• Title/Summary/Keyword: Project Approach Method

Search Result 390, Processing Time 0.023 seconds

The Effects of the Project Approach on Scientific Knowledge and Attitudes of Elementary School Students (프로젝트 접근법을 통한 학습지도가 초등학생의 과학적 지식과 과학적 태도에 미치는 영향)

  • 권치순;김율리
    • Journal of Korean Elementary Science Education
    • /
    • v.23 no.2
    • /
    • pp.110-115
    • /
    • 2004
  • This study investigated the effects of the project approach in science teaching on scientific knowledge and attitudes, science related attitudes of the 6th grade students. Students engaged in the study were divided into comparison group and experimental group. The project approach was applied to the experimental group with various activities while the traditional teaching method was applied to the comparison group with science text book and teacher's guidebook. The data were statistically analysed by SPSS WIN 8.0. The results are as follows: The students of the project approach in science teaching made significant progress in scientific knowledge and attitudes, science related attitudes (p<.05). The students in the project approach was more effective in improvement of curiosity, critical thinking, positive thinking than the traditional teaching method. And the project approach was good for causing interest and helping student's science learning.

  • PDF

Effectiveness of the Project Approach Method in the Scientific Problem Solving Ability of Children (프로젝트 접근법이 유아의 과학적 문제 해결력에 미치는 영향)

  • Chae, Soon Hee;Lee, Gi Hyoun
    • Korean Journal of Child Studies
    • /
    • v.23 no.6
    • /
    • pp.103-119
    • /
    • 2002
  • In this investigation of the effectiveness of the Project Approach Method the 32 4-to 5-year-old subjects (16 each in the experimental and comparative groups) were pre-tested before the Project Approach Method was applied (23 times over 7 weeks) in the experimental group while the comparative group had science activities using standard unit methods of instruction. Then, all the children had a posr-test. Data were analyzed by t-test and ANCOVA. Results showed differences between the experimental group and the comparative group in their scientific problem solving ability. Specifically, effects were found on 14 sub-factors, but no difference were found on 3 sub-factors.

  • PDF

A View from the Bottom: Project-Oriented Risk Mining Approach for Overseas Construction Projects

  • Lee, JeeHee;Son, JeongWook;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.97-100
    • /
    • 2015
  • Analysis of construction tender documents in overseas projects is a very important issue from a risk management point of view. Unfortunately, majority of construction firms are biased by winning contracts without in-depth analysis of tender documents. As a result, many contractors have incurred loss in overseas projects. Although a lot of risk analysis techniques have been introduced, most of them focus project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to control and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized and assess them. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining, data mining, and information visualization. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

A Study on the Approach Method for the Excavation of the Outstanding Projects in the Agricultural Sector (농업분야 국제개발협력 우량사업 발굴을 위한 접근법 연구)

  • Ji, Seong Tae
    • Journal of Agricultural Extension & Community Development
    • /
    • v.21 no.3
    • /
    • pp.181-213
    • /
    • 2014
  • This study analyzes the approach method for the excavation of the outstanding projects in order to improve the ODA quality in the agricultural sector in a situation of the recent quantitative expansion of the Korea's ODA. This analysis is based on the ODA development paradigm of the international society, Korea's ODA development trends, the problems of system, procedure and contents. The analysis drew five approaches, such as an approach based on the strategies, an approach based on the comparative advantage, an approach based on the partnership, an approach based on the networking, an approach of modeling. If each approach method is applied to the excavation of project closely linked to other approach methods, it would be easier to excavate outstanding project. And it could lead to enhancement of project effectiveness. This study introduced the KAPEX program which excavate the customized ODA projects through the application of these approach methods.

An Effect of Project Learning Method in the Refrigeration Instruction for Students (냉동수업에서 프로젝트 학습법이 학생들에게 미치는 영향)

  • PARK, Jong-Un;YOUN, Joung-In;CHO, Jee-Yeh
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.17 no.2
    • /
    • pp.252-259
    • /
    • 2005
  • In this research, as an educational tool in the Refrigeration instruction, a project learning method was applied which enables active hand on practice and encourages a more active participation of students with an increased level of interest in learning. The purpose of this study is to present project learning method as an educational tool that can arouse interest and motivation of students by an active hands-on learning process. This will aid in the enhancement of understanding of educators and students in the project learning method, and assist in development of project learning method that can increase intuitiveness and originality of students. For the purpose of the study, the following questions were asked. First, what is the level of existing knowledge pertaining to Refrigeration Training Program of students? Second, what effect does Refrigeration Training Program conducted via the project approach have on the level of motivation and interest of students? Third, what effect does Refrigeration Training Program conducted via the project approach have on the study habits of students?

Forecasting Project Cost and Time using Fuzzy Set Theory and Contractors' Judgment

  • Alshibani, Adel
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.174-178
    • /
    • 2015
  • This paper presents a new method for forecasting construction project cost and time at completion or at any intermediate time horizon of the project duration. The method is designed to overcome identified limitations of current applications of earned value method in forecasting project cost and time. The proposed method usesfuzzy set theory to model uncertainties associated with project performance and it integrates the earned value technique and the contractors' judgement. The fuzzy set theory is applied as an alternative approach to deterministic and probabilistic methods. Using fuzzy set theory allows contractors to: (1) perform risk analysis for different scenarios of project performance indices, and (2) perform different scenarios expressing vagueness and imprecision of forecasted project cost and time using a set of measures and indices. Unlike the current applications of Earned Value Method(EVM), The proposed method has a numberof interesting features: (1) integrating contractors' judgement in forecasting project performance; (2) enabling contractors to evaluate the risk associated with cost overrun in much simpler method comparing with that of simulation, and (3) accounting for uncertainties involved in the forecasting project cost.

  • PDF

A Multilevel Project-Oriented Risk-Mining Framework for Overseas Construction Projects

  • Son, JeongWook;Lee, JeeHee;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.39-40
    • /
    • 2015
  • As international construction market increases, the importance of risk management in international construction project is emphasized. Unfortunately, current risk management practice does not sufficiently deal with project risks. Although a lot of risk analysis techniques have been introduced, most of them focus on project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to manage and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

Quantifying Risk Factors on Cost Performance By Characterizing Capital Facility Projects

  • Jang, Myung-Hoon;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.177-183
    • /
    • 2006
  • Risk-based estimation has been successfully introduced into the construction industry. By incorporating historical data associated with probability analysis, risk-based estimate is an effective decision support aid in considering whether to launch a particular project. The industry challenges, however, especially related with management issues, such as labor shortage, wage growth, and supply chain complexity, have often resulted in poor cost performance. The insufficient assessing the project characteristics (i.e., resource availability, project complexity, and project delivery method) can be the main reasons in the poor cost performance. Because the accuracy level of cost performance prediction can be enhanced by extensive evaluation of the subject project characteristics, a new approach for predicting cost performance in an earlier stage of a project can improve the Industry substantiality, in other words, value maximization. The purpose of this paper is to develop a new methodology in developing a risk-based estimate tool by incorporating extensive project characteristics. To do this, an extensive industry survey was conducted from both private and public sectors in building industry in Korea. In addition, significant project characteristics were identified in terms of cost performance indicator. Although the data collection is limited to Korean industry the suggested approach provides the industry with a straightforward methodology in risk management. As many researchers maintained that front-end planning efforts are crucial in achieving the successful outcome in building projects, the new method for risk-based estimation can Improve the cost performance as well as enhance the fulfillment in terms of business sustainability.

Assessment of Project Cost Reduction Potential Adopting Cases-Synthetic Approach - Focused on the Apartment Building Construction Project - (시공방법 개선사례 조합에 의한 원가절감 가능성 평가)

  • Choi, Jong-Soo;Choi, Young-Jun;Chae, Seong-Tae;Yoo, Sung-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.135-144
    • /
    • 2009
  • The primary focus of this study has been directed towards assessing the potential impact of construction method improvement on a reduction in project cost. A total of 90 actual application cases were collected from a public organization and private construction firms, and 32 cases were used in analysis by adopting a synthetic approach. The level of cost reduction was measured in terms of material and labor cost by comparing the existing method and the improved method. An analysis of the results indicates that project cost can be reduced by up to 5.26 percent compared to a normal project by adopting a synthetic approach. Additional benefits include the assurance of uniform quality, savings in terms of labor and/or materials, and improved productivity. The potential of the applicability of this approach to other types of buildings and the implications of research findings were discussed in detail.

MULTI-SCALE MODELING AND ANALYSIS OF CONVECTIVE BOILING: TOWARDS THE PREDICTION OF CHF IN ROD BUNDLES

  • Niceno, B.;Sato, Y.;Badillo, A.;Andreani, M.
    • Nuclear Engineering and Technology
    • /
    • v.42 no.6
    • /
    • pp.620-635
    • /
    • 2010
  • In this paper we describe current activities on the project Multi-Scale Modeling and Analysis of convective boiling (MSMA), conducted jointly by the Paul Scherrer Institute (PSI) and the Swiss Nuclear Utilities (Swissnuclear). The long-term aim of the MSMA project is to formulate improved closure laws for Computational Fluid Dynamics (CFD) simulations for prediction of convective boiling and eventually of the Critical Heat Flux (CHF). As boiling is controlled by the competition of numerous phenomena at various length and time scales, a multi-scale approach is employed to tackle the problem at different scales. In the MSMA project, the scales on which we focus range from the CFD scale (macro-scale), bubble size scale (meso-scale), liquid micro-layer and triple interline scale (micro-scale), and molecular scale (nano-scale). The current focus of the project is on micro- and meso-scales modeling. The numerical framework comprises a highly efficient, parallel DNS solver, the PSI-BOIL code. The code has incorporated an Immersed Boundary Method (IBM) to tackle complex geometries. For simulation of meso-scales (bubbles), we use the Constrained Interpolation Profile method: Conservative Semi-Lagrangian $2^{nd}$ order (CIP-CSL2). The phase change is described either by applying conventional jump conditions at the interface, or by using the Phase Field (PF) approach. In this work, we present selected results for flows in complex geometry using the IBM, selected bubbly flow simulations using the CIP-CSL2 method and results for phase change using the PF approach. In the subsequent stage of the project, the importance of effects of nano-scale processes on the global boiling heat transfer will be evaluated. To validate the models, more experimental information will be needed in the future, so it is expected that the MSMA project will become the seed for a long-term, combined theoretical and experimental program.