• 제목/요약/키워드: Process Priority

검색결과 1,304건 처리시간 0.023초

Priority Based Interface Selection for Overlaying Heterogeneous Networks

  • Chowdhury, Mostafa Zaman;Jang, Yeong-Min
    • 한국통신학회논문지
    • /
    • 제35권7B호
    • /
    • pp.1009-1017
    • /
    • 2010
  • Offering of different attractive opportunities by different wireless technologies trends the convergence of heterogeneous networks for the future wireless communication system. To make a seamless handover among the heterogeneous networks, the optimization of the power consumption, and optimal selection of interface are the challenging issues. The access of multi interfaces simultaneously reduces the handover latency and data loss in heterogeneous handover. The mobile node (MN) maintains one interface connection while other interface is used for handover process. However, it causes much battery power consumption. In this paper we propose an efficient interface selection scheme including interface selection algorithms, interface selection procedures considering battery power consumption and user mobility with other existing parameters for overlaying networks. We also propose a priority based network selection scheme according to the service types. MN‘s battery power level, provision of QoS/QoE and our proposed priority parameters are considered as more important parameters for our interface selection algorithm. The performances of the proposed scheme are verified using numerical analysis.

그린에너지기술 사업화를 위한 우선순위 평가 (An Evaluation of Priority for the Green Energy Technologies Business)

  • 이덕기;홍종철;박수억;백금희
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2011년도 춘계학술대회 초록집
    • /
    • pp.135.2-135.2
    • /
    • 2011
  • The goal of this study is the derivation of priority for business in the areas of green energy technologies. In this paper, we calculated the importance weights of impact factors using the AHP (Analytic Hierarchy Process) method in order to derivation of priority to the green energy technologies business. AHP is a useful method for evaluating multi-criteria decision making problems. To apply the AHP method, specialists for the assessment have been identified by using the concept of 'plan, do, see' and the decision-making hierarchy was established. We selected 5 criteria and 16 sub-criteria for impact factors by brainstorming. According to the result in this study, the most important impact factor is the possibility of commercialization, the second is the possibility of developing the fundamental technology, and the third is the possibility of convergence technology.

  • PDF

AHP 기법을 통한 군용차량 개발시 운용자 요구사항 우선순위 설정 연구 (A Study on the Priority of Users' Requirements for the Development of Military Vehicles by Analytic Hierarchy Process)

  • 이범구;신용철;유황빈;조용건
    • 대한산업공학회지
    • /
    • 제36권2호
    • /
    • pp.117-124
    • /
    • 2010
  • The military vehicles are an inevitable resource that is indispensible to successfully perform modern wars. Military vehicles used in the Korean Army are the copycats of American out-dated military vehicles, but limited to fulfill the specific requirements by the operators. Korean army are nowadays trying to launch a new developmental plan for military vehicles of new concepts by the Korean Army. This article, hence, extracts the necessary factors upon the advancement of military vehicles by the expertises with the operation of military vehicles as well as sufficient experiences about maintenance. Suggesting and setting up the priority, the result makes practical application for the decision of the development of military vehicles.

연구개발사업 우선순위 설정에 있어서 다속성효용이론(MAUT)과 계층분석과정(AHP)의 비교 (A Comparitive Study of MAUT and AHP in Priority Setting of R&B Projects)

  • 박주형;김정흠
    • 기술혁신학회지
    • /
    • 제2권2호
    • /
    • pp.201-218
    • /
    • 1999
  • The article contains an introduction of possibility of applying Multi-Attribute Utility Theory(MAUT) for priority setting of R&D projects. MAUT is compared with AHP, which is widely used recently. These two techuiques are applied to set priorities of R&D projects In a Government-funded Research Institute. Six criteria are chosen from consultation with decision makers. They are composed of 1) validity as representative projects, 2) possibility of resource mobilization, 3) spillover effect of developed technologies, 4) possibility of success, 5) scope of participation and 6) clarity of research goal. To set priorities of R&D projects, SMART(Simple MultiAttribute Rating Technique) and DVM(Difference Value Measurement) out of many MAUT methods are used to design the utility function and to determine the weights among criteria. The aggregation model is additive on the assumption the criteria are independent. AHP executes pairwise comparisons for criteria and alternatives. From the results of the case study, the results and theoretical characteristics are compared.

  • PDF

시스템적 접근에 의한 자동화컨테이너터미널 개발 과제 도출 (Finding Subjects for Automated Container Terminal Development by Systems Approach)

  • 박창호;노홍승;정희균
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 1998년도 추계학술대회논문집:21세기에 대비한 지능형 통합항만관리
    • /
    • pp.51-58
    • /
    • 1998
  • This study is to define the Automated Container Terminal(ACT) and container terminal system. Also, we analyze the present condition of the container terminal system in Pusan port and its automation level by systems approach. And this paper aims at evaluating on the priority of R&D investment until the beginning of the second stage of New Pusan Port Project(2006). In this process we have considered 8 factors (cost, labor, area, time volume, reliability, safety, convenience) to analyze 6 subsystems. The priority order of R&D until target year by sub-systems is as follow : Cargo Handling System〉Transfer System〉Port Entry System〉Storage System(Distribution&Manufacturing System included)〉Inland Transport System〉Port Information System.

  • PDF

기술대체안의 우선순위 설정을 위한 개량 AHP모형의 개발 (Development of a Methodology for Setting Priority of Technology Alternatives)

  • Gwon, Cheol-Shin;Cho, Keun-Tae
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2000년도 춘계공동학술대회 논문집
    • /
    • pp.122-125
    • /
    • 2000
  • The Analytic Hierarchy Process (AHP), a decision making model, which is more applicable than other methods to R&D project selection, particularly when it is applied to intangibles. The objective of this paper is to develop an extended model of the AHP which Is linked to Cross Impact Analysis to assist in the ranking of a large number of technological alternatives. In this study, we developed a priority setting algorithm which considers the cross-impact of the future technology alternatives and thus developed an integrated cross-impact hierarchical decision-making model, which sets the priority by considering technological forecasting and technology dependency

  • PDF

분산 제어 시스템에서의 태스크와 메시지 기반 스케줄링을 이용한 최적 주기와 우선순위 할당 (Optimal Period and Priority Assignment Using Task & Message-Based Scheduling in Distributed Control Systems)

  • 김형육;이철민;박홍성
    • 제어로봇시스템학회논문지
    • /
    • 제8권6호
    • /
    • pp.506-513
    • /
    • 2002
  • Distributed control systems(DCS) using fieldbus such as CAN have been applied to process systems but it is very difficult to design the DCS while guaranteeing the given end-to-end constraints such as precedence constraints, time constraints, and periods and priorities of tasks and messages. This paper presents a scheduling method to guarantee the given end-to-end constraints. The presented scheduling method is the integrated one considering both tasks executed in each node and messages transmitted via the network and is designed to be applied to a general DCS that has multiple loops with several types of constraints, where each loop consists of sensor nodes with multiple sensors, actuator nodes with multiple actuators and controller nodes with multiple tasks. An assignment method of the optimal period of each loop and a heuristic assignment rule of each message's priority are proposed and the integrated scheduling method is developed based on them.

컨테이너 피더항만개발 우선순위 결정에 관한 연구 (A Study on Deciding a Container Feeder Port Development Priority)

  • 백인흠;하창승
    • 수산해양교육연구
    • /
    • 제18권2호
    • /
    • pp.172-182
    • /
    • 2006
  • The aims of this study is to suggest how the port specialists think the priority of container feeder port development in Korea. To illustrate the ideas regarding a container feeder port development, 56 detailed attributes were identified both from the previous studies and from brainstorming port professionals. And these were grouped into 5 criteria by 'KJ method' and made into 4 levels hierarchy structure. AHP technique identifies the relative weights of each levels and trends of the preference of port specialists from 6 alternatives. As a result, a feeder port development priority in Korea has been proposed.

PERFORMANCE ANALYSIS OF TWO FINITE BUFFERS QUEUEING SYSTEM WITH PRIORITY SCHEDULING DEPENDENT UPON QUEUE LENGTH

  • Choi Doo-Il
    • Journal of applied mathematics & informatics
    • /
    • 제22권1_2호
    • /
    • pp.523-533
    • /
    • 2006
  • We analyze two finite buffers queueing system with priority scheduling dependent upon queue length. Customers are classified into two types ( type-l and type-2 ) according to their characteristics. Here, the customers can be considered as traffics such as voice and data in telecommunication networks. In order to support customers with characteristics of burstiness and time-correlation between interarrival, the arrival of the type-2 customer is assumed to be an Markov- modulated Poisson process(MMPP). The service order of customers in each buffer is determined by the queue length of two buffers. Methods of embedded Markov chain and supplementary variable give us information for queue length of two buffers. Finally, performance measures such as loss and mean delay are derived.

계층적 분석기법(AHP)을 이용한 스마트워크 활성화를 위한 정보보호 준수사항 우선순위에 관한 연구 (An Study of Information Security Observance Priority for Smartwork Activation using AHP(Analytic Hierarch Process))

  • 임정길;김상철;이현욱
    • 한국IT서비스학회지
    • /
    • 제12권2호
    • /
    • pp.291-300
    • /
    • 2013
  • In this study, divide by a private enterprise and army, 2 organizations about observed priority item among administrator, service provider, user viewpoint about the information security item for smartwork activation and in 3 steps hierarchic according to AHP technique analyzed and decided priority for information security observance item. As a result, importance difference could confirm identified by administrator, service provider, user viewpoint period of about information security observance item recognizing in a private enterprise and army.