• Title/Summary/Keyword: Process BIM

Search Result 501, Processing Time 0.024 seconds

A Case Study of Status and Characteristics of the BIM Standard in China (중국 BIM 표준의 현황과 특성에 관한 사례 분석)

  • Shin, Kyoo-Chul
    • Journal of KIBIM
    • /
    • v.8 no.3
    • /
    • pp.20-30
    • /
    • 2018
  • The Standard for BIM in Construction of China was released in 2017. The Unified Standard for BIM of China also took effects on 2017. The BIM standards of China needs to be compared with those related guidelines of Korea to find the status and characteristics for future development of BIM application in both countries' construction industries. The research methodology is a case study of comparing various standards of both countries. The case study results reveals many interesting issues for future BIM application and guidelines for practice of design and construction process. The research foundings include followings : LOD (Level of development) are well defined including LOD 350 in Chinese Standard. P-BIM(Practice based BIM) concepts and series of standards are set for the well-defined design and construction process by work stage in China. Korean standards shows more processes of design and documentation in detail. Major three aspects, particularity in BIM standard by work trade, practicality in BIM work process of design and construction, and professionality in subjects of BIM application, are analyzed and compared with various Guidelines of BIM in both countries.

A Study on the 'Level of Information' in BIM-based Design Process (BIM 기반 설계프로세스의 단계별 정보 수준에 관한 연구)

  • Koh, In-Lyong;Kim, Myoung-Keun;Min, Young-Gi;Chung, Tae-Seung
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.3
    • /
    • pp.111-117
    • /
    • 2012
  • The study presents the way to maximize the functionality and the effectiveness of the BIM model, and the type of information used in the overall process of construction projects. If the designing process is the generator of architecture information, then the step-by-step BIM model created in the process is the container for formation and property information. BIM written rules and methods are proposed in order for the architectural BIM model structured in the early stages of designing to go through a process of review and collaboration, and to be seamlessly linked to the basic designing steps. Accordingly, the BIM model construction and operation strategy suggested will substantially reduce the work of designing, structuring, and collaborating, that will be shared and linked.

A Study on the Enablers and Barriers of BIM-based Assembling Collaboration for Designers' Communication and Socio-Psychological Mechanisms (BIM기반의 어셈블링 협업이 설계자 간의 의사교환과 사회심리학적 기제에 미치는 효과와 한계에 관한 연구)

  • Hong, Seung-Wan;Jeong, Yongwook
    • Journal of KIBIM
    • /
    • v.7 no.1
    • /
    • pp.36-44
    • /
    • 2017
  • While previous studies argue that BIM-based assembling collaboration promotes the communication and process management among participants in architectural design projects, it is still unknown which communication and socio-psychological factors are more and less activated in use of BIM-based collaboration. To investigate this research aim, in authentic BIM-used architectural retrofitting projects, the participants (N=36) collaborated and assessed the communication factors on (1) perceiving design results, (2)understanding partners'design intention, (3) proposing and converging opinions, the interpersonal design process management factors on (1) managing design process, (2) managing collaboration schedule, and the complementedness factors on (1) understanding partners' expertise, and comradeship. Statistical analyses reveal that the factor relevant to perceiving design results is better activated than the other factors (p<0.05), but all other factors are not much activated compared to perceiving design results. Deduced from the previous BIM studies and interviews, a reason roots in the shared forms and semantics of BIM. The shared semantics represent collaborators' information and allow the participants to perceive design changes explicitly. Meanwhile, BIM-based assembling collaboration is limited to represent observable, experience-able processes of design, and thus, several key socio-psychological factors, such as proposing and converging opinions and managing design process, are less activated.

The Experiment of Architectural Design Education by means of BIM (BIM을 이용한 건축디자인 교육의 실험연구)

  • Kim, Yong-Il;Yang, Kwan-Mok
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.19 no.5
    • /
    • pp.37-43
    • /
    • 2012
  • Results of experiments conducted in university-based design studio suggests that Building information Modeling invites the adoption of a dramatically different design process, traditional design process and BIM-aided design process. Experiment method is used the actual experiment by students. In contrast to traditional design process rooted in successive refinement of abstractions and dependence on tacit knowledge, the studio BIM-aided design process depends on a complete and comprehensive date base and alterative solutions by complete analysis for helping choice of finial result. BIM viewed as provocateur of design education provides great potential for the critical analysis of how architectural design is taught. The results reflect new ways of teaching and addressing BIM methods and process in the design studio project.

A Basic Study on the Development of the BIM Service Level Assessment Process (BIM 서비스 수준 평가 프로세스 개발을 위한 기초연구)

  • An, Ji-Won;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.1
    • /
    • pp.87-93
    • /
    • 2019
  • In recent years, BIM services have been used in many construction projects. However, they are raising the question that there are many differences between what was initially proposed and what was actually done. In the IT sector, a method called as SLA is used to perform an assessment of the services delivered to the IT service project. In this respect, this study intends to introduce this method into building construction projects to use BIM in order to propose evaluation criteria and the evaluation process for SLA-based BIM service. The BIM service assessment process and criteria presented are judged to help introduce consistent and systematic BIM services in construction projects.

How to automatically extract 2D deliverables from BIM?

  • Kim, Yije;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1253-1253
    • /
    • 2022
  • Although the construction industry is changing from a 2D-based to a 3D BIM-based management process, 2D drawings are still used as standards for permits and construction. For this reason, 2D deliverables extracted from 3D BIM are one of the essential achievements of BIM projects. However, due to technical and institutional problems that exist in practice, the process of extracting 2D deliverables from BIM requires additional work beyond generating 3D BIM models. In addition, the consistency of data between 3D BIM models and 2D deliverables is low, which is a major factor hindering work productivity in practice. To solve this problem, it is necessary to build BIM data that meets information requirements (IRs) for extracting 2D deliverables to minimize the amount of work of users and maximize the utilization of BIM data. However, despite this, the additional work that occurs in the BIM process for drawing creation is still a burden on BIM users. To solve this problem, the purpose of this study is to increase the productivity of the BIM process by automating the process of extracting 2D deliverables from BIM and securing data consistency between the BIM model and 2D deliverables. For this, an expert interview was conducted, and the requirements for automation of the process of extracting 2D deliverables from BIM were analyzed. Based on the requirements, the types of drawings and drawing expression elements that require automation of drawing generation in the design development stage were derived. Finally, the method for developing automation technology targeting elements that require automation was classified and analyzed, and the process for automatically extracting BIM-based 2D deliverables through templates and rule-based automation modules were derived. At this time, the automation module was developed as an add-on to Revit software, a representative BIM authoring tool, and 120 rule-based automation rulesets, and the combinations of these rulesets were used to automatically generate 2D deliverables from BIM. Through this, it was possible to automatically create about 80% of drawing expression elements, and it was possible to simplify the user's work process compared to the existing work. Through the automation process proposed in this study, it is expected that the productivity of extracting 2D deliverables from BIM will increase, thereby increasing the practical value of BIM utilization.

  • PDF

An Analytical Appraisal of Building Information Modelling (BIM) Guidelines to Identify Variations in the Procedures

  • Das, Dakshata;Moon, Sungkon
    • Journal of KIBIM
    • /
    • v.6 no.3
    • /
    • pp.1-14
    • /
    • 2016
  • The usage of Building Information Modelling (BIM) in building projects has enabled improvement in project planning, implementation and collaboration process amongst various stakeholders within architecture, engineering and construction (AEC) industry. However, variations exist in the current practices of BIM implementation and coordination process in the industry. These variations result in inconsistent degree of BIM use across the construction industry. This inconsistency gives rise to several managerial and technological challenges such as data interoperability issues and purposeful integration and exchange of information within the BIM components. In order to tackle the issue, it is essential to analyse the different BIM approaches employed by the industry practitioners. BIM guidelines serve as a critical link between the BIM model, and its subsequent execution. They therefore provide the best reflection of BIM application and processes. This research paper aims to address the variations existing in BIM practices across the construction industry. It includes an extensive study of 21 existing, publicly available BIM-based guidelines in order to establish an understanding of the present state of practice and deduce issues and concerns related to them. All guidelines analysed in this paper are first categorised based on authorship and the release date for efficient comparison. The points of similarity and difference between them are thereby realized and outlined. In addition, the transition of project implementation process from traditional methods to BIM technology is also explained. The existence of inconsistencies in the BIM guidelines reviewed in this paper reflects the need of a BIM 'Code Compliance Check'. The Code Compliance Check will serve as a regulatory project guideline that will further improve the potential of BIM by incorporating a consistent BIM modelling methodology for the entire construction industry.

A Study on Process of Architectural Design Education Using BIM (BIM을 적용한 건축설계 수업과정에 관한 연구)

  • Min, Young-Gi;Chung, Kwang-Ho
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.13 no.3
    • /
    • pp.33-40
    • /
    • 2013
  • The purpose of this study is to propose an curriculum for architectural studio in university to implement BIM process, through the analysis of the advantages of the BIM tool. The limitation of this study was to analyze the case study of only half year a single university. University education in the design process, the design that can be used in applying BIM content should be universal, university education considering the special working conditions, excessive BIM-based application can be difficult. Therefore, a systematic and reliable design that can be applied to education applies BIM design process is necessary to establish. University education applying BIM design review and design proposal the various 3D visualization can be used effectively to determine. In addition, the planned representation for thinking about and drawing 3D model building, architectural space can be used for visualization, and other subjects in conjunction with structural analysis, environmental analysis, facility layout, etc. can be used.

Exploring a BIM-based approach of project management

  • MA, Xiaozhi;XIONG, Feng;DONG, Na
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.241-244
    • /
    • 2015
  • Within the building industry, building information modelling has been widely applied among different organizations, disciplines and project phases. In order to achieve coordination and synergy collaborative effort, it demands organized information flow and communication for effective implementation of project management through the construction process. Although many BIM researches provides solutions for project management, few efforts have involved the whole life-cycle process of project. In this article, BIM-based project management relying on a series of applications of BIM technology was introduced by coupling management requirement of a project with BIM. Through adopting BIM to the life-cycle management of the project and incorporating BIM applications to project management practice, we have developed a BIM-based project management approach that specialize in integrated BIM chain and interface-supporting system. At the end, the developing process of BIM-based project management approach is concluded.

  • PDF

Application of Lean Theory to BIM-Based Coordination - A Case Study on Process Re-Engineering of MEP Coordination - (린 기법의 BIM 기반 설계조율 프로세스 접목 - 설비전기 설계조율 프로세스 재설계 사례연구 -)

  • Jang, Se-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.1
    • /
    • pp.67-79
    • /
    • 2018
  • This paper provides theoretical deformation of lean concept and its application for usage of building information modeling (BIM) process. Recently, much research is focused on application of lean concept for more efficient usage of BIM. The lean theory and its basic function and feature is based on manufacturing industry. The manufacturing process can be improved by process re-engineering steps of lean concept which consist of the steps of value, value stream, flow, pull, perfection. However manufacturing process and construction process has different characteristics. Due to the differences, five steps of the traditional lean's process re-engineering can't be directly applied to the BIM based engineering process. In order to solve this problem, we conduct analysis on the characteristics of the manufacturing process and BIM based engineering. We propose modified and expanded concept of lean for process re-engineering and the modified theory was applied to the mechanical, electrical and plumbing (MEP) coordination process. Through the proposed 8 steps of methodology, 2D based process was changed to integrated and using BIM based MEP coordination process. In addition, the results showed the potentiality of cost reduction and process improvement. The results of this study can be a foundation for the theoretical combination of lean and a variety part of construction engineering process.