• Title/Summary/Keyword: Project Base System

Search Result 248, Processing Time 0.027 seconds

A Development of a Web Based Supporting System for Writing Construction Project Specification (Web기반 공사시방서 작성 시스템 개발 방안)

  • Kim Kyoon-Tai;Kim Tae-Song;Koo Jai-Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.501-506
    • /
    • 2001
  • The Korean government established a domestic specification system, and regulated that owner should produced construction project specifications, instead of special provisions, in design phase, January 1998. But in Korea the ability of construction engineers for construction project specification are insufficient. So the government had built up a database of standard specifications and developed a supporting system for writing construction project specification(SPECMAKE) in 1999. However, it is a PC base stand-alone system, so it is not convenient to update the database. In order to overcome these limitations, the purpose of this paper builds up a database of construction criteria and develops a automatic writing system for construction project specification on web base. The database contains standard specifications, design and construction guidelines related with construction business. And this paper describes the frameworks, the components, and the functions of the specifications writing system for the construction projects.

  • PDF

The Development of Project-Based instructional Model for Promoting the creative convergent Competency (창의융합역량향상을 위한 프로젝트 수업 모형개발)

  • Kim, Youngmi
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.20 no.11
    • /
    • pp.2172-2180
    • /
    • 2016
  • As increasing the emphasis of competence-based learning, Project-base instruction is adopted more with frequency at the educational field. This study focuses on developing the methodology of project-based instructional system. The first one is to manage the project independently not to link with any module. The second one is to link a project to a module. And the third one is to link a project to the more than two major modules. Also It suggests the tool for project based instruction. Before & after class conducting the inspection for increasing satisfaction of instruction by the systematic management and improvement, the project base instruction shows the positive effect to promote the creative personality and problem solving ability. The contentment of the class increases 7% more at the 2nd year than the 1st. As a result, it can derive the evaluation of the pupils' higher achievement rate.

A study on the Development of Systems Engineering Application Model for LRT based on MBSE (전산도구 기반의 경량전철사업 시스템엔지니어링 적용모델 SELRT 개발)

  • Han, Seok Youn;Kim, Joo Uk;Choi, Yo Cheol
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.1
    • /
    • pp.9-19
    • /
    • 2012
  • The Light Rail Transit Project is a large scaled project which takes several years in building a system. After construction, LRT system is operating for several tens of years. For these characteristics, the right application of systems engineering to LRT project greatly effects the project success. In this paper, we present systems engineering application model to LRT project i.e. SELRT which include systems engineering technical process, core technology management process, project support process. SELRT also has a module for the exchange of outputs in SE tool and PM tool. Systems engineering processes in SELRT mainly base on ISO/IEC 15288. In future, we expand the range of SE processes and improve the usability in SELRT. We expect that this model will contribute to improve the efficiency in LRT project and to success the LRT project.

A study of the integration of the 2D ground water model WHPA with Desktop GIS for ground water well development by basic survey stage (지하수 관정개발 기초조사사업 업무지원을 위한 Desktop GIS와 2D 지하수 모델 WHPA 통합 연구)

  • Kim, Man-Kyu;Jung, Byong-Ho;Lim, Chang-Young;Park, Jong-Cheol
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2002.10a
    • /
    • pp.257-260
    • /
    • 2002
  • This study develops a GIS-based system which examines the adequacy of the Groundwater development project before the actual designing of the project. Using the system developed here, we can transfer simulation results obtained by WHPA regarding Groundwater levels in new development projects into GIS. We can also judge whether a Groundwater development project should be permitted through examining overlaps of the effects of the development and comparing with other pollutants. Since a two-tiered system which shares DB using inter- and intranets is developed, all the departments in the ministry of agriculture and forest and the agriculture base corporation can share accurate, reliable and latest information related to Groundwater.

  • PDF

The Rolling Stock operation reliability improvement plan which applies a data base of the RIMS (RIMS 데이타를 활용한 전동차 운행 신뢰성 향상방안)

  • Park, Soo-Choong;Lee, Do-Sun;Jeon, Seo-Tak;Son, Young-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.57-64
    • /
    • 2007
  • RIMS(Rolling Stock Information Maintenance System) was installed in structure which it can analyze the data base in need of credibility maintenance. So it could accumulate real data without repulsion of working spot. Information system was installed not following to system but following to working spot. The development of RIMS project was started from March 29, 2001 and it has been operating from October 12, 2004 in Chang-dong Car depot for light maintenance in charge subway line4. So substantial data base was accumulated for three years. This study calculated all RAMS data by analyzing data base accumulated in RIMS and used in dada base about credibility maintenance and found investigation of propriety, expectation of the life cycle cost, the improvement plan on credibility of sorts of cars and formation about the cycle of repairing and maintenance. This got MKBSF MKBF and MTBF about devices and sorts of line4 Rolling Stocks for it.

  • PDF

The Rolling Stock operation reliability improvement plan which applies a data base of the RIMS (RIMS 데이타를 활용한 전동차 운행 신뢰성 향상방안)

  • Park, Soo-Choong;Lee, Do-Sun;Jeon, Seo-Tak;Son, Young-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.143-150
    • /
    • 2007
  • RIMS(Rolling Stock Information Maintenance System) was installed in structure which it can analyze the data base in need of credibility maintenance. So it could accumulate real data without repulsion of working spot. Information system was installed not following to system but following to working spot. The development of RIMS project was started from March 29, 2001 and it has been operating from October 12, 2004 in Chang-dong Car depot for light maintenance in charge subway line4. So substantial data base was accumulated for three years. This study calculated all RAMS data by analyzing data base accumulated in RIMS and used in dada base about credibility maintenance and found investigation of propriety, expectation of the life cycle cost, the improvement plan on credibility of sorts of cars and formation about the cycle of repairing and maintenance. This got MKBSF MKBF and MTBF about devices and sorts of line4 Rolling Stocks for it.

  • PDF

Prediction/Investment Cost Analysis for korea High-Speed Railway System (한국형 고속전철 시스템의 추정/투입비용 분석)

  • Lee, Tae-Hyeong;Park, Chun-Su
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.60-64
    • /
    • 2003
  • In this study, we have analyzed the cost of korea high-speed railway system. The predicted cost in planning phase and adjustment data to 5th year are collected. Then, predicted cost is compared with adjustment in year/item/system base. We make a project history table for criteria to review project history and research & development activity. We have developed CBS(cost breakdown structure) and allocated adjustment data to them. It is shown that cost prediction related to research & development activity in planning phase is relatively correct.

  • PDF

Improved Link System of Schedule and 3D Object for VR-base Construction Project (가상건설기반의 건설공사 일정 및 3D객체 연동시스템의 개선된 구축방안)

  • Kwon, Jung-Hui;Moon, Hyoun-Seok;Park, Seo-Young;Gi, Sang-Bok;Kang, Leen-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.289-294
    • /
    • 2007
  • Virtual reality (VR) technology for construction project includes 3D CAD application and 4D CAD system for visualizing construction schedule data. 3D CAD application is more important in the design phase and 4D CAD system is effective tool in the construction phase. This study suggests a methodology to develop VR functions that can be used for project life cycle. The results of this study includes composition algorithms to make VR systems such as bird's eye view system, VR drawings system, VR telepresence system and VR risk management system. Those methodologies can be used for integrated VR system with nD CAD object.

  • PDF

A Study on the Application of Defense IoT for the Implementation of Common Service in the Army, Navy, and Air Force (전군 공통 서비스 구현을 위한 국방 IoT 적용방향 연구)

  • Bae, Young-Min
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.3
    • /
    • pp.31-39
    • /
    • 2022
  • The Army, Navy, and Air Force are currently making various efforts to apply defense IoT technology by reflecting the characteristics of each military. However, there are concerns that comprehensive collection, management, and analysis may be limited because each military has no overlapping system or guaranteed interoperability of data, and there are inefficient aspects in terms of using and investing a limited defense budget. In this study, evaluation items and priorities for pilot projects were selected by applying Delphi technique and AHP method to determine which projects are preferentially effective when commonly applied in terms of Army, Navy, and Air force. As a result of the analysis, the project basis and driving force, project feasibility, performance and ripple effect, redundancy and connection were identified in the order of IoT-based small detachment units and unmanned base construction, intelligent smart unit, smart ground ammunition depot, and smart training management system. According to the comprehensive results reflecting the weights of each evaluation item, the fact that small detachment units and unmanned base construction project are recognized as the first project to be applied to the Army, Navy, and Air Force is a valid approach to be effective while each military is burdened with personnel management because of the reduction of manpower. Through the research results, it is expected that the direction of application to the policy of the defense IoT project can be confirmed in terms of efficient use of limited budgets.

Spatial database architecture for organizing a unified information space for manned and unmanned aviation

  • Maksim Kalyagin;Yuri Bukharev
    • Advances in aircraft and spacecraft science
    • /
    • v.10 no.6
    • /
    • pp.545-554
    • /
    • 2023
  • The widespread introduction of unmanned aircrafts has led to the understanding of the need to organize a common information space for manned and unmanned aircrafts, which is reflected in the Russian Unmanned aircraft system Traffic Management (RUTM) project. The present article deals with the issues of spatial information database (DB) organization, which is the core of RUTM and provides storage of various data types (spatial, aeronautical, topographical, meteorological, vector, etc.) required for flight safety management. Based on the analysis of functional capabilities and types of work which it needs to ensure, the architecture of spatial information DB, including the base of source information, base of display settings, base of vector objects, base of tile packages and also a number of special software packages was proposed. The issues of organization of these DB, types and formats of data and ways of their display are considered in detail. Based on the analysis it was concluded that the optimal construction of the spatial DB for RUTM system requires a combination of different model variants and ways of organizing data structures.