• Title/Summary/Keyword: Process Plan Selection

Search Result 196, Processing Time 0.03 seconds

A study on process-plan selection via multiple attribute decision-making approach and fuzzy quantification theory (다속성 의사결정법과 퍼지정량화 이론을 이용한 공정계획 선택에 관한 연구)

  • Leem, Choon-Woo;Lee, Noh-Sung
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.3 no.5
    • /
    • pp.490-496
    • /
    • 1997
  • This paper describes a new process-plan selection method using a modified Fuzzy Quantification Theory(FQT). The problem of process-plan selection can be characterized by multiple attributes and used subjective, uncertain information. Fuzzy Quantification Theory is used for handling such information because it is a useful tool when human judgment or evaluation is quantified via linguistic variables, and the proposed method is concerned with the selection of a process plan by derivation of the values of categories for each attribute. In this paper, a modified Fuzzy Quantification Theory(FQT) is described and the procedure of this approach is explained and examples illustrated.

  • PDF

A study on process-plan selection via fuzzy quantification theory (퍼지정량화 이론을 이용한 공정계획 선택에 관한 연구)

  • 이노성;임춘우
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.668-671
    • /
    • 1997
  • This paper describes a new process-plan selection method using a modified Fuzzy Quantification Theory(FQT). The problem for process-plan selection can be characterized by multiple attributes and used subjective, uncertain information. Fuzzy Quantification Theory is used for handling such informations because it is a useful tool when human judgment or evaluation is quantified via linguistic variables and the proposed method is concerned with the selection of a process plan by derivation of the values of categories for each attribute. In this paper, a modified Fuzzy Quantification Theory(FQT) is described and the procedure of this approach is explained and examples are illustrated.

  • PDF

A Genetic Algorithm A, pp.oach for Process Plan Selection on the CAPP (CAPP에서 공정계획 선정을 위한 유전 알고리즘 접근)

  • 문치웅;김형수;이상준
    • Journal of Intelligence and Information Systems
    • /
    • v.4 no.1
    • /
    • pp.1-10
    • /
    • 1998
  • Process planning is a very complex task and requires the dynamic informatioon of shop foor and market situations. Process plan selection is one of the main problems in the process planning. In this paper, we propose a new process plan selection model considering operation flexibility for the computer aided process planing. The model is formulated as a 0-1 integer programming considering realistic shop factors such as production volume, machining time, machine capacity, transportation time and capacity of tractors such as production volume, machining time, machine capacity, transportation time capacity of transfer device. The objective of the model is to minimize the sum of the processing and transportation time for all parts. A genetic algorithm a, pp.oach is developed to solve the model. The efficiency of the proposed a, pp.oach is verified with numerical examples.

  • PDF

Integrated Manufacturing Systems Design : Integrated Approach to Process Plan Selection and AGV Guidepath Design (통합 제조 시스템 설계 : 공정 계획과 AGV 경로 설계의 통합 접근)

  • Seo, Yoon-Ho
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.20 no.3
    • /
    • pp.151-166
    • /
    • 1994
  • The manufacturing environment on which this research is focused is an FMS in which AGVs are used for material handling and each part type has one or more process plans. The research aims at developing a methodology whereby, given a part and volume mix for production during any production session, the best set of process plans including one plan per part type is selected and the best unidirectional AGV guidepath can be dynamically reconfigured in response to changes in parts and lot sizes combination. For the integrated PPS/FGD problem in which two functions of process plan selection (PPS) and flexible AGV guidepath design (FGD) are integrated, a zero-one integer programming model is developed. The integrated problem is decomposed into two subproblems, process plan selection given a directed AGV layout and AGV guidepath design with a fixed process plan per part type. A heuristic algorithm that alternately and iteratively solves these two subproblems is developed. The effectiveness of the heuristic algorithm is tested by solving various randomly generated sample problems and comparing the heuristic solutions with those obtained by an exact procedure. From the test results, the following conclusions are drawn: 1) For a reasonable size problem, the heuristic is very effective. 2) By integrating the two functions of PPS and FGD, a remarkable benefit in total production time for a given part and volume mix is gained.

  • PDF

Evolutionary Algorithm for Process Plan Selection with Multiple Objectives

  • MOON, Chiung;LEE, Younghae;GEN, Mitsuo
    • Industrial Engineering and Management Systems
    • /
    • v.3 no.2
    • /
    • pp.116-122
    • /
    • 2004
  • This paper presents a process plan selection model with multiple objectives. The process plans for all parts should be selected under multiple objective environment as follows: (1) minimizing the sum of machine processing and material handling time of all the parts considering realistic shop factors such as production volume, processing time, machine capacity, and capacity of transfer device. (2) balancing the load between machines. A multiple objective mathematical model is proposed and an evolutionary algorithm with the adaptive recombination strategy is developed to solve the model. To illustrate the efficiency of proposed approach, numerical examples are presented. The proposed approach is found to be effective in offering a set of satisfactory Pareto solutions within a satisfactory CPU time in a multiple objective environment.

A study on the Highspeed Railway Route Selection -Focusing on 4 design tools- (수도권 고속철도 노선선정 연구 -설계4공구를 중심으로-)

  • Kim, Jong-Seok;Kim, Woo-Je
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.200-207
    • /
    • 2011
  • The research which sees accomplishes the capital region high-speed railway and examines investigates about process of railroad construction project and an advance service contents from to understand a progress process, change process and technical investigation of basic design and the execution plan at the time of route led and accomplishes the plan which is detailed the process which in the center researched. Also plan start method and application plan, clear the security of the plan air which is proper is necessary and dividing which design phase is, plan process construction etc. improvements sacrifice froze.

  • PDF

Optimal Selection of Process Plans for Minimization of the Number of Tool Switches (공구교체 횟수를 최소로 하는 가공방법의 선택문제)

  • Gi, Jae-Seok;Gang, Maeng-Gyu
    • Journal of Korean Society for Quality Management
    • /
    • v.18 no.2
    • /
    • pp.93-99
    • /
    • 1990
  • This paper considers the selection of process plans for a flexible manufacturing machine. Most of the planning models for the automated manufacturing systems are based on the assumption that for each part there is only one process plan available. This paper considers that for each part a number of different process plans are available, each of which may require specific types of tools. If the requisite tools are not on the machine, one or more tool switches must occur before the process plan can be processed. This paper develops an optimal algorithm of branch and bound method for the selection of process plans to minimize the number of tool switches.

  • PDF

Study on aWeb-based Business Process Evaluation Model for BPM using BSC and Fuzzy AHP (BSC와 Fuzzy AHP를 활용한 웹 기반의 BPM 대상 프로세스 선정에 관한 연구)

  • Lee, Seung-Sin;Cho, Chi-Woon
    • IE interfaces
    • /
    • v.22 no.1
    • /
    • pp.26-37
    • /
    • 2009
  • BPM(Business Process Management) secures the agility of an enterprise through automation, integration, and optimization of business process. For the successful BPM introduction, the evaluation and selection of suitable processes for BPM are very important. But as to process evaluation and selection standards, in fact, various selection elements exist and they have to be considered. Therefore, it is very difficult to evaluate systematically and reasonably business processes for enterprises or concerned persons that plan to introduce BPM. This paper describes a Web-based business process evaluation model for BPM using BSC(Balanced Scorecard) and fuzzy AHP(Analytic Hierarchy Process). A Web-based business process evaluation system was implemented based on this and it provides many useful business process evaluation results to enterprises or concerned persons that have insufficient experience and knowledge about BPM, and initially plan to implement BPMS(Business Process Management System). Thus, this paper demonstrates the applicability of fuzzy AHP concept in business process evaluation and selection for BPM, and provides a systemic guidance in the decision-making process.

Selection process of the optimal structural-reinforcement method in remodeling construction works (리모델링 프로젝트의 최적 구조보강방법 선정 프로세스)

  • Kim, Dong-Pil;Cho, Kyu-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.298-299
    • /
    • 2014
  • As a governmental plan for real estate revitalization, remodeling vertical extension has been permitted. Thus, the Ministry of Land, Infrastructure and Transport preannounced proclaiming the revised Housing Act and establishing the remodeling basic plan, and it is anticipated that the remodeling market will be revitalized in earnest after the enforcement of remodeling vertical extension(April 25th. 2014). As vertical extension is applicable up to 3 stories, the safety of building for remodeling is becoming important, so most remodeling construction works use various methods for structural reinforcement. In this process, the selection of structural reinforcement method has depended on structural engineer's experience and knowledge and there has been a limitation in selecting the optimum structural reinforcement method which considers remodeling project characteristics. Therefore, this study analyzed the factors to determine the kinds of structural reinforcement method in a remodeling project and suggested a process to select the best structural reinforcement method of remodeling construction.

  • PDF

A Hierarchical Expert System for Process Planning and Material Selection (공정계획과 재료선정의 동시적 해결을 위한 계층구조 전문가시스템)

  • 권순범;이영봉;이재규
    • Journal of Intelligence and Information Systems
    • /
    • v.6 no.2
    • /
    • pp.29-40
    • /
    • 2000
  • Process planning (selection and ordering of processes) and material selection for product manufacturing are two key things determined before taking full-scale manufacturing. Knowledge on product design. material characteristics, processes, time and cost all-together are mutually related and should be considered concurrently. Due to the complexity of problem, human experts have got only one of the feasilbe solutions with their field knowledge and experiences. We propose a hierarchical expert system framework of knowledge representation and reasoning in order to overcome the complexity. Manufacturing processes have inherently hierarchical relationships, from top level processes to bottom level operation processes. Process plan of one level is posted in process blackboard and used for lower level process planning. Process information on blackboard is also used to adjust the process plan in order to resolve the dead-end or inconsistency situation during reasoning. Decision variables for process, material, tool, time and cost are represented as object frames, and their relationships are represented as constraints and rules. Constraints are for relationship among variables such as compatibility, numerical inequality etc. Rules are for causal relationships among variables to reflect human expert\`s knowledge such as process precedence. CRSP(Constraint and Rule Satisfaction Problem) approach is adopted in order to obtain solution to satisfy both constraints and rules. The trade-off procedure gives user chances to see the impact of change of important variables such as material, cost, time and helps to determine the preferred solution. We developed the prototype system using visual C++ MFC, UNIK, and UNlK-CRSP on PC.

  • PDF