• Title/Summary/Keyword: Process Plan Selection

Search Result 196, Processing Time 0.026 seconds

A STUDY ON THE PROCESS OF LARGE-SCALE REPAIR OF A CONDOMINIUM

  • Seki, Eiji;Akiyama, Tetukazu
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2002.11a
    • /
    • pp.295-300
    • /
    • 2002
  • Since the contents of large-scale repair of a condominium were various, a plan document was not prepared. The owners association of the condominium has given priority to decision-making of price priority over quality. Examination is not performed about the contents of the construction supervision business, which checks whether suitable construction is performed, either. On the other hand, the know-how for builders, such as decision of the process plan under which the repair work lessens influence to the safety and life as much as possible since the place where the resident is living turns into a construction site, and selection of a method of construction, is just going to ask. It is an important subject how the structure of the construction contractor selection, which considered quality, is built. Then, this research focuses on large-scale repair construction of the condominium, and arranges the actual condition of a series of processes from plan document creation to construction supervision. The method of research collects the construction documents of the condominium that carried out Barge-scale repair construction. Next, collection arrangement of the data of construction builder selection is carried out. The method of the construction builder selection of those other than a construction price is examined. The method of quality control of large-scale repair construction is examined.

  • PDF

A Semigenerative Process Planning System for Rotational Parts (회전형상제품의 가공을 위한 컴퓨터 지원 공정계획 시스템)

  • Rhee, Jin-Soo;Choi, Hoo-Gon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.19 no.4
    • /
    • pp.49-70
    • /
    • 1993
  • The purpose of this study was to develop a semigenerative process planning system for the turning processes required for rotational parts. The system developed in this study showed three major roles for a given part : selection of appropriate turning processes, scheduling of selected processes, and selection of appropriate tools to be used for selected processes. Four information files and six modules were developed to produce a process plan. When geometric features, dimension, tolerance, material types, and surface finish data are inputted to the system, optimal processes, processing sequences, selected tools, and machining costs are to be produced as a process plan.

  • PDF

A Study on the Application of GIS and AHP for the Optimization of Route Selection

  • Lee, Hyung-Seok;Yun, Hee-Cheon;Kang, Joon-Mook
    • Korean Journal of Geomatics
    • /
    • v.1 no.1
    • /
    • pp.95-101
    • /
    • 2001
  • In a route plan, the route selection is a complicated problem to consider the spatial distribution and influence through overall related data and objective analysis on the social, economic and technical condition. The developed system in this study was compared and estimated by deciding a practical section for its validity and efficiency. Using Geographic Information System (GIS), the various information required for route selections in database was constructed, the characteristics of subject area by executing three-dimensional terrain analysis was grasped effectively, and the control point through buffering, overlay and location operation was extracted. An optimum route was selected by calculating the sum of alternatives to the sub-criteria weight, and from this result, there is a difference between real route and proposed route according to the prioritization of decision criteria based on the importance. This research could be constructed and applied geospatial information to the reasonable route plan and an optimum route selection efficiently using GIS. Therefore, the applications are presented by applying Analytic Hierarchy Process (AHP) to the decision-making of information needed in route selection.

  • PDF

Development of Certification Plan for the Type Certification of KPP Aircraft (KPP 형식증명 인증계획 수립)

  • Kim, Youngtae;Kim, Deahee;Hwang, Sungmin;Kim, Sungjin;Yoon, Heekeon
    • Journal of Aerospace System Engineering
    • /
    • v.3 no.1
    • /
    • pp.30-35
    • /
    • 2009
  • This study is on the establishment process of Certification Plan of KPP small aircraft development, domestic BASA(Bilateral Aviation Safety Agreement) shadow certification project. For the development of certification plan incorporations process understanding applicable regulations, selection of certification basis, definition of means of compliance and establishment of compliance checklist. On the basis of this process, we develop type certification procedure suitable for domestic small aircraft.

  • PDF

Selection of the Optimal Building Skin-System in Remodeling Projects (그린 리모델링을 위한, 적정 외피시스템 선정에 관한 연구)

  • Shin, Young-Su;Cho, Kyu-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.296-297
    • /
    • 2014
  • United Nations Framework Convention on Climate Change(UNFCCC), an international treaty to prevent the regulation and global warming, has passed through the General Assembly for 17 times from 1992 to 2011. To create a performance plan specific, such as the Kyoto Protocol, it is to promote the reduction of energy consumption and greenhouse gases worldwide. In South Korea, Korea Infrastructure Safety and Technology Corporation(KISTEC) is working and supporting for developing method of green remodeling policy. Among several solutions, "Remodeling" ensures to increase the energy efficiency of buildings and to reduce the emissions of greenhouse gases, and consequently it could maintain buildings high efficiency. For remodeling projects, it is most important to determine construction plan including remodeling scopes and methods, while the plan has been determined by the engineer's background and experience. Therefore, this study aims at developing a method for selecting optimal skin system which has remarkable influence to energy performance of the buildings.

  • PDF

Reliable monitoring of embankment dams with optimal selection of geotechnical instruments

  • Masoumi, Isa;Ahangari, Kaveh;Noorzad, Ali
    • Structural Monitoring and Maintenance
    • /
    • v.4 no.1
    • /
    • pp.85-105
    • /
    • 2017
  • Monitoring is the most important part of the construction and operation of the embankment dams. Applied instruments in these dams should be determined based on dam requirements and specifications. Instruments selection considered as one of the most important steps of monitoring plan. Competent instruments selection for dams is very important, as inappropriate selection causes irreparable loss in critical condition. Lack of a systematic method for determining instruments has been considered as a problem for creating an efficient selection. Nowadays, decision making methods have been used widely in different sciences for optimal determination and selection. In this study, the Multi-Attribute Decision Making is applied by considering 9 criteria and categorisation of 8 groups of geotechnical instruments. Therefore, the Analytic Hierarchy Process and Multi-Criteria Optimisation and Compromise Solution methods are employed in order to determine the attributes' importance weights and to prioritise of instruments for embankment dams, respectively. This framework was applied for a rock fill with clay core dam. The results indicated that group decision making optimizes the selection and prioritisation of monitoring instruments for embankment dams, and selected instruments are reliable based on the dam specifications.

LIFT CYCLE PREDICTION METHOD FOR THE SELECTION OF LIFT EQUIPMENT IN SUPER TALL BUILDING CONSTRUCTION

  • Seo-kyung Won;Choong-hee Han;Junbok Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.153-160
    • /
    • 2009
  • The demand for super tall building construction is increasing worldwide. There has been a constant request for achieving early payback on investment by shortening the construction time. This pertains especially for the case of huge investment projects such as super tall building construction. It is very important to shorten the construction time for the building framework, which requires substantial construction time and cost, and this is directly related to the establishment of an optimum lift plan for construction. When there is a problem in the selection of the lift equipment, it is almost impossible to revise the selection, resulting in a possible failure of the project. Thus, the purpose of this study is to analyze the function and logic for the development of the process for the selection of lift equipment for super tall building projects and further development of making the analyzed process into a system. In line with this research objective, the process of selecting the optimum lift equipment by domestic construction company was investigated and analyzed as well as collecting the actual field data. The actual data were obtained by sensors installed on tower cranes at three construction sites with the help from the construction company.

  • PDF

A feature data model in milling process planning (밀링 공정설계의 특징형상 데이터 모델)

  • Lee, Choong-Soo;Rho, Hyung-Min
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.21 no.2
    • /
    • pp.209-216
    • /
    • 1997
  • A feature is well known as a medium to integrate CAD, CAPP and CAM systems. For a part drawing including both simple geometry and compound geometry, a process plan such as the selection of process, machine tool, cutting tool etc. normally needs simple geometry data and non-geometry data of the feature as the input. However, a extended process plan such as the generation of process sequence, operation sequence, jig & fixture, NC program etc. necessarily needs the compound geometry data as well as the simple geometry data and non-geometry data. In this paper, we propose a feature data model according to the result of analyzing necessary data, including the compound geometry data, the simple geometry data and the non-geometry data. Also, an example of the feature data model in milling process planning is described.

Basic Research on Mid-to-Long-term Management Plan of Purchased Land by Evaluating Ecological Function of Waterfront Area of Geum River (금강수계 수변구역의 생태 기능 평가를 통한 매수토지 중장기 관리 방안 기초 연구)

  • Seo, Jung-young
    • Journal of Environmental Science International
    • /
    • v.28 no.3
    • /
    • pp.371-384
    • /
    • 2019
  • The purpose of this study was to propose an efficient management plan for purchased land considering the hydrological, watershed characteristics and ecological functions of the target land and surrounding area based on the result of monitoring the water quality improvement effect obtained by purchasing the land in the watershed area in the Geum river system. For this purpose, this study investigated through literature review, and examined ways to apply them to this research by deriving implications from a comprehensive analysis of previous research cases. After that, the components of assessment were derived to evaluate the ecological function of the purchase land, and the ecological function evaluation model for each land and area was proposed. In order to select purchase and restoration priorities of the land, this study analyzed the ecological status of the purchased land in main watersheds and tributaries using Arc GIS ver 10.1. Through this, a process to select restoration priorities was developed. And this study constructed the integrated management process with proposing a mid - to long - term plan by integrating the purchased land valuation and restoration priority selection process. Based on this process, this study suggested an effective management plan for purchased land through the integrated ecological management system of lands purchased. It can be used systematically in appraisal valuation, land purchase system, restoration project, and follow-up management of land purchase.