• Title/Summary/Keyword: Project Base System

Search Result 248, Processing Time 0.028 seconds

LMT Diagnosis Assistance System for Art Therapy (미술 치료를 위한 LMT 그림 진단 지원 시스템)

  • So, Hyeongyeong;Seo, Younghoon
    • Journal of Platform Technology
    • /
    • v.6 no.1
    • /
    • pp.24-30
    • /
    • 2018
  • LMT consisting of 10 landscape elements is one of psychology diagnosis method for inspecting the psychological state of client. In this paper, we make knowledge base accumulating knowledge about LMT landscape elements. By using this knowledge base, we also propose and implement LMT diagnosis assistance system generating LMT inspection report being a result of diagnosis. This proposed system generates diagnosis report based on LMT knowledge base which accumulate knowledge from plenty of reference and research project, that's why we improve the objectivity of diagnosis results. And new knowledge about LMT can be accumulated in knowledge base, so the system proposed in this paper can be extensible continuously. The implementation of system proposed in this paper offers web-based services. To show effectiveness of the system, we diagnose the actual case by using the system, and show the diagnosis result.

Analysis of alternative project for demonstration route construction of Urban Transit Magnetic Levitation System (도시형 자기부상철도 시범노선건설 대안설계의 분석)

  • Kim, Byoung-Seop;Lee, In-Yong;Kim, Si-Gon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.11a
    • /
    • pp.581-591
    • /
    • 2010
  • Korea Rail Network Authority ordered Urban Transit Magrev System on the alternative tender lines. The project was contained order with GS Construction and Yooshin Corporation as a result of competition as 5 consortium. Urban Transit Magrev System route was constructed in the whole Yeongjong-dong and Yongyu-dong, Jung-gu, Inchen. The main project is via transportation center in Inchen Int'l airport ~ Work complex ~ Water park ~ Yongyu-station and has Total continuation of 6.1kilometers, Station of 6 spot, Car base of a spot, go out line(a single line) of 380meters. Scale of construction is Major of Roadbed, Railroad, Building, Inspection and Repair facilities. The first Urban Transit Magrev System in Korea is a new symbol of Korea and has polished beauty and creative artistry based on functional perfection. It was designed in harmony with Inchen Int'l Airport improving the dignity of SOC design.

  • PDF

DATA WAREHOUSE PROTOTYPE SYSTEM TO SUPPORT THE MASTER PLAN OF URBAN REGENERATION PROJECT

  • Dong-Hyun Cho;Sang-Geum Lee;Hyung-Jin Park;Kyo-Jin Koo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.361-368
    • /
    • 2009
  • In the Urban Regeneration Project, the scale becomes huge and the composition of participating organizations is complex. It is necessary to establish the master plan fast and effectively harmonize conflict options and interests in the early stage of the project. However, the master planner, who is tasked to establish the master plan, and the master planning team, are difficult to establish the master plan fast while effectively considering various and complex information related to regeneration. The Urban Regeneration Project is composed of various types of computer files like HWP, EXL, PDF, DWG and others. When the master plan is established, it is necessary to link the information items and physical files of urban generation in order to effectively save the files in storage for easy search and utilization. This study developed a prototype system to support participating subjects of the Urban Regeneration Projects. It will effectively utilize the information items in the physical computer files using information blocks and Metadata. The developed system provides the base to effectively manage large amount of documents in the early stage of the Urban Regeneration Project and make effective decision-making using the concept of data warehouse.

  • PDF

Landuse Information System Construction and Landuse Pattern (토지이용정보체계구축 및 토지이용유형화에 관한 연구)

  • 이근상;임승현;조기성
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.17 no.1
    • /
    • pp.1-10
    • /
    • 1999
  • Landuse information is base data being applied as common database in the process of executing urban project service and is very available. But, the progress of business on landuse information building is deficient yet. In this study, we'd like to deal with landuse information projet that is the base of urban project, many landuse information building and the method of extraction of efficient second-information. Also, we built system to apply actively landuse information for urban projectors. And, we'd like to present the model on urban landuse classification system that wouldn't be standard yet by studying the method of urban landuse pattern using landuse in-formation being built. Also, we can evaluate if the model of urban landuse pattern comes up to present landuse. We can expect it is a base data by extracting unsuitable area from present landuse efficiently when we construct landuse project.

  • PDF

A Comparative Study on the Local Governments' Environmental Impact Assessment Regulations in Korea (지방자치단체 환경영향평가 조례 비교 연구)

  • Sung, Hyun-Chan;Min, Soo-Hyun
    • Journal of Environmental Impact Assessment
    • /
    • v.12 no.3
    • /
    • pp.137-150
    • /
    • 2003
  • This study aims to survey whether local governments have legislated laws and regulations on environment impact assessment system, to compare and analyze specific projects and their scale, assessment items, and procedures & discussion process, to identify issues and generate improvement plans, and to suggest a direction for future legislation to local governments that plan to legislate laws and regulations in the future. Major outcome of the study are as follows. First, terminologies used for environment impact assessment by local governments need to be unified. Also, laws and regulations need to be legislated soon. Second, in "urban development project" areas, a total of nine project areas including "quarrying of soil and stone, sand, gravel, and minerals" was essential common projects. A total of six project types were added or newly established compared to national systems. Among them, four project types were added within national-level project areas and two project types were not available under the national-level project areas and newly added due to the nature of local governments. Third, in terms of project scale, scale enhancement of "urban development project" was most common. Analysis showed that in case of clean natural environment such as Cheju Island, it is necessary to consider reinforcing project areas where development activities take place directly in forests or rivers such as "industrial base and complex development", "water resource development", and "development of tourism complex." Fourth, the discussion and review procedures of assessment reports were similar to those at government level. However, in case of Seoul city, it is required to write a "preparation plan" before drafting an assessment report. The city features partial introduction of scoping and screening, which allows to exempt discussion procedures if impact on environment is found to be minimal after drafting the assessment report. In case of national-level, it has a dual system that is split between Ministry of Construction and Transportation and Ministry of Environment. However, in case of environment impact assessment of local governments, it is a single system where city mayors and provincial governors are in charge of both project execution and environmental assessment. Therefore, the most important task is how to satisfy objectiveness and accountability.

The Support System for Groundwater Development Design using GIS (GIS를 이용한 지하수개발 설계지원 시스템)

  • 김만규
    • Spatial Information Research
    • /
    • v.9 no.2
    • /
    • pp.207-225
    • /
    • 2001
  • This study develops a GIS-based system which examines the adequacy of the Groundwater development project before the actual designing of the project. A system environment is constructed in order to efficiently and scientifically manage and analyze data related to Groundwater through a Server/Client environment. For this programs such as GIS S/W ArcVies3.2, RDBMS ORACLE, ArcSDE (Spatial Database Engine) are used. WHPA and AQTESOLV are employed as a underground water simulation program and Scripts, a language for ArcView, is used to develop graphic user interface (GUI). Using the system developed here, we can transfer simulation results obtained by WHPA regarding Groundwater levels in new development projects into GIS. We can also judge whether a Groundwater development project should be permitted through examining overlaps of th effects of the development and comparing with o pollutants. At the same time, the system has a feature of supporting Groundwater development and based designing through judging the proper amount of Groundwater in a new project. It is also possible to easily and quickly prepare charts and reports using the outputs of the system. Since a two-tiered system which shares DB using inter-and intranets is developed, all the departments in the ministry of agriculture and forest and the agriculture base corporation can share accurate, reliable and latest information related to Groundwater.

  • PDF

정부출연연구기관에서의 자금조달환경의 불확실성이 관리통제시스템에 미치는 영향 - PBS 제도 도입을 중심으로 -

  • 이민형
    • Journal of Technology Innovation
    • /
    • v.11 no.1
    • /
    • pp.177-193
    • /
    • 2003
  • This paper examines empirically if the increase of funding uncertainty in government supported R&D institutes(GSRIs) in Korean cause managers to use more effective management control practices. Recently government introduced a new government R&D budget management system, based on competition, named PBS(Project Base System). Government requires GSRIs to be self-supporting and compete for funding from government. The introduction of new budget management system named PBS, has resulted in the increase of funding uncertainty in GSRIs. According to institutional theory, government organizations gain legitimacy by conforming to external expectations regarding management control practices, In contrast, contingency theory proposes that management control practices are driven by the fit between the technical features of the environment and the management control practices. The contingency literature provides that one external factor expected to motivate government managers to use more efficient control practices is the presence of competition and funding uncertainty. This paper use both theoretical perspective to develop hypotheses and examine the influence of funding environment on management control practices. Results show that the more institutionalized environment, the more managers in GSRIs rely on bureaucratic mode of control for conforming to external requirements, and the greater the funding uncertainty, the more managers use results and personal modes of control to improve research team performance.

  • PDF

The Characteristic of Wind Turbine Industry of the West-South Seashore of Leading Industry Development for Honam Economic Region (호남광역경제권의 서남해안 풍력산업 특성)

  • Cha, In-Su;Kim, Tae-Hyung;Lee, Ki-Bong
    • Proceedings of the KIPE Conference
    • /
    • 2010.07a
    • /
    • pp.101-102
    • /
    • 2010
  • This paper represents about the characteristics of wind turbine industry of the west-south seashore of Leading Industry Development for Honam Economic Region. These projects have 8 R&D and 3 non R&D project. The period of these projects is from October 2009 to April 2012. The R&D projects are composed three bright prospect products (1) the base construction of MW off-shore wind turbine components and system with Outer-rotor type PMSG, (2) the Development of 3MW wind power system with accommodation of the west-south seashore, and (3) the development of hybrid wind turbine system with wind base construction. Also, the non-R&D projects are composed three parts with above three bright prospect products. Above two projects support the companies with characteristic of low speed wind turbine system. Other project supports the companies related to wind turbine with small and medium capacity of form 3 kW to 10kW.

  • PDF

Nosan.Hasuk Rural Village Development Project Base on Amenity (어메니티를 기반으로 한 노산하석권역 농촌마을 개발계획)

  • Yoon, Seong-Soo;Kim, Ji-Hyun;Rhee, Shin-Ho;Seo, Kyo;Kim, Han-Joong
    • Journal of Korean Society of Rural Planning
    • /
    • v.12 no.4 s.33
    • /
    • pp.43-51
    • /
    • 2006
  • The purpose of this study is to make a planning of Nosan Hasuk rural village development project based on rural amenity. The Nosan Hasuk rural village is located in Hyundo-Myun Cheongwon-Gun Chungcheongbuk-Do. For this study, investigate the amenity, make the bill of developing plan, and discuss the problems in rural integrated developing project. The developing plan is composed of basic planning, developing direction, village plans, and details projects. And, indicate the problems of rural integrated developing project those are the main body, standardization of investigated data, and insufficiency of detailed reference.

Existing Building Approval Submission Process Improvement Effect Analysis thru Utilization of BIM

  • Yeo, Chang-Jae;Yu, Jung-ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.664-664
    • /
    • 2015
  • Advanced countries have mandated applying BIM in construction projects. Also, Public Procurement Service has planned to mandate applying BIM to all construction project that ordered in PPS from 2016 in KOREA. However, now Seumter that is building administration system is not supported BIM based construction license BIM information from Seumter. Thus, despite the applicant is preparing a BIM model, they do not take advantage of BIM information in Seumter. In previous studies. We developed a BIM based building approval submission system. In this study, we verified the system that developed in previous research. As a result, requirement information input time reduction in Seumter system showed high satisfaction. But there was as low usability because building approval submission system cannot support some information for building approval in seumter. If the system will do utilization and management with the building approval system, the applicant can be using BIM base design document information and saving the time that takes at building approval submission. Study about the system improvement is required for application to building approval system.

  • PDF