• Title/Summary/Keyword: Progress Schedule

Search Result 156, Processing Time 0.031 seconds

Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction - (UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 -)

  • Park, Jung-Lo;Kim, Kyung-Hwan;Kim, Jael-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

Research of Schedule Managing and Forecasting for Project Progress Method in Defense Research & Development using Earned Schedule Concept (Earned Schedule 개념을 활용한 국방 연구개발 사업진도 기법의 일정 관리 및 예측 기능 연구)

  • Cho, Jungho;Ryu, Sangchul;Lim, Jaesung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.22 no.4
    • /
    • pp.567-574
    • /
    • 2019
  • Traditional project progress method(PPM) has been used for Korean defense research and development project management for the last 20 years. However, it is difficult to intuitively understand the performance in terms of the project schedule, because the PPM does not provide the function of managing and forecasting project schedule. Therefore, this paper proposes new schedule managing and forecasting function for the PPM using earned schedule management concept. We verify the effectiveness of the proposed functions through several defense projects and prove that it is possible to reinforce the schedule management function of the PPM.

A Study on the Development of a Real-Time Schedule Progress Control System in Steel Structural Construction (철골골조공사의 실시간 진도관리 시스템 구축에 관한 연구)

  • Kim, Kyong-Hoon;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.886-891
    • /
    • 2007
  • All sorts of technique for schedule progress management is being developed recently. These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using IDEF0 model, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

Research on Improving Schedule Forecasting Method for Delayed Defense Research & Development Project (지연된 국방 연구개발 프로젝트의 일정 예측방식 개선 연구)

  • Cho, Jungho;Lim, Jaesung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.23 no.3
    • /
    • pp.286-293
    • /
    • 2020
  • Since Dr. Lipke announces earned schedule management(ESM) in 2002, it has been used in project management to make up for the insufficient schedule management function of earned value management technique. However, it is difficult to accurately forecast the schedule of delayed defense research and development(R&D) projects with the ESM technique. Therefore, this paper proposes a new schedule forecasting method considering the progress of delayed work in ESM technique. This concept can also be adopted to the traditional project progress management (PPM) technique. We verify the effectiveness of the proposed concept through several defense R&D projects and prove that it is possible to supplement the schedule forecasting of the ESM and PPM technique.

A Study on the Specificity of Construction Progress for Landscape Construction Schedule Management -With regard to Landscape Construction of Housing Complex- (조경공사 공정관리를 위한 공정진도의 특성에 관한 연구 -주택단지 조경공사 사례를 대상으로-)

  • 박원규
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.20 no.4
    • /
    • pp.93-101
    • /
    • 1993
  • The purpose of this study is to analyze th especificity of landscape construction progress in order to develop the model of landscape construction schedule management. Nine case study area in housing complex was selected and the graphic curve of the accumulative payment by landscape construction schedule was analyzed. And the results are as follows: The graphic curve of common construction progress is S-curve but that of landscape construction progress is parabolic-curve, because landscape construction concentrally progress in last period of construction schedule. And particularly parabolic-curve seems to rise up suddenly in the last period when landscape construction amount is small.

  • PDF

Improvement of Cost-Schedule integration based Progress Management through PMIS (비용-일정통합기반 진도관리 개선방안)

  • Yoon, You-Sang;Suh, Sang-Wook;Jang, Gyu-Seong;Choi, Jang-Shik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.144-152
    • /
    • 2013
  • Recently construction projects become more bigger. So construction companies have being performed cost and schedule management task by using PMIS. In engineering and construction phase, progress management which occur the most frequent information I/O(input and output) should be managed effectively by PMIS. Although most information by PMIS manage efficiently, cost-schedule information for progress management is difficult to be managed due to recurrent information input. thus when changed by price fluctuation and change order, progress management could not connnect cost information with schedule information. So it caused inaccuracy of progress measurement and data increase in PMIS. To solve this problem, This study suggests improved module for progress management through integration of cost-schedule using quantity take-offs as progress measurement method.

Development of Active 5D CAD System for Replaning Progress Schedule According to Change of Project Cost (사업비 변동에 따른 공정계획 재수립을 위한 능동형 5D CAD 시스템 개발)

  • Kim, Hyeonseung;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.54-61
    • /
    • 2016
  • The initial planned annual cost is frequently adjusted under the construction process in construction projects. If the annual cost is reduced than the initial planned cost, the number of possible activities is also reduced from initial planned progress schedule. In such cases, project manager need to replan the progress schedule with possible activities within changed annual cost. However, most project manager will proceed as planned schedule without any change. After the project cost has been exhausted, there are many cases to stop the operation of the construction site. This study developed active 5D CAD system that can replan the progress schedule within changed annual cost and simulate the cost status according to the changed schedule for cost visualization. This system can be used as a decision-making tool in the replaning progress schedule and will be able to increase the practical usability of 5D CAD system.

A Study on a Systematization of Preliminary Construction Control for the Quality and Schedule Management of APT Construction (품질확보 및 공기지연예방을 위한 공사관리 체계화에 관한 연구)

  • Park, Hong Tae;Lee, Yang Kyoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.347-353
    • /
    • 2008
  • Generally speaking, it is important to know the activities itself exactly and to control the activities correctly so as to assure timely progress and the quality of any project. In order to progress smoothly in accordance with construction schedule, it is important to systematize the preliminary arrangements necessary for each process and then manage them. In this study, in order to progress smoothly the quality and schedule management of the construction, we can be made systematically pre-works in accordance with construction schedule by the civil construction items of the apartment house construction. we suggested pre-construction control item by the workers through experiential method of construction engineers in accordance with network schedule.

Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit (성과측정유닛을 활용한 건설 비용 - 일정 통합관리 방안)

  • Kang, Namhee;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.42-51
    • /
    • 2017
  • Measuring and evaluating project progress and performance are the key element of the construction project success. Construction progress is typically measured quantitatively by evaluating cost and time allocated to the project deliverable, and thus properly integrating cost and time is essential to the project management. This research was performed to propose an alternative methodology to integrate the cost and time and provide a framework for the progress measurement. The researchers developed a typical work process for the cost and schedule planning and also developed an alternative cost-schedule integration method by using progress integration units (PIU). A discipline of a construction phase served as a common level for WBS and CBS integration, so the PIUs'were defined under discipline. A case study project was selected to validate the developed methodology. The result showed the proposed method improved efficiency of cost and time integration. The result also showed the excluding material for the progress measurement purpose significantly reduced the bias of progress measurement.