• Title/Summary/Keyword: Procurement

Search Result 888, Processing Time 0.037 seconds

Proposal for Developed Procurement and Material management System On Using Previous System Analysis in Plant Engineering (플랜트 구매조달 및 자재관리 시스템 개발 요구사항 분석을 통한 개발 방향 제시)

  • Lee, Seung-Hun;Kim, Sun-Kuk;Lee, Jun-Bok;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.204-209
    • /
    • 2006
  • Despite the recent depression of the construction industry, overseas plant market especially Middle East plant market is booming owing to the high oil price. Since many Middle Eastern countries are placing orders of big scale projects based on the high oil price, Korean EPC contractor are trying to get over the depression through theses plants. Presently, since the plant market is in prosperous condition in general, it is not hard to get overseas orders; however the original licenses that requirehigher technology and high added values are exclusive for advanced engineering companies which great difficulty is predicted for developing countries like us to join the crowd. Therefore, the objective of this study is to propose establishment of material management system on the filed to gain optimized effect of material management in connection with procurement system that all the procurement related personals execute tasks in advanced level by systemizing the task operation within the knowledge and task ability in time for plant construction procurement as a method to strengthening the competitiveness of Korean companies.

  • PDF

A Study on the Understanding of Fire Service Officers to the Procurement Circumstances and the Alternatives for Procuring Fire Service Funds (소방재원의 조달여건 및 조달방안에 대한 소방공무원의 인식에 관한 연구)

  • Choi, Nag-Soon;An, Sang-Bong
    • Fire Science and Engineering
    • /
    • v.21 no.2 s.66
    • /
    • pp.87-97
    • /
    • 2007
  • This study is to investigate the problems of procurement circumstance of the current fire service funds and to suggest the alternatives for procuring the fire service funds for dealing with increasing demand on the fire service in the local autonomous era. The results are as the followings. First, most fire service officers see the procurement circumstances as premature stage and perceive the necessity of the improvement of this condition. In particular, the officers at the fire center recognize this problem as an urgent question than the officers at the front fire branches. In addition, as for the alternatives of the procurement of fire service funds, both groups prefer the long term plan to the short term plan, and show positive responses to the National Emergency Management Agency and central government as the entity to raise fire funds. As for the alternatives to improve financial system, both groups show the most positive responses on the way to increase the current common facilities tax. As for the specific procurement alternatives of fire funds, both groups agree the alternative to increase common facilities tax mostly, and to the next they agree the alternative to insecure fire funds by restructuring current financial system and by establishing fire service hospital and fire equipment maintenance center.

Proposal of a Vender Management System in the Procurement Management of Plant Projects (플랜트 구매조달관리를 위한 공급자관리 시스템 개발 방향 제시)

  • Woo, Ji-Youn;Lee, Jun-Bok;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.991-994
    • /
    • 2007
  • Since the year of 2003, the overseas plant market has grown by an average of 6% per year. It is because of the increase of oil-money, economic growth of BRICs, and the result of heavy competition among the countries which demands a great amount of resources for the purpose of resource securing. Such a situation is expected to be continued for a while. The procurement is one of critical functions for successful completion of a plant project. For effective procurement, it is required to manage vendor's information efficiently. But most of the vendor management systems deal with simple general information and performance data about vendors. In this sense, this paper proposes a vendor management system which can be used within a decision-making system. The system uses existing DB and makes the close relationship with the vendors. This paper will also reduce risks and difficulties in the process of selecting the proper vendors and will increase efficiency of procurement process in electronic bidding between companies.

  • PDF

Statistical Approach for the Prediction of Improper Businessman in Defense Procurement

  • Han, Hongkyu;Choi, Seokcheol
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.2
    • /
    • pp.21-30
    • /
    • 2011
  • The contractor management for the effective defense project is essential factor in the modern defense acquisition project. The occurrence of Improper Businessman causes the reason in which defense acquisition project is unable to be reasonably fulfilled and setback to the deployment of defense weapon system. In this paper, we develop a prediction model for the effective defense project by using the Discriminant Analysis, the Logistic Regression & Artificial Neural Network and analyse the core variables that determine the Improper Businessman in many variables. It is expected that our model can be used to improve the project management capability of defense acquisition and contribute to the establishment of efficient procurement procedure through entry of the reliable domestic manufacturer.

A Survey of food procurement practices in hospital dietetics -Assessment of the level of processing for purchased foods- (병원급식의 구매관리 실태조사 -구매 식품의 가공정도 평가를 중심으로-)

  • 신익자;남순란;곽동경
    • Korean journal of food and cookery science
    • /
    • v.4 no.1
    • /
    • pp.65-73
    • /
    • 1988
  • Food procurement practices were assessed in 31 general hospital's dietetics in terms of the level of processing for purchased food. The level of processing before purchase by the institution was noted by a numerical value. a Food Processing Index (FPI). Labor productivity measured in terms of labor minutes per meal served averaged 12.59 minutes. Responsible persons for procurement practices were mostly dietitians, but effective purchasing methods as well as inventory control techniques were not fully systematized. Dietetic directors anticipate the large increase in the use of convenience foods in the future mainly due to the improved labor productivity, and also a highly increasing demand for completely pre-prepared food items (FPI 3). The grand mean of FPI scores for purchased foods in surveyed hospitals was 3.34, which indicates partially pre-prepared to completely pre-prepared food items. Significant negative correlation was found between the grand mean of FPI scores and the number of beds in a hospital.

  • PDF

A Study on the Effect of Quality Certification Incentives on Enterprise Management Performance - focusing on Office Furniture for the Public Procurement Service of Korea (품질인증(品質認證) 인센티브제도의 운영이 기업경영성과(企業經營成果)에 미치는 영향(影響) : 조달청 사무용 가구 중심으로)

  • Kim, Kwang Soo;Kwak, Soon Jin;Chung, Soon Suk
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.1
    • /
    • pp.159-168
    • /
    • 2014
  • This paper study is to identify the effect of quality certification incentives regulations to a firm. The pur purpose of this study is to propose the right way of improvement and policy by conduct research for quality certification incentives regulations, which applied by public procurement service for office furniture. For more accuracy, this study analyze the result of questionnaire, visiting, telephone survey conducted by office furniture manufacturer those are registered in MAS (Multiple Award Schedule System).

Verification of Life-Cycle Cost for the Urban Railway Vehicle (도시철도 차량에서 수명주기비용의 검증)

  • Chung, Kwang-Woo;Jeon, Young-Seok;An, Joon-Yong;Kim, Chul-Su;Chung, Jong-Duk
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.636-642
    • /
    • 2009
  • The application of LCC-techniques is being introduced at the on-going procurement programs of various techniques. LCC-techniques have the common characteristic that all are designed to motivate contractors to design, manufacture and deliver equipment with lower life cycle costs. You may believe that savings may be in the acquisition cost component of life cycle costs. However, primary emphasis is generally on reducing and controlling operating and support costs by transferring more responsibility to the contractor for equipment operating and support cost performance. It has been found that life cycle cost procurement provisions must be individually tailored to each program. In this study, the currently identified LCC procurement techniques including a variety of LCC incentive provisions are introduced. Moreover, verification method, a procedural issue and incentive to application of LCC-techniques are examined.

  • PDF

Discriminant Analysis for the Prediction of Unlawful Company in Defense Procurement (국방조달에서 부정당업자 판별분석 모형 개발)

  • Han, Hong-Kyu;Choi, Seok-Cheol
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.14 no.3
    • /
    • pp.467-473
    • /
    • 2011
  • The contractor management for the effective defense project is essential factor in the modern defense acquisition task. The occurrence of unlawful company causes hastiness for project manager and setback to the deployment of defense weapon system. In this paper, we develop a prediction model for the effective defense project by using the discriminant analysis and analyse the variables that discriminate the unlawful company in many variables. It is expected that our model can be used to improve the project management capability of defense acquisition and contribute to the establishment of efficient procurement procedure through entry of the reliable defense manufacturer.

Reliability Pricing Model system construction (신뢰도기반 가격산정모델 시스템 구축)

  • Lee, Cheon-Ho;Han, Seok-Man;Kim, Jong-Hyuk;Chung, Koo-Hyung;Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.812-813
    • /
    • 2007
  • The procurement of generation and transmission/Distribution capacity in vertically-integrated electric industry is sufficient by facility construction in suitable time. However, the introduction of competitive electricity market increase the efficiency of availability for facilities and fuels. As a result, long-term capacity procurement is required for stable demand-supply balance since it is expected to maintain their generation capacity at a minimum for profit maximization. In this paper, a new long-term capacity procurement mechanism is constructed, which is able to assure supplemental contribution in competitive electricity market.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF