• 제목/요약/키워드: Process Priority

검색결과 1,295건 처리시간 0.03초

계층 분석법을 적용한 부산시 건강도시 사업의 우선순위 설정 (Priority Setting for the Healthy City Program in Busan Using the Analytic Hierarchy Process)

  • 윤태호;최민혁;정규석;김윤희;김건엽;정백근
    • 보건교육건강증진학회지
    • /
    • 제28권3호
    • /
    • pp.31-42
    • /
    • 2011
  • Objectives: Busan had the highest mortality and the shortest life expectancy at birth among 16 provinces in Korea in 2008 and there were considerable health inequalities within the region. This study was performed to build up a priority setting framework in Healthy City Busan project. Methods: Analytic hierarchy process was used to determine the relative priority weight for different strategic and program dimensions along with the consistency of response. An on-site workshop-based meeting (calculating importance) and online survey (calculating risk) were conducted to obtain data from 8 experts. Results: The results showed that in strategic criteria "active health promotion & diseases prevention" and "building infrastructure for the Health City project" were two most important factors. In program criteria, considering both importance and risk scores, "making a healthy community" and "building community health centers" in disadvantaged areas were a top priority group. In addition, "enacting an ordinance for the Healthy City", "building the infrastructure for health impact assessment" and "making health care safety net for vulnerable population" were also higher priorities group. Conclusions: Our findings suggest that the Healthy City project in Busan should be focused on strengthening health equity and building infrastructure for sustainability of the project.

계층분석법(AHP)과 GIS를 이용한 고양시 일대의 지하수오염 관리우선순위 평가 (Priority Assessment for Groundwater Contamination Management Using Analytic Hierarchy Process (AHP) and GIS Approach)

  • 이명진;현윤정;김영주;황상일
    • 한국지하수토양환경학회지:지하수토양환경
    • /
    • 제18권5호
    • /
    • pp.26-38
    • /
    • 2013
  • In this study, priority for groundwater contamination management was assessed based on regional vulnerability in Goyang-si area, Gyonggi-do, Korea using analytic hierarchy process (AHP) and geographic information system (GIS). We proposed a concept for regional vulnerability to groundwater contamination with using socio-environmental vulnerability factors, which can be classified into three properties including regional hydrogeological property, contamination property, and groundwater use property. This concept is applied to Goyang-si area. For AHP analysis, an expertise-targeted survey was conducted. Based on the survey, a total of 10 factors (criteria) and corresponding weights for regional vulnerability assessment were determined. The result shows that regional contamination property is the most weighted factor among the three property groups (hydrogeological property: contamination property: groundwater use property = 0.3: 0.4: 0.3). Then, database layers for those factors were constructed, and regional vulnerability to groundwater contamination was assessed by weighted superposition using GIS. Results show that estimated regional vulnerability score is ranged from 22.7 to 94.5. Central and western areas of Goyang-si which have groundwater tables at shallow depths and are mainly occupied by industrial and residential areas are estimated to be relatively highly vulnerable to groundwater contamination. Based on assessed regional vulnerability, we classified areas into 4 categories. Category 1 areas, which are ranked at the top 25% of vulnerability score, take about 2.8% area in Goyang-si and give a high priority for groundwater contamination management. The results can provide useful information when the groundwater management authority decide which areas should be inspected with a high priority for efficient contamination management.

철도건설 투자우선순위에 관한 연구 (A Study on Criteria for investment Priority of Railway Project)

  • 박일하;박용걸;김시곤
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.112-116
    • /
    • 2008
  • Determining the investment priority of the railway project is essential to keep its object of railway investment. [National railway construction plan] provide 4 major evaluation indicators and their weighting range in determining the investment priority of railway construction. Which are investment efficiency, inter-regional balance of development, network effects, government supporting policy. However this present criteria has inconsistency in determining economical feasibility of the railway transportation when applying the same evaluation indicator, investment efficiency, with the road transportation. The railway transportation is superior to road transportation in terms of transportation capacity and distance, while offering less carbon emissions. In spite of the prominent position of the railway transportation, it can be failed to obtain its proper investment priority when being determined under economical feasibility based. Therefore, this study analyzed the inconsistency under present evaluation criteria and proposed new evaluation method for the investment priority of the railway construction using AHP(analytic hierarchy process), while differentiate from the road construction. This method is optimized for only determining the priority of the railway construction itself under object of railway investment respectively.

  • PDF

우선순위제어기능을 가진 ATM스위치의 성능 분석 (Performance Analysis of ATM Switch with Priority Control Mechanisms)

  • 장재신;신병철;박권철
    • 한국통신학회논문지
    • /
    • 제18권8호
    • /
    • pp.1190-1200
    • /
    • 1993
  • 본 연구에서는 입력이 시간 지연에 민감한 트래픽과 손실에 민감한 트래픽으로 이루어진 경우의 우선순위제어기능을 가진 출력버퍼형의 ATM 스위치의 성능을 분석하였다. 손실우선순위제어 메카니즘으로는 부분 버퍼공유 방법을 택했고, 시간우선순위제어 메카니즘으로는 HOL(Head Of Line)우선순위 제어메카니즘을 택했다. 손실에 민감한 트래괵은 포아송 프로세스로 모델링하였고 시간 지연에 민간한 트래픽은 MMPP로 모델링하였다. 손실우선순위제어에서는 손실우선순위제어 메카니즘을 사용할때 손실에 민간한 트래픽의 셀손실률이 감소함을 확인하였고, 시간우선순위제어에서는 HOL 우선순위제어 메카니즘을 사용할때 시간 지연에 민감한 트래픽의 평균 시간지연이 간소함도 확인하였다. 이 결과로부터 시간우선순위제어와 손실우선순위제어를 동시에 사용하면 시간 지연에 민감한 트래괵과 손실에 민감한 트래픽의 서비스질을 동시에 만족하게 할 수가 있다는 것을 확인하였다.

  • PDF

장비가용능력에 의존적인 공정시간을 가지는 조립주문생산에서의 우선순위 규칙 (Dispatching rules for assembly job shops with process times relying on machine capacity)

  • 김봉혁;나동길;길국호;김동원
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회/대한산업공학회 2005년도 춘계공동학술대회 발표논문
    • /
    • pp.517-522
    • /
    • 2005
  • This paper addresses scheduling heuristics for an assembly job-shop that includes at least an assembly process throughout its processes. The assembly job shop has certain characteristics not only considering the precedence relationship between the processes but also considering the processing progress between the parts. In addition, it probably presents a different processing time for the same product according to the order of processes and the point of workable time, due to the difference in the availability of equipments. The paper proposes several priority-based dispatching rules that consider these characteristics of the assembly job-shop, aiming to minimize the total tardiness of products in the shop floor. Computational tests showed that job due date based priority rules significantly outperform existing priority rules in terms of total tardiness.

  • PDF

상호영향형 SAT의 우선순위선정 알고리즘의 설계 (Design of a Priority Setting Algorithm in the CI-SAT)

  • 권철신;강일중
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2001년도 추계학술대회 논문집
    • /
    • pp.242-245
    • /
    • 2001
  • This study is aimed to design a priority setting algorithm necessary for evaluating and selecting interdependent R&D planning system alternatives. In case that the relationship of technology alternatives is interdependent, a relative importance as occurrence or nonoccurrence of the technology alternatives viewed from the future time varies. So, we are subject to design the evaluation process considering a cross- impact of future technology alternatives. Thus, we apply the cross impact analysis (CIA) model to consider the cross-impact among interdependent system alternatives. Also, the analytic hierarchy process(AHP) model is applied to determine the priority of alternatives by taking the pair-wise comparison among factors.

  • PDF

Fuzzy AHP를 적용한 클라우드 컴퓨팅 환경에서 보안 속성의 상대적 중요도 평가 (Relative priority evaluation of security attributes in cloud computing using fuzzy AHP)

  • 최철림;송영재
    • 한국항행학회논문지
    • /
    • 제15권6호
    • /
    • pp.1098-1103
    • /
    • 2011
  • 클라우드 컴퓨팅의 장점에도 불구하고 보안성에 대한 문제들이 많은 사용자들의 선택에 장애가 되고 있다. 본 논문에서는 클라우드 컴퓨팅의 보안성에 대한 ISO 7498-2 표준의 관련 속성들이 전체 보안 품질에 미치는 상대적 영향도를 평가하였다. 많은 요인들의 영향도를 객관적으로 평가하기 위하여 Fuzzy AHP(Analytic hierarchical process)를 적용하였다. 본 연구는 클라우드 컴퓨팅 서비스의 보안 관련 각 속성들의 상대적 중요성을 구체적으로 수치화 할 수 있었고, 클라우드 컴퓨팅 서비스의 효율적인 선택 및 개발에 필요한 관리 방법을 제시할 수 있었다.

A Two-Step Job Scheduling Algorithm Based on Priority for Cloud Computing

  • Kim, Jeongwon
    • Journal of information and communication convergence engineering
    • /
    • 제11권4호
    • /
    • pp.235-240
    • /
    • 2013
  • Cloud systems are popular computing environment because they can provide easy access to computing resources for users as well as efficient use of resources for companies. The resources of cloud computing are heterogeneous and jobs have various characteristics. One such issue is effective job scheduling. Scheduling in the cloud system may be defined as a multiple criteria decision model. To address this issue, this paper proposes a priority-based two-step job scheduling algorithm. On the first level, jobs are classified based on preference. Resources are dedicated to a job if a deadline failure would cause severe results or critical business losses. In case of only minor discomfort or slight functional impairment, the job is scheduled using a best effort approach. On the second level, jobs are allocated to adequate resources through their priorities that are calculated by the analytic hierarchic process model. We then analyze the proposed algorithm and make a scheduling example to confirm its efficiency.

효율적인 비상대응을 위한 Process High Alarm의 Priority 분석 (The Research of Process High Alarm Priority Analysis for Efficient Emergency Response)

  • 김영세;조규선;전진우;김병직;이준원;박교식
    • Korean Chemical Engineering Research
    • /
    • 제58권4호
    • /
    • pp.604-609
    • /
    • 2020
  • 본 연구에서는 국내 석유화학산업에 설치 운영 중인 DCS (Distributed Control System)에 설정되어 실제 운전에 적용하고 있는 PV high trip point에 설정된 alarm의 우선순위를 ISA 18.2 국제규격 또는 EEMUA 191 guideline 에서 제시하고 있는 기준과 비교 분석하여 현재 사용 중인 공정 alarm의 우선순위 관리상태를 확인하는 것이 목적이다. 공정 문제 발생 시 과도하게 설정된 high alarm이 짧은 시간 안에 운전자에게 제공되어 최우선으로 처리해야 할 alarm을 분별하기 어려워지는 상황이 발생하게 된다. 이로 인하여 운전자가 정해진 시간 안에 적절한 조치를 진행하지 못할 가능성이 커지고 예상하지 못한 공정의 shutdown이나 공정사고로 이어지는 사례가 다수 보고되었다. 그리하여 본연구에서는 alarm 관리에 관련된 국제규격을 소개하고 국내 석유화학산업 현장에 사용하고 있는 alarm 관리 수준을 확인하여 향후 국가 산단의 석유화학 공정에 발생할 수 있는 잠재적 위험을 알리고 위험 요소를 감소시킬 방안을 제시하고자 한다.

정책사업 신뢰성과 타당성 향상을 위한 우선순위 의사결정모형 (- A Study on the Priority Evaluation Model to Improve the Reliability & Feasibility of Public Projects -)

  • 서장훈;장현수;박명규
    • 대한안전경영과학회지
    • /
    • 제6권4호
    • /
    • pp.107-122
    • /
    • 2004
  • This study aims to examine the usefulness on the Evaluation Process for the Feasibility & Priority of A Certain Public Projects. and the Methodology used AHP(Analytic Hierarchy Process) which used pairwise comparisons of the alternatives and criteria for solving discrete alternative multicriteria decision problems. In this paper, we present a similar phenomenon, rank reversal problem, when we apply the AHP to group decision making process. The problem is identified by an example problem in that the previous rank order of Public Projects choices. we also present three different methods to prevent the undesirable characteristic of the original AHP in appling to Decision Making Process.