This paper aims to design a policy-assessment tool liking the Environmental Impact Assessment(EIA) and the Cost Benefit Analysis (CBA). As a step towards the incorporation of environmental and economic considerations, the approach used herein takes the form of integrating quantitative information on environmental benefits and costs associated with implementing the project into the existing framework of the EIA. Our case study is an project appraisal of a solar energy plant. It is confirmed that the technique is operational, however, there are certain limitations for a complete assessment. The difficulty mainly originated from the omission of important information from each step of the valuation process. Alternatively stated, some environmental services are not identified, nor quantified, and nor monetized in the process. More case studies are warranted in the future along with elaboration in methodology of techniques. In addition, the construction of a database on environmental values will be required to accumulate reliable and systematized data. These are the necessary conditions to improving quality in application of techniques as well as providing comprehensive and balanced information to decision makers.
Proceedings of the Korea Society for Energy Engineering kosee Conference
/
2003.05a
/
pp.415-423
/
2003
Korea Electric Power Research Institute(KEPRI) had worked a comprehensive Plant Lifetime Management (PLiM) project for a CANDU plant in corporation with Korea Hydro and Nuclear Power(KHNP). The project had been performed to understand the aging status of major components screened from the plant and to address provisions for the continued operation over its design life. A feasibility of the continued operation was reviewed in the aspects of technology, economics, and regulatory environments. This paper introduces general approach of aging assessment, screening of critical components and an experience of aging assessment for an example of fuel channel that is the most critical component in CANDU plant.
The objective approach for assessment of stream naturalness is an essential part of the stream restoration project. This study proposes the methodology for the assessment of stream naturalness considering physical, biological and chemical factors. Physical factors consists of riffle and pool, river bed material, bank protection, floodplain vegetation and levee materials; biological factors are benthic macroinvertebrate, KSI (Korean Saprobic Index), and IBI (Index of Biological Integrity) and chemical factors are pH, DO (dissolved oxygen), and TP (total phosphorus). This procedure is applied to the Mokgamcheon. As a result, the downstream of Mokgamcheon (zone I) needs the prompt improvement of stream naturalness, compared to the others (zone II and III). This evaluation technique will be an effective tool to quantify the stream naturalness and can be used to set the target of stream restoration project.
Hyunsoo Kim;Hyunsoo Lee;Moonseo Park;Kwang-pyo Lee
International conference on construction engineering and project management
/
2009.05a
/
pp.1231-1236
/
2009
Many work-related risk factors can cause construction site hazards. Therefore, safety management begins with measuring the magnitude of risk involved in a project. This study proposes a methodology for risk assessment of major trades at a particular construction site. To assess risk, this methodology integrates hazard severity and frequency, and their magnitude is calculated based on actual work-site hazards. This methodology also considers the influence factors that affect the frequency of work-related hazards. To select the appropriate influence factors, a two step approach is deployed. First, the predominant factors are identified through a literature review. Second, a selective process filters out the influence factors that are difficult to analyze quantitatively, and these extracted factors are weighted using expert surveys. Finally, the factors are combined and a quantitative risk assessment methodology is proposed.
Korean Journal of Construction Engineering and Management
/
v.16
no.1
/
pp.3-14
/
2015
Since the global financial crisis, the Korean domestic construction market has continuously experienced downturns, and the Korean domain construction firms'profitability has been persistently deteriorated. Domestic construction firms have rapidly advanced to overseas markets exclusively for the construction contract packages. However, the profitability for the construction contracts has been lower compared to engineering or project management contracts. One of the critical issues the Korean firms have faced was project management capability across all phases in project execution. Even though several project management capability assessment tools were introduced, most tools were applicable to a wide variety of industry sectors rather than construction industry. Project management capability assessment tool specifically applicable to domestic CM firms was developed through this research, in order to assess project and program management capabilities and improve the competitiveness in overseas market Also, the correlation between project, programs, and the CM infrastructure were identified. The CM firms were divided into two groups according to the size of the business, and both were evaluated at the project and the program level based for the 9 different criteria. The project management capability assessment tool developed for the CM firms can be used for self-assessment to distinguish the strengths and weaknesses of each company at the project and program level. In addition, the current status of each group can be identified by spotting improvement areas for the management capabilities.
In this study, the concept of safety impact assessment to achieve 'Design-for-Safety' in design phase is introduced. For this purpose, safety impact assessment model was devised and a methodology using the risk-based safety impact assessment approach for NATM of tunnel projects is suggested. The suggested methodology includes safety information survey, classification of safety impact factors caused by design and construction, and quantitative estimation of magnitude and frequency of safety impact factors. A real-world case study on the safety impact assessment of a tunnel construction project is also provided in the paper.
The European Community (EC) began dealing with the subject of environmental impact assessment (EIA) in the mid-1970s. After ten years of preparatory work and more than 20 draft versions, the EC Council of Ministers adopted, in 1985, the Directive on the assessment of the effects of certain public and private projects on the environment (85/337/EEC). This directive requires the member states to make EIA mandatory for certain projects. Its Article 3 defines the purpose of the instrument: "The environmental impact assessment will identify, describe and assess the direct and indirect effects of a project. There are no rules on scoping or on post-project analysis. However, member states are free to adopt, in their domestic legislation, more stringent rules regarding the scope and procedure of EIA. Consequently, they have developed national EIA systems which differ considerably from each other. Also, EIA practice in each of these countries is different from that in the others. In 1992, the EC Council adopted the 'Flora, Fauna, Habitat' Directive which lays down an additional EIA requirement. Member states will have to develop a network of 'European' nature conservation areas. Each project or plan possibly endangering these areas will have to be assessed whether it is in line with the protection purposes laid down for them. Although the directive does not say so explicitly, this means that a kind of EIA will have to be carried out for those projects and plans. For several years, the Commission has been developing proposals for a directive on EIA of plans and programmes ("strategic EIA"). This would supplement directive 85/337/EED, and would require and EIA for plans and programmes influencing decisions on specific projects(e.g. agricultural plans or energy programmes). At present, procedural and methodological questions of strategic EIA are being discussed extensively both within and without the European Union.
Journal of Elementary Mathematics Education in Korea
/
v.1
no.1
/
pp.109-121
/
1997
A lot of educators claim that the open education should be performed in elementary classroom, but it is true that they do not suggest the specific direction of practicing open education in case of mathematics subject. Although a project lesson is recommended, there is little case that suggests the direction of practice and the evaluation method of project lesson. Therefore this study searchs for the possibility of practicing open education in elementary mathematics classroom by reviewing the portfolio assessment and suggesting the specific case of applying the portfolio assessment to project lesson. A portfolio is a folder in which is recording solution process, student's self reflection, and teacher's comment, about topics and problems more than one. Students can see their own varying aspects and recognize their own merits and demerits, sincerities, and potentialities by portfolio assessment. Futheremore, teacher can both grasp the student's cognitive situation and give them the professional advice about the cognitive development. That is, they can perform the instruction underlining the learner's ability and personality, by identifying what Vygotsky calls 'the proximal zone of development' through portfolio assessment. Consequently, portfolio assessment is an alternative evaluation method for integrating process and product of learning, and can be used as an important tool for developing the learner's potential possibility of self-realization.
Journal of the Korean Society of Environmental Restoration Technology
/
v.26
no.3
/
pp.43-55
/
2023
The railway project is an essential green transportation tool that is considered suitable for the domestic and foreign policy direction of carbon neutrality, but there are some limitations, such as damaging important carbon absorption sources during construction. This study analyzed the environmental impact assessment related to carbon absorption sources of greenhouse gas evaluation items conducted during the railway project, and limitations and implications were derived. The analysis of environmental impact assessment guidelines related to railway projects and carbon absorption sources dealt with prediction and reduction methods related to carbon absorption sources, but guidelines, including environmentally friendly railway construction guidelines, lacked descriptions. Since the greenhouse gas environmental impact assessment, 83 railway project environmental impact assessments have been reviewed, but in some cases, carbon absorption-related predictions have not been implemented, or carbon absorption-related reduction measures have been insufficient. In addition, there were cases where there was a limit to calculating emissions and reduction or where the reduction value was insignificant compared to emissions. In order to supplement the environmental impact assessment in the field of carbon absorption sources related to railway construction projects, alternatives such as quantitative emission and low reduction calculation, review of the no net loss system using the total environmental resource system, and linkage with climate change impact assessment are needed.
Hossen, Muhammed Mufazzal;Kang, Sunkoo;Jung, JC;Kim, Jonghyun
Journal of the Korean Society of Systems Engineering
/
v.11
no.1
/
pp.9-24
/
2015
Construction industry faces a lot of inherent uncertainties and issues and the construction phase of nuclear power project is not free from this risk. This paper investigates promising methodologies to be used on nuclear power plant (NPP) construction schedule delay risk assessment by using entry level systems engineering approach. This study contains how the initial concept for the risk assessment methodology has been developed. In this point of view, this work structured on three main phases: needs analysis (NA), concept exploration (CE), and concept definition (CD) through systems engineering (SE) approach. Traditionally, the SE process is applied to technical development programs but this study opens up a new avenue that SE can also be successfully applied to the development and optimization of the risk assessment model. This study provides a rational and systematic process for developing and selecting the best risk assessment model. This paper selects analytic hierarchy process (AHP) method to assess NPP construction schedule delay risk for international project. As conclusion, the proposed concept and selected method can discriminate successfully and clearly among schedule delay risk assessment methods.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.