• 제목/요약/키워드: Production Plan

검색결과 1,055건 처리시간 0.023초

조선산업의 공급망을 고려한 APS 생산계획 모듈 설계 (The Designing of Production Planning Module for Advanced Planning System with Respect to Supply Chain of the Shipbuilding Industry)

  • 남승훈;주수헌;류철호;신종계
    • 한국CDE학회논문집
    • /
    • 제21권3호
    • /
    • pp.353-362
    • /
    • 2016
  • As ships become larger and construction of offshore plants increases recently, the amount of outsourcing has increased accordingly in the shipyard. Consequently, the system integration in terms of SCM (Supply Chain Management) of information and material flows has become much more important. Especially, since the SCM in the shipbuilding industry is operated in accordance with the production planning in connection with design, purchasing and production process which are the main components of the supply chain, the best production plan has to be established over the whole scheduling activities from the long-term planning to the short-term planning. The paper analyzes the characteristics of the SCM and the production planning system and suggests the need and the direction of APS (Advanced Planning System) development specialized in the supply chain management only for shipbuilding industry. Furthermore, propose a new SCP-Matrix (Supply Chain Planning Matrix), which is the basis of the APS development, appropriate for the shipbuilding industry and draw the core function of the APS module for the practical production plan.

벌크 화물선용 자동 밸러스트수 교환계획 시스템 개발 (Optimized Ballast Water Exchange Management for Bulk Carriers)

  • 홍충유;박제웅
    • 한국해양공학회지
    • /
    • 제18권4호
    • /
    • pp.65-70
    • /
    • 2004
  • Many port states, such as New Zealand, U.S.A., Australia, and Canada, have strict regulations to prevent arriving ships from discharging polluted ballast water that contains harmful aquatic organisms and pathogens. They are notified that transfer of polluted ballast water can cause serious injury to public health and damage to property and environment. For this reason, ballast exchange in deep sea is perceived as the most effective method of emptying ballast water. The ballast management plan contains the effective exchange method, ballast system, and safety considerations. In this study, we pursued both nautical engineering analysis and optimization of the algorithm, in order to generate the sequence of stability and rapidity. A heuristic algorithm was chosen on the basis of optimality and applicability to a sequential exchange problem. We have built an optimized algorithm for the automatic exchange of ballast water, by redefining core elements of the A$\ast$ algorithm, such as node, operator, and evaluation function. The final version of the optimized algorithm has been applied to existing bulk carrier, and the performance of the algorithm has been successfully verified.

자동차 차체금형 가공용 공정계획 시스템(II)-작업 계획과 NC 코드 후처리 (A Process Planning System for Machining of Dies for Auto-Body Production(II)-Operation Planning and NC Code Post-Processing)

  • 신동목;이창호;최재진;노상도;이기우
    • 한국정밀공학회지
    • /
    • 제18권1호
    • /
    • pp.63-73
    • /
    • 2001
  • This paper presents a process and operation planning system with an NC code post-processor for effective machining of press dies for production of cars. Based on the machining features, major parts of press dies are categorized into 15 groups and a standard process plan is defined for each group. The standard process plan consists of a series of processes where a process is defined as a group of operations that can be done with one setup. Details such as cutting tools, cutting conditions, and tool paths are decided at the operation planning stage. At the final stage of process and operation planning, the NC code post-processor we developed adjusts feedrates along the tool path to reduce machining time. The adjustment rule is selected based on the metal removal rate estimated by virtually machining with virtual cutting tool.

  • PDF

DSM을 활용한 모듈러 건축 설계단계에서의 제작 및 시공 정보 반영 및 재시공 감소 방안 (Design and Planning Process Management for Reducing Rework in Modular Construction Using Dependency Structure Matrix (DSM))

  • 현호상;이현수;이정훈;박문서
    • 대한건축학회논문집:구조계
    • /
    • 제35권2호
    • /
    • pp.29-36
    • /
    • 2019
  • Modular construction has benefits such as short construction duration and high productivity owing to the production in factory and owing to simultaneous on-site work. However, rework occurs in modular construction and the rework affects the efficiency of modular construction. The almost of causes of rework are exist in design process. To reduce the cause of rework, the information flow of the design process should be managed and the plan to reduce rework should be included. However, the modular construction has complex process because of impeded unit production so it is hard to manage the information flow in design process. Moreover, when the plan to reduce rework is included, the design process will be more complicated. Therefore, the objective of this research is to suggest the design process including the rework reduction plan and to alleviate the complexity of design process by using Dependency Structure Matrix(DSM). By using DSM, the iteration and feedback in design process is reduced and it can be expected that rework in modular project can be reduced by using suggested design process.

농촌공간계획 수립을 위한 농업·농촌 도입 시설에 관한 기초연구 (A Basic Study on the Introduction Facilities of Agriculture and Rural Areas for the Establishment of the Rural Space Plan)

  • 김용균;김상범
    • 농촌계획
    • /
    • 제30권2호
    • /
    • pp.25-34
    • /
    • 2024
  • This study is a basic study for reorganizing the facility system of agriculture and rural areas necessary for establishing a rural spatial plan. Accordingly, the newly implemented rural spatial planning system was briefly reviewed. As the scope of the study, the facility-related laws and the classification and classification system of facilities of previous studies were set as the scope of the study. In order to reorganize the facility system in rural areas necessary for establishing a rural space plan, this study compared and analyzed the facilities according to the laws related to the facilities and the use of previous studies. As a result of analyzing 21 target sites for rural agreements with 12 sectors of service facilities in rural areas as indicators, 14 facilities in 8 sectors were found to be commonly introduced for the establishment of living areas in rural areas or regional development. However, the classification of production space facilities related to agriculture as functional facilities necessary for rural life was insufficient. Accordingly, when considering the specificity of rural areas, it is necessary to classify facilities of living spaces in rural areas and production space of agriculture according to their use.

최소비용(最小費用) 연속생산형(連續生産型) 샘플링검사(檢査)의 탐색(探索) (An Approach to select the lowest cost CSP-1 sampling plan(i, f))

  • 장경;신현재
    • 품질경영학회지
    • /
    • 제11권1호
    • /
    • pp.18-23
    • /
    • 1983
  • Continuous sampling plans CSP-1(i,f)'s with which AOQL is guaranteed, can be applied to the cases in need of effective sampling without stopping the process or dividing batches during production. But the plans that can guarantee the same AOQL value are too many. Therefore we have to select one plan among them. There may be a lot of ways to choose it. This paper connects with various sampling costs, the concept to try to detect the shift of process average under fractional inspection in CSP-1,to find a minimum cost sampling plan among several CSP-1 sampling plan alternatives (i, f)'s with the same AOQL value.

  • PDF

A* 알고리즘을 적용한 금속 그레이팅 생산 공정에서의 절단문제 해결 (Application of A* Algorithm to solve a Cutting Problem in Metal Manufacturing Process)

  • 김진명;조대호
    • 한국시뮬레이션학회논문지
    • /
    • 제14권4호
    • /
    • pp.1-8
    • /
    • 2005
  • In a metal grating manufacturing process, the cutting operation allocates the gratings and cut them out from given panels or a plate sheets. Before the cutting operation an operator generates a cutting plan. The cutting plan should decide how pieces of metal rectangles i.e., gratings, are allocated and cut from the panel. This plan generation is a deal of weight on the production cost. the generation of cutting plan is similar to the general two-dimensional cutting problem. In this paper, we first define cutting problem and Af algorithm of Artificial Intelligence to solve the problem. Also, through a simulation, we compare the proposed cutting algorithm to an existing method in terms of material loss

  • PDF

기업의 경영혁신 전략 적용사례 및 비교분석에 관한 연구 (As strategy of Management Innovation, A Study on Analysis and Comparison Plan of Six Sigma, Lean and Theory of Constraints)

  • 조태연
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2011년도 춘계학술대회
    • /
    • pp.541-552
    • /
    • 2011
  • Many of Korea major companies have appled as strategy of management innovation Six Sigma, Lean and Theory of Constraints. Six Sigma has mainly focused to reduce variation. Lean has mainly focused to reduce wastes and Theory of Constraints has mainly focused that bottleneck of constrains production and sales. This bottleneck is caused by constraint resources and it should be the main role of manager to explore constraint resource. Although their mainly focus are different, they are used to improve productivity and quality. In this paper, as strategy of management innovation, study on analysis and comparison plan of Six Sigma, Lean and Theory of Constraints. From the literature survey and application cases, it is suggested and discussed that how to plan of application as strategy of management innovation successfully. The suggested plan of application could be a good guideline that it could be a apply of companies.

  • PDF

Data Collection Methodology of Activity Production Rates for Contract Time Determination

  • 허영기;김창완;송종철
    • 한국건설관리학회논문집
    • /
    • 제5권1호
    • /
    • pp.114-123
    • /
    • 2004
  • Contract time determination for highway construction projects has never been easy despite considerable research efforts from academia as well as industry. High variations in crew production rates are considered one of the main barriers to accurate contract time determination. This paper presents a methodology for collecting field information on crew production rates which will help to enhance the accuracy of contract time determination for highway bridge construction. Based on a standard data collection tool developed, data on field crew production rates was collected from 14 on going projects in Texas, USA, over the past two years. The production rates based on the data collected were considered by industry practitioners to be more realistic and practical than those available to the current practices. As more data becomes available, key drivers influencing production rates could be identified and provide site personnel with a means to better plan and control production in a project specific context.

슈퍼커패시터 양산화를 위한 하이브리드 복합금형 개발 (Development of Hybrid Composite Die for the Production of the Supercapacitor)

  • 권혁홍
    • 한국기계가공학회지
    • /
    • 제14권1호
    • /
    • pp.105-110
    • /
    • 2015
  • In this study, a high-speed procedure to be used in composite molding technology is developed for the production of a hybrid supercapacitor in a progressive and revolutionary current in a production system, as are the related operating conditions. Mold parts with solid modeling, the ease of programming of future mold product designs, tolerance management, and pre-explode tests by the building of a progressive die design system using Cimatron_E10 Die Design Software for the strip layout are done. The capacity of the super-hybrid composite mold design will save time and money through its verification of the manufacture of molds. We plan to apply this to future related products for production cost savings of more than 30% achieved by considering the components of the production costs, labor, and material costs of production as compared to conventional production methods.