향과 기능적 특징을 비교 분석하고, 구축된 공사관리시스템이 유효하게 기능할 수 있도록 하기위한 현안과제와 대응방안을 제시하고 있다.

특성화고의 태양광 추적 제어 시스템 개발 프로젝트법이 학습자의 과제 수행 능력에 미치는 효과 (The Effect on Task Performance Ability of Project Method to Develop Solar Tracking Control System in Specialized High School)

  • 한유진;김방희;김진수
    • 공학교육연구
    • /
    • 제17권1호
    • /
    • pp.3-11
    • /
    • 2014
  • The purpose of this study was to verity the effect of project method on the task performance ability in development of a solar-tracking-control-system of specialized high school. In order to carry out this study, 2 classes of technical high school in Jeonbuk are chosen as experimental and control groups. The experimental group was taught by project method and the control group was taught by traditional instruction. Project method was designed by 4 stages-selection of goal, planning, implementation and evaluation. According to these stages, experimental group's students carried out the project that developing solar tracking control system in solar generation. The results of this study are as follows; the project method was more effective than the traditional instruction in planning ability for task performance and implementation ability, subordinates of task performance ability. However, information gathering ability and evaluation ability on task performance, others in subordinates, it is not clear that the project method is more effective.

MANAGEMENT THINKING BEHIND PERFORMANCE MEASURES

  • Yong-Woo Kim ;Glenn Ballard
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.377-382
    • /
    • 2005
  • The tools, methods and measures used for project control reflect underlying theories of management. Management theory has been neglected in the construction industry, which has rather focused on tools and neglected theory. This paper contributes to the theory of project management by introducing and developing two fundamental and competing conceptualizations of management: MBM (Managing-by-Means) and MBR (Managing-by-results). Current project control and performance measurement practice is based on MBR. However, project control based on MBR may not be appropriate for managing dynamic projects. The paper present the Last PlannerTM System (LPS) and Process Variance Control (PVC) as examples of methods reflecting the MBM view. It is argued first that the MBM view is appropriate for managing uncertain, complex and quick projects. The paper also explores how MBR tools and techniques may be appropriately used within an MBM framework.

  • PDF

디자인 프로젝트 관리 시스템(DPMS)의 구성 (Construction for the Design Project Management System(DPMS))

  • 우흥룡
    • 디자인학연구
    • /
    • 제12권3호
    • /
    • pp.227-234
    • /
    • 1999
  • 본 논문은 디자인 프로젝트 관리의 리엔지니어링으로서 프로젝트의 기획, 조직, 일정, 그리고 제어하는 통합적인 어플리케이션 소프트웨어 개발의 기초모델을 설정하고, 이를 토대로 프로젝트 관리 시스템의 연구/개발을 목표로 삼고 있다. 프로젝트의 성과, 소요기간, 소요예산, 그리고 소요자원 등을 관리하는 과정이 프로젝트 매니지먼트 기술의 근간을 이루는 것으로, 디자인 프로젝트 상의 수많은 정보를 적시에 효율적으로 처리함으로써 프로젝트를 성공으로 이끌 수 있게 된다. 한편, 디자인프로젝트의 관리를 집단의사결정에 의해 처리함으로써 신뢰도와 합리성의 제고는 물론, 이를 통한 사기앙양이 기대된다. 따라서, 여기에서 야기되는 의사집합의 곤란, 시간손실, 구성원의 갈등 등의 프로젝트 관리에서 비롯되는 부수적인 문제도 전자의 기본적인 관리요소와 함께 통합하여 디자인 프로젝트 관리 시스템(DPMS)을 연구/개발하였다. DPMS 시스템은 디자인 프로젝트의 선정과 디자인 프로젝트의 기획/실행관리/ 평가로 주요 모듈을 설정함으로써 프로젝트 매니저는 해당 프로젝트 과업(Task)과 활동(Activity)에 대한 팀의 운용을 융통성 있게 관리할 수 있게 된다. 이와 더불어 프로젝트 관리를 On-Line DBMS 시스템 환경 상에 운용되도록 하여 정보의 재생산성, 운용의 동시성, 그리고 보안성 등을 도모하였다.

  • PDF

AUTOMATED PROJECT CONTROL SYSTEM FOR STEEL PROJECTS

  • Reza Azimi;SangHyun Lee;Simaan M. AbouRizk
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.479-486
    • /
    • 2009
  • This paper presents an integrated real-time monitoring and control framework that facilitates decision making by enabling project managers to take corrective actions right after any deviation happens and mitigate the damage to the ongoing steel projects. The proposed framework employs the High Level Architecture (HLA) as its infrastructure. It is composed of several individual monitoring and control components called "Federates," which cooperate and interact with each other through the Real-time Infrastructure (RTI). Reusability, interoperability and extendibility of federates in the proposed project control system make this a unique system.

  • PDF

도시철도용 무선통신기반 열차제어시스템 기능배치 연구 (A study of system functions allocation of wireless communications based train control system)

  • 윤용기;오세찬;김민수;김용규;최준영;박재영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2300-2305
    • /
    • 2011
  • A Train control system is intended to assure train operation safety and to improve train operation efficiency. To perform these missions, the Train Control System consists of train safety space control part, train route control part and train operation management part. Train control technology changed from track circuit based to wireless based. And Wireless based train control technologies were developed by some railway signaling companies in Korea. To commercialize these control technologies, the development project is carried now. This project did analyze system requirements, and made the system development specification. Now this project finished system functions allocation, which will be performed by some subsystem. This paper describes roles of each function and the allocation of these functions to each subsystem.

  • PDF

분당선 지능형열차제어시스템 (MBS) 시범설비구축 사업에 관한 고찰 (Study for trial project of Intelligent Train Control System (MBS) at Korail Bundang Line)

  • 김윤배;윤호석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.339-342
    • /
    • 2008
  • In this paper, the lessons and learns are introduced from the result of the trial project which is the first CBTC(Communication Based Train Control System) at Korail Bundang Line. This project has started end of 2002 and finished recently by Samsung SDS. The main purpose of this project was that new technology was seek for next generation of railway signal control system adapted in Korea. In 2002, there was no any revenue service system using Radio Frequency CBTC in the world at that time. Just a few trial project was on going in USA and EU. In well developed cities, the metro system have been built and old enough therefore they have to be considering re-signalling their existing system with advanced system for increasing availabilities of line usage and safety. This Bundang Line Trial Project was the first Korean CBTC project for above reasons. Most sub systems have been developed using local technology such as Electronics Controlled Interlocking System and Track Circuit Systems etc. Specially, in this project the RF-Communication devices are developed by local technology using DSSS(Direct Sequency Spread Spectrum) instead of FHSS(Frequency Hopping Spread Spectrum). This project has lasted for more than five years originally planned for three years because it was only accessible only night time in the main line from Ori to Suseo about 20km long. Each night only 2 and half hours are available to use the main line. Now the trial project has been done successfully with meet the customer's requirement, therefore the upgrade the mainline of Bundang line and another extension area up to Wangsipli to make revenue service using this new technology. This paper shows this result of the trial project and the strategy of upgrade and extension project as well.

  • PDF