PEFP CONTROL SYSTEM USING EPICS

  • Choi HyunMi;Hong In.Seok;Song YoungGi;Cho YongSub
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.656-658
    • /
    • 2005
  • KAERI (Korea Atomic Energy Research Institute) has been performing the project named PEFP (proton engineering frontier project). PEFP has been performing the project of a high power proton accelerator. Control system for 20 MeV proton accelerating structure has developed. We use the EPICS(Experimental Physics and Industrial Control System) tool kit as a foundation of the control system. EPICS is adopted for control systems which have OPI(OPerator Interface) and IOqlnput Output Controller). We have performed the PEPF control system on SUN workstation host computer. In this paper, we present the vacuum monitor, RFQ, and DTL Turbo pump control system.

  • PDF

Establishment of Document Control System for the Jordan Research and Training Reactor Project (요르단연구로건설사업 문서관리시스템 구축)

  • Park, Kook-Nam;Ko, Young-Cheol;Wu, Sang-Ik;Oh, Soo-Youl;Lee, Doo-Jeong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.4
    • /
    • pp.49-56
    • /
    • 2011
  • The Project of Jordan Research and Training Reactor (JRTR) officially launched in Aug. 2010. JRTR is the first made-in-Korea nuclear system to be built abroad by year 2015, and Korea Atomic Energy Research Institute (KAERI) is responsible for the design of major systems including the reactor core. While the PDCS (Project Document Control System) being operated by EPC company controls all the documents of the whole Project, KAERI is supposed to have its own system for KAERI documents. Meeting such a need; KAERI has implemented a document control for the JRTR Project into already existing ANSIM (KAERI Advanced Nuclear Safety Information Management) system. The documents of JRTR project to be controlled are defined in the PPM (Project Procedures Manual), QAP (Quality Assurance Procedure) and PEP (Project Execution Program). The ANSIM consists of the document management holder, document container holder and organization management holder. The document management holder, which is the most important part of ANSIM-JRTR, consists of the DDA (Document Distribution for Agreement), IOC (Inter-office Correspondence), PM Memo. (Project Manager Memorandum) and cover sheets of design documents. Other materials such as meeting minutes, sub-department materials and design information materials are stored in an independent COP (Community of Practice). This established computerized document control system, ANSIM, could lessen a burden for project management team and enhance the productivity as well.

Earned Value based Construction Project Control System (Earned Value 기반 프로젝트 관리체계 및 사례연구)

  • Lee Yoo-Seob;Cho Chang-Yon;Oh Kyu-Hoan;Kim Jung-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.123-130
    • /
    • 2002
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

  • PDF

Earned Value based Construction Project Control System (EV기반 공사관리시스템 기능의 비교분석 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.168-174
    • /
    • 2004
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

The Effect on Task Performance Ability of Project Method to Develop Solar Tracking Control System in Specialized High School (특성화고의 태양광 추적 제어 시스템 개발 프로젝트법이 학습자의 과제 수행 능력에 미치는 효과)

  • Han, Yu-Jin;Kim, Bang-Hee;Kim, Jinsoo
    • Journal of Engineering Education Research
    • /
    • v.17 no.1
    • /
    • pp.3-11
    • /
    • 2014
  • The purpose of this study was to verity the effect of project method on the task performance ability in development of a solar-tracking-control-system of specialized high school. In order to carry out this study, 2 classes of technical high school in Jeonbuk are chosen as experimental and control groups. The experimental group was taught by project method and the control group was taught by traditional instruction. Project method was designed by 4 stages-selection of goal, planning, implementation and evaluation. According to these stages, experimental group's students carried out the project that developing solar tracking control system in solar generation. The results of this study are as follows; the project method was more effective than the traditional instruction in planning ability for task performance and implementation ability, subordinates of task performance ability. However, information gathering ability and evaluation ability on task performance, others in subordinates, it is not clear that the project method is more effective.

MANAGEMENT THINKING BEHIND PERFORMANCE MEASURES

  • Yong-Woo Kim ;Glenn Ballard
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.377-382
    • /
    • 2005
  • The tools, methods and measures used for project control reflect underlying theories of management. Management theory has been neglected in the construction industry, which has rather focused on tools and neglected theory. This paper contributes to the theory of project management by introducing and developing two fundamental and competing conceptualizations of management: MBM (Managing-by-Means) and MBR (Managing-by-results). Current project control and performance measurement practice is based on MBR. However, project control based on MBR may not be appropriate for managing dynamic projects. The paper present the Last PlannerTM System (LPS) and Process Variance Control (PVC) as examples of methods reflecting the MBM view. It is argued first that the MBM view is appropriate for managing uncertain, complex and quick projects. The paper also explores how MBR tools and techniques may be appropriately used within an MBM framework.

  • PDF

Construction for the Design Project Management System(DPMS) (디자인 프로젝트 관리 시스템(DPMS)의 구성)

  • 우흥룡
    • Archives of design research
    • /
    • v.12 no.3
    • /
    • pp.227-234
    • /
    • 1999
  • We paid attention to the fact that a project will always tend to increase in size even if its scope is narrowing. The complexities and multidisciplinary aspects of projects require that the many parts should be put together so that the prime objectives- performance, time, and cost- are met. These aspects lead to the use of teams to solve problems that used to be solved by individuals. Firstly, We surveyed the design companies and their clients on the design projects, and categorized the design task into 5 phases, that are marketing, planning, idea development, presentation, and follow-up. Among the phases, the presentation has the most difficult task, longest processing time, and highest cost, whereas idea development phase has relatively low cost, longer processing time, and more difficult task. Most of the companies used to be faced several bottlenecks on their design projects - time control, budget control, and resource control. Secondly, for improving the project managing process, we adopted that dividing and analyzing the sub critical paths may help in the effective managing.(Badiru, Adedeji B., 1995) Some critical paths require almost as much attention as the critical path since they have a high potential of becoming critical when changes occur in the network. Therefrom we suggest the Total task weight(Gt) as a management formula for the design project management.${Gt=\mathrm{T}\ast\leftthreetimes\ast1/100}$<\TEX> ( Gt = Total task weight, mathrm{T} = Task Weight, \leftthreetimes= Criticality ) Thirdly, In order to support to managing for the design projects, we set up an application system, which is graphically planning and implementing a complex undertaking. It is helpful to make the control of a project easy. The DPMS(Design Project Management System), which has two sub system. One is Project Screening System(PSS), and another Project Managing System(PMS). In PMS, we divided the design project into three modules; Project Planning, Project Implementation, and Project Evaluation. As a result, the DPMS will contribute to supply the control of a project easily and effectively. Also teams are used for making decisions and taking action with the DPMS. But we need to get further studies on the relationships between the whole project and its tasks.

  • PDF

AUTOMATED PROJECT CONTROL SYSTEM FOR STEEL PROJECTS

  • Reza Azimi;SangHyun Lee;Simaan M. AbouRizk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.479-486
    • /
    • 2009
  • This paper presents an integrated real-time monitoring and control framework that facilitates decision making by enabling project managers to take corrective actions right after any deviation happens and mitigate the damage to the ongoing steel projects. The proposed framework employs the High Level Architecture (HLA) as its infrastructure. It is composed of several individual monitoring and control components called "Federates," which cooperate and interact with each other through the Real-time Infrastructure (RTI). Reusability, interoperability and extendibility of federates in the proposed project control system make this a unique system.

  • PDF

A study of system functions allocation of wireless communications based train control system (도시철도용 무선통신기반 열차제어시스템 기능배치 연구)

  • Yoon, Yong-Ki;Oh, Seh-Chan;Kim, Min-Su;Kim, Yong-Kyu;Choi, June-Young;Park, Jae-Young
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2300-2305
    • /
    • 2011
  • A Train control system is intended to assure train operation safety and to improve train operation efficiency. To perform these missions, the Train Control System consists of train safety space control part, train route control part and train operation management part. Train control technology changed from track circuit based to wireless based. And Wireless based train control technologies were developed by some railway signaling companies in Korea. To commercialize these control technologies, the development project is carried now. This project did analyze system requirements, and made the system development specification. Now this project finished system functions allocation, which will be performed by some subsystem. This paper describes roles of each function and the allocation of these functions to each subsystem.

  • PDF

Study for trial project of Intelligent Train Control System (MBS) at Korail Bundang Line (분당선 지능형열차제어시스템 (MBS) 시범설비구축 사업에 관한 고찰)

  • Kim, Yun-Bae;Yoon, Ho-Sok
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.339-342
    • /
    • 2008
  • In this paper, the lessons and learns are introduced from the result of the trial project which is the first CBTC(Communication Based Train Control System) at Korail Bundang Line. This project has started end of 2002 and finished recently by Samsung SDS. The main purpose of this project was that new technology was seek for next generation of railway signal control system adapted in Korea. In 2002, there was no any revenue service system using Radio Frequency CBTC in the world at that time. Just a few trial project was on going in USA and EU. In well developed cities, the metro system have been built and old enough therefore they have to be considering re-signalling their existing system with advanced system for increasing availabilities of line usage and safety. This Bundang Line Trial Project was the first Korean CBTC project for above reasons. Most sub systems have been developed using local technology such as Electronics Controlled Interlocking System and Track Circuit Systems etc. Specially, in this project the RF-Communication devices are developed by local technology using DSSS(Direct Sequency Spread Spectrum) instead of FHSS(Frequency Hopping Spread Spectrum). This project has lasted for more than five years originally planned for three years because it was only accessible only night time in the main line from Ori to Suseo about 20km long. Each night only 2 and half hours are available to use the main line. Now the trial project has been done successfully with meet the customer's requirement, therefore the upgrade the mainline of Bundang line and another extension area up to Wangsipli to make revenue service using this new technology. This paper shows this result of the trial project and the strategy of upgrade and extension project as well.

  • PDF