• Title/Summary/Keyword: Process management

Search Result 16,489, Processing Time 0.035 seconds

A case study of safety management assessment application by unit process worker (단위공정 작업자에 대한 안전관리 평가적용 사례연구)

  • Lee, Kang-Bok;Kim, Geon-Ho;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.3
    • /
    • pp.9-14
    • /
    • 2007
  • A studies wish to present safety assessment table that is consisted of safety check-up, safety education, safety management for worker's safety management assessment about unit process. And safety management level was survey through case study that use safety assessment table. Safety management assessment table is improved safety management level of unit process, and is developed safety management system by worker confirms assessment items and improves problem.

Development Process of Systems Engineering Management Plan(SEMP) for Large-Scale Complex System Programs (대형 복합 시스템 개발을 위한 효과적인 시스템공학 관리계획 개발 프로세스)

  • 유일상;박영원
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.4
    • /
    • pp.82-90
    • /
    • 2003
  • The Systems Engineering, as a methodology for engineering and management of today's ever-growing complex system, is a comprehensive and iterative problem-solving process. The process centers on the analysis and management of the stakeholders' needs throughout the entire life-cycle of a system and searches for an optimized system architecture. There are many essential needs and requirements to be met when a system development task is carried out. Systems Engineering Management Plan(SEMP), as a specification for system development process, must be established to satisfy constraints and requirements of stakeholders successfully and to prevent cost overrun and schedule delay. SEMP defines technical management functions and comprehensive plans for managing and controlling the entire system development process, specialty engineering processes, etc. Especially. in the case of a large-scale complex system development program where various disciplinary engineering such as mechanical; electrical; electronics; control; telecommunication; material; civil engineering etc. must be synthesized, it Is essential to develop SEMP to ensure systematic and continuous process improvements for quality and to prevent cost/schedule overruns. This study will enable the process knowledge management on the subject of SEMP as a core systems engineering management effort, that is, definitely defining and continuously managing specification of development process about requirements, functions, and process realization of it using a computer-aided systems engineering software. The paper suggests a systematic SEMP development process and demonstrates a data model and schema for computer-aided systems engineering software, RDD-100, for use in the development and management of SEMP. These are being applied to the systems engineering technology development task for the next-generation high-speed railway systems in progress.

Real Time Process Control System under 100 PPM Management System (100 PPM 관리체제하의 실시간 공정관리 방안)

  • 조남호;신숙현
    • Journal of Korean Society for Quality Management
    • /
    • v.25 no.1
    • /
    • pp.116-134
    • /
    • 1997
  • The present automated manufacturing environment is very different when the classical statistical process control method based on batch processing were used. Therefore these must be replaced by automated statistical process control method. In this point of view, this paper intends to develop the automated statistical process control method which can be implemented in the present automated manufacturing environment. Specially this study developed the rules to identify the special causes of the manufacturing process in the aspect of the 100 PPM management, and a numerical example is demonstrated to verify the usefulness of these rules.

  • PDF

A Study on Process-driven Standardization in Manufacturing Industries (제조업종의 표준 업무프로세스 개발 연구)

  • 김훈태;정한일;한정우;양은찬;임춘성
    • Proceedings of the CALSEC Conference
    • /
    • 2001.08a
    • /
    • pp.277-288
    • /
    • 2001
  • Nowadays, for the competitive power of an enterprise, there are many attempts to implement information system that could support business innovation by business process re-engineering. However, there is no effort to standardize the core business processes of enterprise based on standards of data, documents. These facts make it difficult to introduce and implement enterprise information system designed by business processes of the higher level. Therefore, standardization of business process by analyzing the functionality and relationships among them are important and necessary. The results of our research are summarized as process-driven standardization (standardization of core business processes) and development of a repository. In process-driven standardization, we proposed the reference model by analyzing the business processes of the leading enterprises for core business processes. The reference model focuses on core business processes, such as sales management, procurement management, production management, logistics management, and customer support in manufacturing industry. We developed a knowledge-based system as a repository for a integrated management system of business process. And this repository was built up web-based system for the purpose of both reference and management.

  • PDF

A Study on Evaluation Model of Business Process Management Systems based on Analytical Hierarchy Process (AHP 기반의 비즈니스 프로세스 관리시스템 평가 모형에 관한 연구)

  • Yu, Sung-Yeol
    • Management & Information Systems Review
    • /
    • v.31 no.4
    • /
    • pp.433-444
    • /
    • 2012
  • The purpose of this study is to develop the evaluation model of BPMS(business process management systems) based on AHP(analytical hierarchy process). In this study, we draw some criteria to select BPMS solution from a experts panel. And, we develop an evaluation model based on AHP method. As a result, each organization can select the effective BPMS solution from the proposed evaluation model.

  • PDF

A Study on the Relationship of Process Quality, Outcome Quality, and Management Performance - Combination of Service Quality and BSC Concept for Insurance Industry - (과정품질, 결과품질, 경영성과 연계 연구 - 보험산업의 서비스품질과 BSC 연계모형을 중심으로 -)

  • Kim, Hyung-Wook
    • Journal of Korean Society for Quality Management
    • /
    • v.37 no.4
    • /
    • pp.43-51
    • /
    • 2009
  • This study was designed to analyze the relationship of process quality, result quality and management performance in Korean insurance industry. For this study the linkage scheme of service quality concept is used on PZB model and BSC(Balances Score Card) system. In the linkage model, the 5 service qualitry factors used in PZB model are used as the result quality variables, and internal process factor, learning/growth factor in BSC are used the process quality variables affecting the result quality variables. And also customer satisfation factor and financial performance index are used as the management performance variables. In the ivsurance industry, the process quality variables were verified to meaningfully affect the result quality variables, and the result service quality variables were verified to affect the management performance indices. As the result, the process quality and the service quality must be emhanced for the competitiveness of Korean insurance industry.

Research on Using Six Sigma Tool to Reduce the Core Process Time

  • Chung, Yi-Chan;Yen, Tieh-Min;Hsu, Yau-Wen;Tsai, Chih-Hung;Chen, Ching-Piao
    • International Journal of Quality Innovation
    • /
    • v.9 no.1
    • /
    • pp.94-102
    • /
    • 2008
  • When facing the global severe competition, the enterprises all try their best to upgrade the quality, reduce the costs to reach the goal of customer satisfaction. Motorola was the earliest firm creating the term Six Sigma (6 ${\sigma}$); GE was the enterprise successfully fulfilling Six Sigma. The success of these two firms revealed the prominent effects and became the world-class model enterprises. The main purpose of promoting Six Sigma activity was to reduce the possible defects in the business process to the least through designing and monitoring business process in order to reach the goals such as the best quality and efficiency, the lowest costs, the shortest circular process time, maximum profits and customer satisfaction. This research used the Six Sigma technique to improve the business process of ceramics manufacturing plant and find out the major factors of slower core task time by the analytical process of Process Mapping, Pareto Chart, Simu18 simulation software and figures and proposed the improvement measures. Through the confirmation of the case companies, it successfully reduced the core process time and the organizational costs and increased the capacity.

A Study on Factory Building Fire Risk Reduction Management (공장건물의 화재리스크 경감방안에 관한 연구)

  • Chung, Eui-Soo;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.3
    • /
    • pp.43-53
    • /
    • 2008
  • This study is carried out for the fire safety of the factory building, the fire risk reduction measure in compliance with an example approached in fire risk reduction systematically, contribute to reduce the fire risk. The analytical fire risk process of discovering, identifying, estimating and evaluating risk and control measure as risk reduction measures are core concept, applies loss prevention with loss control techniques. The painting process in the workplace where the fire hazard and death accident accompanies coexists. Loss prevention problem of creation prevention of dangerous atmosphere at workplace is health and human services problem of normal circumstances, must be inspected with problem of combustible gases at the time of fire explosion. Static electricity measure accomplished the risk control process thoroughly as the fire risk reduction process model with the ignition sources measure which is presented. Fire risk from within organizing will be able to classify with each field by detailedly but risk treatment process will be able to apply basically all the same concept. Consequently about risk management example from before, this study is proposed risk management techniques that standardized rightly in the actual condition of organization with one plan, with discovery of fire risk, the feedback process in compliance with a fire risk reduction and the review which control the result is joint responsibility of engineer, technical expert and manager as part of safety management to practice with the fact must be supervised.

Algorithmic Framework for Business Process Innovation

  • Han Hyun-Soo
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.1142-1149
    • /
    • 2003
  • Various organizational factors effect successful implementation of IT enabled business transformation. Among them, the most critical success factor is deemed to overcoming change management problem. Lots of studies have been made on Implementation methodologies and business process formalizations to encourage organizational members to accept new business process changes. However, the logic or process redesign still depends on qualitative problem solving techniques mostly depending on basically human intuition such as brainstorming. cause-and-effect analysis. and so on. In this paper, we focused on developing analytic framework to design to-be business process structure. which can complement qualitative problem solving procedures. With effective use of IT as an enabler, we provide algorithmic framework applicable to designing various business process changes such as process automation, business process resequencing, and more radical process integration. The framework follows dynamic programming approach in the literature, which is based on the decision making paradigm of organizations to abstract business processes as quantitative decision models. As such, our research ran fill the gap of limited development of theory based analytic methodologies for business process design, by providing objective rationale to reach the consensus among the organizational members including senior management.

  • PDF

Design of Architecture for Collaborative Project Management System based on Business Process (프로세스 기반의 협업 프로젝트 관리 시스템 구조 설계)

  • Baek, Jae-Yong;Jung, So-Young;Kim, Bo-Hyun;Yoo, Seock-Kyu;Lee, Seok-Woo;Choi, Hon-Zong
    • Korean Journal of Computational Design and Engineering
    • /
    • v.14 no.5
    • /
    • pp.338-345
    • /
    • 2009
  • c-PMS(collaborative project management system) is a business process(BP) based tool to manage collaborative projects which accomplish common business objectives determined by mutual agreement of companies using limited resources and time. This study analyzes collaborative BP, collaborative projects, and their relation, and proposes the architecture and operation scenario of c-PMS consisted of business process asset management(BPAM) sub-system and project manage(PM) sub-system. BPAM sub-system models private and public BP using a client/server based modeler, defines collaborative BPs process from public BPs, and manages them as companies' asset on a web portal. PM sub-system globally manages collaborative project using planning, execution, monitoring, and analyzing functions.