Existing BIM(Building Information Modeling) based energy evaluation tools cannot be utilized enough for the potential performance of BIM because most of them have not provided the integrated model for energy evaluation, assessment of the material, cost of the construction, and so on. This research aims to propose and develop a new application, EcoBIM, to support an integrated evaluation of the energy and cost efficiencies of the design alternatives within the design process. The proposed application functions as a BIM-based evaluation system that calculates energy-savings performance as well as the construction cost of the alternatives at the design stage. This study mainly focuses on the possibilities of developing the proposed technology. We also suggest an advanced design process using the proposed system, corresponding to changes of national regulations in Korea. This study deduce that EcoBIM can allow architects to make suitable decisions regarding energy- and cost-efficient designs. The proposed design process will allow architects not only to check the eco-friendly performance of design alternatives but also predict the operation cost in a certain period in the future. EcoBIM can prevent large-scale design changes required to obtain environmental certification and enable the owner to make an informed decision about the initial investment of construction according to the result of the analysis of the energy requirement at the design stage.
This research was conducted in order to present the strategies of implementing the logistics information system for effective logistics cost management with the case study of a leading global company. The strategy for effective logistics information system can be derived from the 3 different viewpoints, Firstly the effective global logistics management can be insured by means of the efforts of the reinforced total organization. Secondly from the process-oriented perspective, we should recognize the logistics process as the core factor of the competitive strategy and innovate the logistics process itself for the logistics cost reduction. Finally, the logistics cost will be effectively managed through establishing its logistics information strategy which maximizes the utilization of the information technologies. The case study of 'A' electronics company shows that its logistics management system provides the company with various visibilities about its logistics cost and the direct and indirect benefits over billions of wons per year as well. Therefore we can conclude that the research model provided in this research is validated. This study presents the concrete implementation strategies of the logistics information system and verifies the validity of the strategies by means of the case study of a leading company.
Many manufacturers define the system of a new product flexibility, and take advantage of previous-product information using the product configuration concept. Product configuration is an approach that defines the system of a new product centered on the product structure by referring to the previous-product information. In this paper, it is established how to apply the concept of a product configuration utilizing previous-ships information in construction cost estimation process systematically and effectively. For this, we define the advanced-construction cost estimation process based on a naval ship product model, and design construction cost estimating model. It is validated that this process and model have the applicability through the case study of the construction cost estimating of the mine-warfare ship.
Case-based reasoning (CBR) method can make estimators understand the estimation process more clearly. Thus, CBR is widely used as a methodology for cost estimation. In CBR, the quality of case retrieval affects the relevance of retrieved cases and hence the overall quality of the reminding capability of CBR system. Thus, it is essential to retrieve relevant past cases for establishing a robust CBR system. Case retrieval needs the following tasks to obtain appropriate case(s); indexing, search, and matching (Aamodt and Plaza 1994). However, the previous CBR researches mostly deal with matching process that has limits such as accuracy and efficiency of case retrieval. In order to address this issue, this research presents a CBR cost model for building projects that has two-step retrieval process: decision tree and nearest neighbor methods. Specifically, the proposed cost model has indexing, search and matching modules. Features in the model are divided into shape-based and scale-based attributes. Based on these, decision tree is established for facilitating the search task and nearest neighbor method was utilized for matching task. In regard to applying nearest neighbor method, attribute weights are assigned using GA optimization and similarity is calculated using the principle of distance measuring. Thereafter, the proposed CBR cost model is developed using 174 cases and validated using 12 test cases.
There are four main components of the CMP process: polishing pad, slurry, elastic supporter, and pad conditioner. The polishing pad is an essential component to the reproducibility of polishing uniformity in CMP process. However, the polishing pad in recently using metal CMP raised the several points of high cost caused by the increase of cycle time and the many usage of slurry. It is necessary to develop the novel polishing pad which would lead the cost reduction by the higher pad life-cycle, minimized cycle time and lower slurry usage. The characteristics of polishing pad were studied on the effects of different sets of the Polishing pad, which can be applied to metal chemical mechanical polishing process for global planarization of multilevel interconnection structure. The main purpose of this experiment is cost reduction by the increase of pad life-time, the decrease of cycle time and the lower usage of slurry through the specific hard porous structured pad design. It is confirmed that the novel polishing pad made the slurry usage decrease to 60% as well as the pad life-time increase twice with the 25% improvement of removal rate. The polishing time could be decreased and it also helped the cycle time to diminish. It can be expected that this results will help both the process throughput and the device yield to be improved.
In this study, a hydrate inhibition system is investigated for shallow water gas fields. Mono-ethylene glycol (MEG) injection has been used as a typical method for inhibiting hydrate formation in gas fields; therefore, most offshore platforms are equipped with MEG injection and regeneration processes. A recent application of a kinetic hydrate inhibitor (KHI) has reduced the total volume of MEG injection and hence reduce the operating cost. Experiments are designed and performed to evaluate and verify the KHI performance for inhibiting hydrate formation under shallow water conditions. However, the shut-in and restart operation may require the injection and regeneration of MEG. For this operation, the MEG concentration must be optimized while considering the cost of MEG regeneration. The obtained results suggest that decreasing MEG concentration from 80 wt% to 70 wt% can reduce the life cycle cost (LCC) of MEG regeneration process by approximately 5.98 million USD owing to reduced distillation column cost. These results suggest that the hydrate inhibition system must be evaluated through well-designed experiments and process simulations involving LCC analysis.
Journal of Information Technology Applications and Management
/
제15권3호
/
pp.195-208
/
2008
In an emergency management case, evaluating the economic value of information technology investments is a challenging problem due to the effects of decision making, uncertainty of disasters, and difficulty of measurements. Risk assessment and recovery process, one of the major functions in emergency management, consists of (1) measurement of damages or losses, (2) recovery planning, (3) reporting and approving budgets, (4) auctioning off recovery projects to constructors, and (5) construction for the recovery. Specifically and of our interest, measurement of damages or losses is often a costly and time-consuming process because the wide range of field surveys should be performed by a limited pool of trained agents. Managers, therefore, have to balance accuracy of the field survey against the total time to complete the survey. Using information technologies to support field survey and reporting has great potential to reduce errors and lowers the cost of the process. However, existing cost benefit analysis framework may be problematic to evaluate and justify the IT investment because the cost benefit analysis often include the long-run benefit of IT that is difficult to quantify and overlook the impact of managerial control upon the investment outcomes. Therefore, we present an alternative cost-centric control model that conservatively quantifies all cost savings to replace benefits in cost benefit analysis and incorporate the managerial control. The model provides a framework to examine how managerial decision making and uncertainty of disaster affect the economic value of IT investments. The current project in Emergency Agency in South Korea is introduced as a case to apply the cost-centric control model. Our work helps managers to better evaluate and justify IT-related investment alternatives in emergency management.
A simple expected damage cost model is developed and a systematic approach to evaluate the economic effects of seismic hazards to reinforced concrete structures is presented. An expected damage cost function during a specific lifetime is modeled by a Poisson's process with uniform continuous cash flow assumption. It is possible that the proposed method can decouple the damage cost effect from random earthquake events. Thus, expected damage cost function can be formulated as a combination of three independent terms; a present worth factor of Poisson's process, a damage cost interpolation function and a mean occurrence rate of earthquake intensity. The validity of the proposed method is demonstrated by a comparative study of LCC evaluations with the previous study.
Recently many organization to become survival in changing marketplace, they must commit to implementing tools, systems, and quality management techniques. In this paper we develop process method of Team's problem-solving to reduce in failure costs. This paper suggest the step process how to measure quality cost reasonably that works in all types organizations. Or what is continuous improvement? Continuous improvement can be described as the continuous reduction of variation. Variation has many sources(machines, methods, materials, measurements, people, and environments) and cause(special & common in organization). As quality cost are not the answer to every organization financial, or quality-related problem, it's real results are designing & implementing quality cost system might be the answer.
The importance of construction management has been increasing due to the fact that complex construction projects blend several different industries depending on the traits of the construction. This research was conducted to search for a method to enhance efficiency in cost management of construction project and meet the need for reusability of accumulated construction information. The process of detailed estimation and methodology for using standard unit price information has been developed to strengthen the interoperability in cost information by utilizing a standard classification system. The concept of ontology is proposed as a method of connecting construction information based on a standard breakdown structure to increasing the connectivity of the cost information in the construction project. Therefore, construction information knowledge framework is developed in order to improve the efficiency of the detailed estimation work process.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.