• Title/Summary/Keyword: Progress Payments

Search Result 15, Processing Time 0.026 seconds

A study activating devices in scheduling management for analyzing progress payment in Korea (기성지급방식 비교분석을 통한 국내 공정관리 활성화 방안에 관한 연구 -경부고속철도 공사와 대만 고속철도공사 비교 중심으로-)

  • 이태식;김영현;정현진;김영환;김대영;윤철수;노시현
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.66-71
    • /
    • 2001
  • Most payments in domestic construction are issued in lumpsum unit price contracts according to the completed construction rate. This method generates problems in losing time and increased costs for the owner and contactor. In overseas projects, payments are issued in accordance to completed milestones. The milestones themselves base on the original schedule and allow effective schedule management on the tasks. In domestic construction, however, introduction of milestone payments requires enhanced management capability of owners and contractors. Hence, this study investigating how to activate schedule management devices to analyze progress payments in domestic construction.

  • PDF

A Case Study on Owner's Loss Incurred due to the Financial Cost of Public Construction Works in Korea (국내 공공공사에서 발주자 손실의 금융비용 사례연구)

  • Jeong, Min;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.136-145
    • /
    • 2008
  • Occasionally an owner of public construction work pays financial costs in addition to progress payments. However, the overall scale of financial costs are not known. This research examines, based on a case study, the financial cost incurred in public construction works and the following issues: the overall scale of financial costs, the impact on financial costs on the owner, and the impact of timing on the overall sum of the financial costs. Annually, more than 2.3 trillion KRW are paid as progress payments for public construction work; yet, there is no research data showing the scale of financial costs thus incurred. The purpose of this research is to illustrate the scale of financial costs incurred due to progress payments for public construction works, and to suggest alternatives that would improve relevant regulations.

A Study on the Improvement of the Criteria for Calculating Compensation of Deferment of Defense Acquisition Projects (무기체계 연구개발시 지체상금 개선방안에 관한 연구)

  • Kim, SeongHo;Ryoo, YeonUk;Chun, SamHyun
    • Convergence Security Journal
    • /
    • v.17 no.4
    • /
    • pp.31-37
    • /
    • 2017
  • This study compares the main features of the Act of National Contract with the Act of Defense Aquisition Program, which is the only one in Korea for long-term contracts. When applying the progress payments system to the defense R&D project, We can prevent disputes between parties and create a stable development environment through smooth partnerships. Smaller, direct and indirect losses can be alleviated, such as the waste of administrative power required to deal with disputes due to the payment of delayed prizes and restrictions on business activities due to the difficulty of forecasting the results of companies. In large measure, we will be able to procure a high-quality weapon system in a timely manner to support the security of the nation as well as international competitiveness through the growth of our defense industry.

Adjudication in Australia: A Study of Adjudication Activity in New South Wales for 2013/14

  • Brand, Michael C.;Kim, Jinu
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.396-400
    • /
    • 2015
  • The Building and Construction Industry Security of Payment Act 1999 (NSW) (the NSW Act) is a unique form of statutory regulation for the building and construction industry, which gives virtually all industry participants a statutory right to, and a means of recovering, payments for work done under a construction contract. The research aim is to examine current trends in adjudication applications and determinations under the NSW Act. The data used for this study was the collected by the NSW Office of Finance & Services as part of a regular reporting regime for the period from 1 July 2013 and ending on 30 June 2014. With just over 817 adjudication applications having been made over the 2013/14 period, the data indicates that adjudication is being frequently utilized by stakeholders in the NSW building and construction industry as a means of progress payment recovery. Adjudication is proving to be a popular choice for those making claims of less than AU$250,000. Claimants were awarded about 36% of the total of claimed amounts and claimants are generally successful at adjudication in terms of the proportion of the claimed amounts determined in their favour. This is particularly so in relation to claims of less than $100,000, which represents about 70% of the total applications made over the reporting period. The data indicates that adjudication fees are generally modest enough to conclude that adjudication provides claimants across all claim ranges with a relatively inexpensive means of having disputed progress payments determined by an independent adjudicator.

  • PDF

A Phenomenological Study on the Subsidiary Program of Health Management in Small Scale Industries (소규모사업장 보건지도사업내용의 현상학적 연구)

  • Cho Yoo-Hyang;Lee Myung-Sook;Kim Myung-Soon;Kim Hyun-Li
    • Journal of Korean Public Health Nursing
    • /
    • v.12 no.1
    • /
    • pp.1-12
    • /
    • 1998
  • This study was conducted to grasp the progress of the health management program in small scale industries with phenomenological approach. The industrial health care system compose of manpower, devices, and facilities such as medical resources, organization, service delivery system, financial resources, payments, and management system is important for the industrial health. Especially health management program should be provided feasible conditions to workers. The data collection period was 2 months from September 1 to October 30, 1997. The indepth interview results for health monitor, labors, and occupational health nurses were analyzed by Giorgis' phenomenological method. The major results were as follows: 1. The workers, health monitors and nurses felt that the subsidiary program of health management in small scale industries were necessary. This project for small-size industry can be set-up through complementary education for health monitors and resolvement of nurses' six suggestions. It is necessary to provide followings ; 1) Properly devision of industry 2) More clear guidance for health management at visiting time 3) Legitimate incentive system 4) Health education materials and devices 5) Change of fee and material payments at visiting 6) Budgets and system for medication and vaccination at visiting 2. Above all, it is suggested that the strategics of the health management program should be developed.

  • PDF

New Construction Accident Index Based on Number of Accident and Progress Payments (건설기성과 재해자수에 기반한 건설재해지표 산정방식)

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.3
    • /
    • pp.293-303
    • /
    • 2022
  • In construction work, it can be difficult to know the exact number of full-time workers, so the accident rate is calculated using the approximate number of full-time workers. In addition, as the accident rate calculation is performed based on the assumption that the number of accidents is proportional to the approximate number of workers, the reliability of the calculation result may be questionable. This study proposed a new indicator for accident level based on the progress payment and the number of injuries. The accident-progress ratio, which can be calculated by simply dividing the number of injuries by progress payment, can replace the existing accident rate index or be used as an auxiliary indicator of the accident level. The correlation coefficient between the number of injuries and the progress payment was higher than that between the number of injuries and the number of construction workers. In addition, over the past 10 years, the accident rate has been increasing, whereas the accident-progress ratio has showed a decreasing tendency. This might leave room for different interpretations of the annual variation in the accident level in the construction industry.

A Study on Simplified Payment Method by Progress Measurement for Specified Activity - Focusing on Construction of Eco-River (대표공종의 선정을 통한 약식 기성 산정 방법에 관한 연구 - 자연형 하천공사를 중심으로)

  • Lee, Jeong-Yoon;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.160-169
    • /
    • 2010
  • In domestic public works, there are several problems in the measurement of payments based on the bill of quantity, which doesn't match with the activity progress rate, heavy paper works and complicated procedures. It can be classified formal and simplified method. By using the simplified method, it can be solved many problems by summarizing the procedure, but is not generally used. This paper proposes a payment method by progress measurement for specified activity based on WBS(Work Breakdown Structure) verifying efficiency which reduced cost account and advanced work on payment compare to method of domestic public works using the data about construction of eco-river. This method will be an important contribution on being a base for cost-schedule integrated management which were verified and also improving efficiency on measuring payment.

ESTABLISHMENT OF CONSTRUCTION INDUSTRY CREDIT GUARANTEE SYSTEM-BASED ON TAIWAN'S CONSTRUCTION INDUSTRY

  • Ting-Ya Hsieh;Tsung-Shi Liu
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.399-406
    • /
    • 2011
  • Various construction bonds and warranties critically burden the general contractor. Also, sporadic or cumulative delays of progress payment by the owner can further trap the contractor in a financial quagmire. Facing the possibility of cash flow deficiency and callous response from the banks, most construction firms may become financially incapable of market competition, and attractive project tenders become a bidding game among few deep-pocket players. The downside of such market environment is that the depth of pocket, rather than that of professional competency dictates the choice of market winners. In Taiwan, this has been a potential crisis to the construction industry after the financial crisis which started out since 2008. To encounter this problem, this research will examine the means to better manage the construction industry. Essentially, a credit guarantee system (CGS) is the prime solution to strengthen a bank's confidence in any particular construction firm. Thus establishing a national platform which evaluates and rewards a construction firm's overall credibility is pivotal, and this third-party rated credit can help a bank to render a loan more wisely. Finally, this paper will propose the ideal operating schemes of construction-specific CGS in Taiwan and a credit scoring prototype model for construction industry, as reference for the government and banks, respectively.

  • PDF

Trends in Digital Trade Policies and Trade Rules in Major Overseas Countries (해외 주요국의 디지털 통상 정책 및 무역 협정 규범 동향)

  • Kim, J.E.
    • Electronics and Telecommunications Trends
    • /
    • v.37 no.5
    • /
    • pp.1-10
    • /
    • 2022
  • Digital trade rules are crucial in supporting the digital economy as the rules effectively reduce unnecessary trade barriers. This study introduces various approaches that major countries take regarding digital trade policies and rules. Comprehensive and Progressive Agreement for Trans-Pacific Partnership has introduced comprehensive rules on e-commerce, including binding articles on the free flow of information, location of computing facilities, and source code. More recent e-commerce provisions or digital trade agreements cover wider range of issues, from cyber security, artificial intelligence, and data innovation to electronic invoicing and payments. Multilateral negotiations on digital trade rules, including the World Trade Organization E-commerce Joint Statement Initiatives and Indo-Pacific Economic Framework, are in progress. Thus, countries involved are expected to respond to new digital trade issues with long-term strategies considering domestic policy objectives.

Lone Parent Families and Poverty: Policy Changes in Britain. (한부모 가족과 빈곤: 영국에서의 정책변화)

  • Kang, Wook-Mo
    • Korean Journal of Social Welfare
    • /
    • v.56 no.1
    • /
    • pp.127-153
    • /
    • 2004
  • In the absence of a male provider the state must decide how far and under what conditions it will provide for the mother and her children. In the case of lone mothers, there are three main possible sources of income: the labour market, the absent father, and the state. However, the relative proportions of these three sources vary significantly from country to country as well as from individual to individual within the group of lone parents. Until very recently the UK has been alone among countries of the EU in allowing lone parents to draw benefits without making themselves available for work so long as they have dependent children. However, in the 1990s, the UK government introduced major changes to his policies regarding lone parents. The UK government attempted to restrict the role of the state as a source of income for lone parent families. At the beginning of the 1990s, the emphasis in the UK was put on securing more money from 'absent fathers' to maintain. However, the policy was unsuccessful and by the mid-1990s attention to the only other possible source of income for lone parent families, the labour market, was stepped up, notwithstanding the ambivalence of politicians about the desirability of women with young children entering employment. From 1998 the Labour government introduced a series of reforms aimed at reducing both worklessness and poverty by raising welfare payments to families both in and out of work, improving financial incentives to work and introducing a more proactive welfare system. The results presented here suggest that these policies have raised the employment rates of lone parents by around 5 percentage points, or 80,000. These employment gains have come from a welfare reform package that does not require lone parents to search for jobs, or uses time limits in welfare programmes. In addition these gains have been achieved despite generous increases in welfare payments for lone parents who do not work. These earnings gains combined with the more generous welfare are making rapid progress in reducing lone parents' poverty.

  • PDF