• Title/Summary/Keyword: Project Base System

Search Result 248, Processing Time 0.026 seconds

INDICATOR FOR PERFORMANCE MANAGEMENT OF CONSTRUCTION CALS

  • In-Su Jung;Jin-Uk Kim;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1340-1345
    • /
    • 2009
  • Ministry of Land, Transportation and Maritime Affairs has implemented Construction CALS project for improving informationization level of construction industry and for making construction production system efficient. Although an importance of evaluation on level and performance of construction informationziation projects has been emerged, Construction CALS hasn't been evaluated so far. In this study, the performance indicators of construction CALS as the most important base in creating a performance management system were deduced. For this aim, this study reviewed the former researches on system construction for managing performance, analyzed current status of Construction CALS, arranged the relationship between upper strategies and ISP, developed pools of performance indicators, and this study followed IT BSC methodology. As a result, this study developed performance indicators of Construction CALS through four strategies such as globalization and activation of Construction CALS standards, research & development for reaching to international level in construction informationization technology, stabilization of system operation and distribution by publicizing Construction CALS and improving its functions, and policy implementation for managing and coordinating Construction CALS projects. These indicators will be applied to build a system of performance management.

  • PDF

A Study on the Scale Effort Estimation Model based on Industry Characteristics (산업별 특성에 따른 소요공수 규모 산정 모델 연구)

  • Kwoak, Song-Hae;Park, Koo-Rack;Kim, Dong-Hyun
    • Journal of Digital Convergence
    • /
    • v.14 no.11
    • /
    • pp.233-240
    • /
    • 2016
  • Information system development projects, have a mechanism for many of the costs generated by a variety of risk factors. In general, the probability that the software project of the information system is carried out successfully in the delivery time is very low. This prediction of a formal cost is needed as the most important factor since it can prevent the project from being failed. However, objectivity of most of the project scale calculation during the calculation criteria is insufficient. Further, it is the actual situation that the management of the base line is not properly made during the project. Therefore, in this paper, we propose a model to calculate the number of steps it takes to develop on the basis of a methodology in an attempt to overcome the limitation of being unpractical in the early stage of the information system development project. It is expected to be a tool to estimate the effort and cost required by the information system development business through these convergence proposals model.

A Case Study of Remediation Grouting for Stopping Leakage of Concrete Dam Base (콘크리트 댐 기초 누수방지 보수그라우팅 사례)

  • 천병식;김진춘;최영철
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.449-456
    • /
    • 2000
  • Remediation grouting has been widely used for the rehabilitation of various civil works like hydraulic and traffic structures. Recently there were some cases of remediation grouting for repairing old dams in korea. So this study will describe the case of remediation grouting of the concrete dam base located east-northern part of Seoul. We use Lugeon Test and Borehole Image Processing System(BIPS) for estimating the effectiveness of remediation grouting of this project. As the results of this study, we could find the lots of joints between the old concrete body and the weathered rock base. So the about 30% quantity of total cement grouts was injected at the boundary surface between concrete and rock base. And Lugeon Test and BIPS could be compared relatively because BIPS results could be presented quantitatively as well as qualitative analysis. Finally, we could find microfine cement was very effectively injected to the fine fissured concrete body compared with ordinary portland cement, but there was little injectability differences beteween microfine cement and ordinary portland cement at the large cracks or cavities were developed rock base.

  • PDF

THE ROLE OF USING A TABLET COMPUTER FOR MOBILE COMMUNICATION ON CONSTRUCTION SITES

  • Ruvinde R. Kooragamage;John M. Kelsey;Simon Julier
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.531-538
    • /
    • 2013
  • The coordination and control of construction projects is vital if a project is to be a success. Almost all analysis has shown that these can only be achieved if good quality communication can be maintained on a construction site. This research focuses on the role that tablet computers could play in enhancing this communication. The following points are investigated in this paper: (a) Whether a tablet computer can enable users to monitor project progress more efficiently than traditional methods, (b) How the tablet computer fits within the project management iron triangle in construction, (c) The two different psychological impacts of information transmission for the end user using a tablet computer (i) The expectancy to transmit information frequently and rapidly from tablet computer users to project members whilst working onsite (ii) The mode of information transmission to the cognition of the transmitted information to the tablet computer. Through the use of structured interviews and questionnaires, the opinions of individuals within various disciplines in construction were canvassed. The approach adopted in this paper deals with understanding both the soft and hard issues for deploying such a system. This research enabled the authors to develop a base framework incorporating the key factors which are relevant for implementing a tablet computer based on information flows primarily.

  • PDF

A Case Study for the Resolution of Cadastral Inconsistency

  • Kam Lae, Kim;Won Jun, Choi;Gun Hyuk, Lim
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.11a
    • /
    • pp.557-563
    • /
    • 2004
  • Korean cadastral system keeps graphical maps made by the plane table method from 1910's. The fact is that the graphical maps grafted on paper cover about 95% of the whole land (MOGAHA, 1999). The needs are arising to transform the graphical cadastre to a digital one in compliance with modem technologies. Korean government has already digitise the old maps until last year. A nation-wide land information system, Parcel-based Land Information System, was established upon the digitised map database. However, the accuracy of the digitised coordinates hardly meet the citizens' needs because it cannot exceed that of the paper maps. The definite solution will be surveying all the parcels again and making new digital maps. However, commencing a project for resurveying 34 million parcels will require enormous amount of time and manpower. The strategy should be dividing the country into county-wise or grid-wise pieces and surveying one piece by one piece. Municipal governments of counties, cities or urban districts will be the propelling bodies of the project but the costs will hardly be affordable at a time. For the purpose of resolving the financial problem, each municipality can split its own project into smaller pieces by year base. There is accordingly a great possibility to create inconsistency over the divided project areas caused by different techniques applied, different equipments used and/or mismatches between the project borders. It provides some merits at the same time. The people in project completion areas will be satisfied with the enhanced accuracy and feel safe in land transaction and, in turn, soundly improves overall nation-wide economic situation. Therefore, the main issue of the thesis shows how to make the cadastral re-survey project scalable. Guidelines for how to perform the projects will be derived from a experienced case.

  • PDF

The Effect of Knowledge Complementarity and PMO Implementation System on Performance of IT Project (지식 상호보완성과 PMO수행체계가 IT 프로젝트 성과에 미치는 영향)

  • Kim, Choong-Nyoung;Jang, Ji-Yeon;Choi, Kyu-Jin
    • Management & Information Systems Review
    • /
    • v.37 no.4
    • /
    • pp.141-156
    • /
    • 2018
  • PMO(Project Management Office) has been considered as a general approach for the successful operation of IT project. The previous studies tended to emphasize on the roles and functions of PMO in a normative way. However, in practice, since PMO is operated as a joint structure in which client firms and professional PMOs work together, it seems to be important that the implementation system of PMO should be properly formed. In this paper, it is examined whether the competence of client firms and professional PMO influence on the setup of implementation system of PMO, and also whether implementation system of PMO influence of the performance of IT project. In addition, it is also analyzed if the competence of client firms and professional PMO influence differently on the setup of implementation system of PMO, according to the degree of knowledge complementarity. As a result of this study, it is found that the competence of client firms and professional PMO influence positively on the setup of implementation system of PMO, and governance factors such as clear definition of organizational roles, responsibility, and setup of standardized processes are also important in performance of IT project. It is also shown that, if knowledge complementarity is formed with a common knowledge base between client firms and professional PMOs, Project Management Office functions effectively. In summary, for the successful performance of IT project, it seems that it is required to approach from the view point of governance in forming the implementation system of PMO and it is also important to form knowledge complementarity between client firms and professional PMOs.

Study on the Improvement of Proposal Works for PPP Project: Focused on Operation and Maintenance Cost (민간투자사업의 제안서 작성 업무 개선에 관한 연구 - 운영관리비 산정 업무를 중심으로 -)

  • Koo, Ja Kyung;Lee, Dong Wook;Shim, Myung Seob;Lee, Tai Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.655-662
    • /
    • 2010
  • As the national competitive power indicator, the infrastructures have been constructed with government's SOC budgets. However, even SOC budget is decreased, Public-Private Partnership Project (PPP project) has been introduced to solve demands on extending infrastructures, and among PPP projects, road projects take high portions. This study analyzes the operation & management item of financial model which is connected to the O&M cost and project proposal of previously proposed road project and analyzes the Korea Expressway Co.,'s project cost items and O&M tasks to reflect the characteristics of road projects. Based on results, this study suggests necessity of the O&M cost breakdown structure and the cost calculation standard on each cost item. Also, for the existing task execution tools, O&M cost calculation tool and finance analysis task tool will be integrated, and the system is suggested web-based system. Thus, it is expected that it contributes to the securing overall business values on PPP project and expending profit-base infrastructures.

Structural Equation Model for Information Technologization Success Index(ITSI) of Small and Medium Enterprise (구조방정식 모델을 이용한 중소기업의 IT화 성공지수(ITSI) 개발 연구)

  • Kim, Jung-Geon;Moon, Tae-Hee;Sohn, So-Young
    • IE interfaces
    • /
    • v.17 no.3
    • /
    • pp.338-348
    • /
    • 2004
  • OECD countries including Korea positively adopt performance-based budget systems which convert an input-centered system to an output-centered system to solve two baffling problems: public expense retrenchment and efficiency recovery of government management. Output management of IT project propelled in public sector becomes a prominent figure influenced by these keynote of policy. However, it is placed in difficult circumstances to develop a performance index and the methodology to cover characteristics of IT project, measuring the goal achievement of business and the customer contentment according to the phases of business progress. Existing studies of IT project accomplishment measurement have been fulfilled on the subject of business targeting on IT technology application, administrative information network business and national base of information network construction. Most of the studies have been executed using BSC or AHP to reflect synthetically business specifics of IT project from a methodological point of view. In this study, we propose a structural equation model (SEM) to develop a performance index which measures the outcome of IT project according to the phases of business progress, avoiding a simple presentation of project outcome or conceptual frame. The proposed SEM is applied to the survey results of "IT support project for Small and medium business". Based on the fitted model, we apply ACSI concept to develop an Information Technologization Success Index (ITSI). This index allows us comparison of several IT vendors as well as feedback information for further improvement.

An Analysis of the Effects of Knowledge Complementarities on the Performance of Information System Audit : A Perspective of the Resident Audit in the Project Office (지식상호보완성이 정보시스템 감리 성과에 미치는 영향 : 상주감리 관점에서)

  • Jang, Ji Yeon;Kim, Choong Nyoung
    • Journal of Information Technology Services
    • /
    • v.15 no.1
    • /
    • pp.113-129
    • /
    • 2016
  • Recently, as Information System projects tend to be more complex, the importance of Information System Audit increases. In the same context, the need for the resident IS Audit also increases, which is supposed to deal with the possible risks and urgent issues by providing the appropriate support and timely coordination during IS project. Basically, for the effective IS Audit, the IS audit team members should be able to understand such a business context as work characteristics, business knowledge, goals, and culture of the organization. The audit team members should also be able to share the various knowledge of Information Technology and audit procedure with the owner of the project. Especially, for the resident audit, it is more important to fill the gaps in expertise between project owner and audit team. However, any studies on the need of common knowledge base (knowledge complementarities) in the IS audit have not been done so far. The purpose of this study is to analyze whether the knowledge complementarity based on inter-organizational communication between the project owner and audit team members makes an effect on the fidelity and performance of IS audit. In order to do this, the relationship among inter-organizational communication and knowledge complementarity, the fidelity of IS audit service, and performance of IS audit has been analyzed, using Structural Equation Model. The result shows that all the relationship is significant, which means that knowledge complementarity between the two different interest groups should be an effective factor on the fidelity and performance of IS audit. This result implies that, for better quality of IS Audit service, how to acquire the knowledge complementarity between the project owner and Audit team should be considered seriously as well as systematically in the process of IS Audit.

USING QUANTITY ESTIMATE STATISTICAL MODELS FOR INFRASTRUCTURE LONG RANGE COST MANAGEMENT

  • Jui-Sheng Chou;Min Peng;James T. O'Connor;Khali R. Persad
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.808-813
    • /
    • 2005
  • Effective cost management requires reliable cost estimates at every stage of project development. The primary purpose of this research is to develop systematic modeling procedures and an automatic computing program for infrastructure estimating in the Texas Department of Transportation (TxDOT). The computing system toggles between project input information and segregated district unit prices for highway work item quantity estimates associated with earthwork and landscape, subgrade treatments and base, surface courses and pavement, structures, miscellaneous construction, and lighting, signing, markings and signals. This quantity-based approach was chosen because of the conventional approach lacking of quantity information until primary design is complete.

  • PDF