• Title/Summary/Keyword: Production Management Program

Search Result 342, Processing Time 0.029 seconds

Advanced Alignment-Based Scheduling with Varying Production Rates for Horizontal Construction Projects

  • Greg Duffy;Asregedew Woldesenbet;David Hyung Seok Jeong;Garold D. Oberlender
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.403-411
    • /
    • 2013
  • Horizontal construction projects such as oil and gas pipeline projects typically involve repetitive-work activities with the same crew and equipment from one end of the project to the other. Repetitive scheduling also known as linear scheduling is known to have superior schedule management capabilities specifically for such horizontal construction projects. This study discusses on expanding the capabilities of repetitive scheduling to account for the variance in production rates and visual representation by developing an automated alignment based linear scheduling program for applying temporal and spatial changes in production rates. The study outlines a framework to apply changes in productions rates when and where they will occur along the horizontal alignment of the project and illustrates the complexity of construction through the time-location chart through a new linear scheduling model, Linear Scheduling Model with Varying Production Rates (LSMVPR). The program uses empirically derived production rate equations with appropriate variables as an input at the appropriate time and location based on actual 750 mile natural gas liquids pipeline project starting in Wyoming and terminating in the center of Kansas. The study showed that the changes in production rates due to time and location resulted in a close approximation of the actual progress of work as compared to the planned progress and can be modeled for use in predicting future linear construction projects. LSMVPR allows the scheduler to develop schedule durations based on minimal project information. The model also allows the scheduler to analyze the impact of various routes or start dates for construction and the corresponding impact on the schedule. In addition, the graphical format lets the construction team to visualize the obstacles in the project when and where they occur due to a new feature called the Activity Performance Index (API). This index is used to shade the linear scheduling chart by time and location with the variation in color indicating the variance in predicted production rate from the desired production rate.

  • PDF

A Study Development of Production Information System for Real-time of POP (POP(Point of Product)에 의한 실시간 생산정보시스템 구현 연구)

  • 박주식;박진홍;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.1
    • /
    • pp.45-56
    • /
    • 2003
  • This study intend to make easy modification, even if there is a new job or structure change, by modularizing program and computerize and automation of production control management used in CIM. Under the condition where manager control production on the job-site, for increasing connection with other operation and management on the computer by monitoring center computer, Recognizing information by computer is needed, it is possible by converting transaction. So production increase and quality improvement are possible by diminishing manager's and producer's work with the result of the study combining POP and CIM, after that, in e-business and m-business period that every enterprise must pass, customer satisfaction and sales promotion are possible with employee's computerizing minds. These study result also can knowledge process condition with theoretical class and have a power in finding a solution with foundation of theoretical knowledge.

An Area of Accounting Related to the Management Planning (경영계획(經營計劃)에 관련(關聯)되는 회계(會計)의 영역(領域))

  • Park, Dae-Kyu
    • Korean Business Review
    • /
    • v.4
    • /
    • pp.25-50
    • /
    • 1991
  • A management planning is an index to accomplish the goal of business enterprise and a managing guide of the top manager. It is a top manager's authority with he gives directions at the beginning of the budget year and has something to do with a responsible accounting. If we correlate this management planning with an area of accounting, we can subdivide it into followings; production and marketing schedule, demand-supply program of raw material, demand-supply program of the personnel and lobor cost program, facility investment program, balance fund program, profit and loss, and financial position program. I think, in the field of accounting for the sake of the management planning, there are motivation accounting, responsible accounting, divisional system accounting, evaluating accounting and so on. A management planning should be accomplishe and as it is accomplished, a business is going to be grown up and developed. Especially, it must be set up on the ground of the long-term strategies. When the accomplishment through the management planning, which is a social responibility that all the business enterprise are seeking after, is attained, it makes the development of business possible and we cannot dent that it is closely connected with the national economic development.

  • PDF

Analyzing Economic Effectiveness of the Sea Cucumber Seed Releasing Program in Gyeongsangbuk-do Region (경북지역 해삼 종묘방류사업의 경제적 효과 분석)

  • Park, Kyoung-Il;Kim, Young-Jun;Kim, Do-Hoon
    • The Journal of Fisheries Business Administration
    • /
    • v.44 no.1
    • /
    • pp.81-90
    • /
    • 2013
  • This study is aimed to analyze economic effectiveness of the sea cucumber seed releasing program in Gyeongsangbuk-do region. Based on the surveyed data, the production value of released sea cucumber and the seed releasing program cost are estimated and compared to determine the economic validity of the sea cucumber seed releasing program. Results show that the B/C ratio, as an indicator of economic evaluation, is 2.0, indicating that the sea cucumber seed releasing program in Gyeongsangbuk-do region would be economically feasible under the current production and market conditions. Sensitivity analyses of main variables indicate that the economic effectiveness can be increased when the recapture rate would be increased and the seed price of sea cucumber would be decreased.

A Study on the Development and Educational Effect of the Environmental Management Integrated Leader Program (환경경영 통합 리더 프로그램의 개발과 효과에 관한 연구)

  • 정연돈
    • Hwankyungkyoyuk
    • /
    • v.10 no.2
    • /
    • pp.249-268
    • /
    • 1997
  • This Study developed 'Environment Management Integrated Leader(EMIL)' program and evaluated the effect of the Program. The procedure of EMIL program development is as follows; 1) Identifying the training needs Through the interview and discussion with corporate environmental staff and research members, training need are collected. 2) Setting the training objectives 30 objectives are developed through specifying and organizing the training needs. 3) Determining the scopes of the program This program consists of the four scopes. First, the scope of Environmentally Acceptable Management is developed based on ISO 14000 and certification of environmentally friendly business. Second, the scope of Environmentally Acceptable Technology includes air pollution, water pollution, solid wasted management, and pollution prevention. Third, the scope of Integrated Environmental Management focuses on master plan, green marketing, green production, and green accounting. Finally, the scope of Integrated Environmental Concepts focuses on food pollution, environmental activities, and bio-diversity. 4) Selecting the training methods Various methods are used such as off-site visits, exercises, case study, workshop, discussion, role-playing as well as lecture. 5) Implementing the program 49 trainees participated the program for 6weeks. All trainees are working for D. Company Group. 6) Measuring training effects To evaluate the effects of the program, pre-post training evaluation method is used. The results are highly significant at all 4 scopes by the p<.01. This study has some implications in order to establish the environmental management climate. First, the development of new environmental education program for management is necessary. Second, Vast investment are required. Third, more systematic approaches are desired in environmental education. Lastly, more customized program development and implementation to fit in industries will accelerate the expansion of environmental concept.

  • PDF

Development and Working Efficiency of Supporting Program for the Parametric Electrical Outfit Production Design of Offshore Plant Based on PML (PML 기반 파라메트릭 해양플랜트 전장생산설계 지원 프로그램 개발 및 업무 효율성 연구)

  • Kim, Hyun-Cheol;Kim, Jong-Myung
    • Journal of Ocean Engineering and Technology
    • /
    • v.33 no.3
    • /
    • pp.205-213
    • /
    • 2019
  • Recently, because of the global recession of the offshore plant industry and low-cost orders, there has been increasing interest in strengthening the competitiveness of domestic companies for the design and production technologies of offshore plants. However, in the offshore plant design field, the Plant Design Management System (PDMS), which is a 3D CAD program for plant layout developed by AVEVA Marine, is already commonly used as offshore plant design software and widely used in large domestic shipyards and cooperative design companies. Under this background, we have been thinking about ways to design better with the existing software. In this study, we developed a parametric design program to maximize the efficiency and reduce the working time for offshore plant electrical outfit production design based on the Programmable Macro Language (PML) of PDMS. We also examined its performance. By applying the developed program to the offshore plant module selected as an application example, it was confirmed that a 50% improvement in the work efficiency of cable tray design could be obtained compared with the existing method, with work efficiency improvements of 80% or more in other field design work.

A weighted similarity coefficient method for manufacturing cell formation (제조셀 형성을 위한 가중치 유사성계수 방법)

  • 오수철;조규갑
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1995.04a
    • /
    • pp.122-129
    • /
    • 1995
  • This paper presents a similarity coefficient based approach to the problem of machine-part grouping for cellular manufacturing. The method uses relevant production data such as part type, production volume, routing sequence to make machine cells and part families for cell formation. A new similarity coefficient using weighted factors is introduced and an algorithm for formation of machine cells and part families is developed. A comparative study of two similarity coefficients - Gupta and seifoddini's method and proposed method - is conducted. A software program using TURBO C has been developed to verify the implementation.

  • PDF

A Study on the De-collectivization Process of the DPRK's Farm Land System (북한 농지제도의 탈 집단화 방안)

  • Kim, Jai-Hong
    • Korean Journal of Agricultural Science
    • /
    • v.29 no.2
    • /
    • pp.122-134
    • /
    • 2002
  • DPRK have been encountered serious food problems in recent years, because of lack of availabilility of supplies, unfavorable weather conditions and above all lack of production incentives for farmers. Self-management is one of the method of increasing production incentives for farmers. For the well established self-management program, DPRK have to distribute farmland to farmers, not property rights but utilization rights. However farming situations are different, the distribution methods will be different according to the farming situations.

  • PDF

Scheduling with regard to start lag in process group (공정 그룹별 Start lag을 고려한 스케쥴링)

  • 전태준;박성호
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.10a
    • /
    • pp.299-302
    • /
    • 1996
  • The purpose of this study is developing scheduling logic and program for machining scheduling of automobile part production line with unbalanced processing time. Three rules are developed to minimize slack and effect on other job. Fourth rule is suggested which considered weighted sum of three factors. schedule is generated totally 1, 000 times and then optimal weight parameter is selected. The program is developed to schedule situation to compare with the performance measure, total finish time of machine and total tardiness of part. As a result, the rule which considered weighted sum of three factors is effective for both measure.

  • PDF

Software Development for the Construction of Periodic Maintenance System (정기보전체계 구축을 위한 소프트웨어개발)

  • 김재중;김원중
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.35
    • /
    • pp.115-122
    • /
    • 1995
  • This paper is developed with software system for the construction of periodic maintenance. The system includes records of equipment, maintenance work, failure mode analysis and work standards of maintenability, inspection & repair to establish periodic maintenance system. And the software program is designed with user-oriented to analyze maintenance data and maintenance system of periodic interval times. Also machine operator can easily apply maintenance management system in production & manufacturing field. Visual Basic in the environment of Window system is used as computer program language for graphics and data base management in IBM PC.

  • PDF