• Title/Summary/Keyword: Problem and Improvement Plan

Search Result 433, Processing Time 0.03 seconds

Analysis and improvement plan for job stress relief activities of technical personnel in architectural design offices -based on staff- (건축 설계사무소 기술인력의 직무스트레스 해소활동 분석 및 개선방안 -사원을 중심으로-)

  • Cho, Sang-Hyeok;Gil, Min-Wook;Ahn, Jong-Hyeok;Shin, Won-Sang;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.125-126
    • /
    • 2022
  • Office workers at the architectural design office are under job stress for various reasons such as excessive working hours, friction with the site, and unpredictability of work. This can increase not only the negative image of office workers in the construction industry, but also the avoidance of young manpower in the future. This study investigated the specific purpose of each activity as a problem of job stress relief activities in the architectural design office, and the specific purpose and goal setting of each activity as a way to improve job stress relief activities.

  • PDF

The Improvement of Wetland Conservation Plan for Upo Wetland Protected Area (우포늪 습지보호지역 보전계획 개선방안)

  • Kim, Su-Ryeon;Song, Won-Kyong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.22 no.4
    • /
    • pp.65-80
    • /
    • 2019
  • The Wetland Conservation Plan is used as a tool to set the management direction of wetland protected areas, and which is establishing a plan for the conservation, wise-use, and management based on wetland's condition. This study was conducted to establish a conservation plan considering the functions and management conditions of Upo wetland protected area. To this end, there are analyzed the current issues, plans and implementation status of Upo Wetland Conservation Plans in the past. The management elements to be considered in establishing the Wetland Conservation Plan were selected through prior research analysis and the priority of those elements was identified through the AHP. As a result, it was found that lack of considering the changes and performance evaluation of the existing plans in wetlands, conducting short-term projects related to maintenance original function of wetland, different management methods for wetland protected areas and other adjacent areas, lack of understanding and cooperation by stakeholders, inconsistencies in timing of the Conservation Plan and survey of wetland protected areas. In order to improve the problem, it needs to include the performance evaluation stage of establishing the conservation plan, strengthen cooperation of stakeholders and expertise, continuing of projects for wetlands' maintenance, priority of the project considering the management side, and to adjust the timing of plans to improve data availability.

A Study on the Improvement of Construction Progress Management for EVMS (공정-원가 통합관리를 위한 진도관리 개선 방안)

  • Lee, Kyoo-Hyun;Park, Chan-Jung;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.3
    • /
    • pp.155-162
    • /
    • 2002
  • The Ministry of Construction-Transportation released a plan about EVMS in 1993 in order to prepare measures for an efficient public construction project, and prepared an enforcement proposal concretely in June for 2000 years, and have enforce a public project by an example with a target. Therefore, accurate analysis and evaluation about field progress are required for efficient management of a building construction, and must be established building construction management system for fast action about a problem However, unified management cannot be consisting because a work progress system is different from details estimate system within a country. and There is not still a definite standard in progress measurement for an application of EVMS. A purpose of this study is to present an improvement about a problem of progress measurement for an application of EVMS. The contents of a study, inquired into a progress measurement method and a standard to use in the field of a public construction and private construction and Checks a problem and presented an improvement item necessary for and is as follows. $\circled1$ must establishes a control account and progress measurement standard. $\circled2$ must manage progress in a activity viewpoint. $\circled3$ must use an accurate CPM process management technique.

Operational Problem Analysis and Improvement Plan in the Smart Factory Promotion Process

  • Lee, Seong-Hoon;Lee, Dong-Woo
    • International journal of advanced smart convergence
    • /
    • v.11 no.4
    • /
    • pp.273-278
    • /
    • 2022
  • Uncertainty is increasing around the world due to COVID-19 and Ukraine crisis. In this situation, each company is making countless efforts to survive. In Korea, smart factory projects targeting small and medium-sized businesses with difficulties have been continuously promoted. As for the smart factory business that has been promoted so far, the base expansion of the smart factory is also steadily increasing as the number of companies carrying out the project is increasing. It was also found that it contributed to productivity improvement and quality improvement. Despite these positive aspects, difficulties and operational problems are also appearing in the process of promoting smart factories. In this study, we investigated and analyzed operational problems and difficulties in the process of promoting smart factories. In addition, improvement plans for problems were presented according to the contents of this analysis, and improvement plans were presented by classifying them into introduction and supply companies, considering that the smart factory business is formed in the form of a consortium between introduction and supply companies.

Analysis on Climate Action Plans of Portland, Oregon, USA (기후변화대응을 위한 미국 포틀랜드시 기후변화 실천계획의 주요 특성 분석에 관한 연구)

  • Choi, Joon-Sung
    • KIEAE Journal
    • /
    • v.13 no.3
    • /
    • pp.3-13
    • /
    • 2013
  • As climate change is increasingly recognised as an important global problem, a wide variety of policies and measures are emerging at global and local level to deal with the challenges from the anthropogenic global warming. While national and inter-national efforts characterized by limiting GHG emissions shows very little progress because of their expanse spatial scale and complicated political situations, local efforts have the potentials to ensure effective implementation, monitoring and continual improvement. In the context of local-scale climate policy, the city of Portland is known as one of the best leading cities for its progress of implementing climate change strategies. This paper will briefly discuss the city's efforts to solve the climate change problem and its achievements. The latest climate action plan is selected for the analysis on the followings; the framework of the action plan, the types of implementation methods, and the coordinating agencies. The progress status of each action plans is also reviewed. The purpose of this paper is to describe the main characteristics of the climate action plans and their implications from the intensive analysis on the city of Portland's case.

Improvement plan for the standard for calculating the height of the stair railing for Barrier Free (BF) certification system (장애물 없는 생활환경(BF) 인증제도 계단 난간 높이 산정기준 개선안)

  • Lee, Sang-Soo;Bang, Hong-Soon;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.218-219
    • /
    • 2022
  • Among the Barrier Free (BF) certification evaluation items for public facilities, at which position the standard for the effective height of the stair railing handle should be calculated is not clearly determined. Because of this, not only the evaluation standards of the certification authority and the evaluation committee are different, but disputes are occurring between the ordering organization, the design company, and the construction company. Therefore, the stair railing installation standard laws for public facilities were analyzed and through a case study of institutions that obtained the BF certification, problems were analyzed. The results of problem analysis reveal the following. 1) The standards of the Ministry of Health and Welfare and the Ministry of Land, Infrastructure, and Transport were different. 2) The effective height calculation standard was ambiguous, and disputes occurred frequently. To solve this problem, we proposed improvement plans for calculating the height of the stair railing that can comply with laws while ensuring safety.

  • PDF

Multiobjective Transportation Infrastructure Development Problems on Dynamic Transportation Networks (화물수송체계의 평가와 개선을 위한 다목적 Programming모델)

  • 이금숙
    • Journal of Korean Society of Transportation
    • /
    • v.5 no.1
    • /
    • pp.47-58
    • /
    • 1987
  • A commodity distribution problem with intertemporal storage facilities and dynamic transportation networks is proposed. mathematical integer programming methods and multiobjective programming techniques are used in the model formulation. Dynamic characteristics of commodity distribution problems are taken into account in the model formulation. storage facility location problems and transportation link addition problems are incorporated into the intertemporal multicommodity distribution problem. The model is capable of generating the most efficient and rational commodity distribution system. Therefore it can be utilized to provided the most effective investment plan for the transportation infrastructure development as well as to evaluate the existing commodity distribution system. The model determines simultaneously the most efficient locations, sizes, and activity levels of storage facilities as well as new highway links. It is extended to multiobjective planning situations for the purpose of generating alternative investment plans in accordance to planning situations. sine the investment in transportation network improvement yields w\several external benefits for a regional economy, the induced benefit maximization objective is incorporated into the cost minimization objective. The multiobjective model generates explicitly the trade-off between cost savings and induced benefits of the investment in transportation network improvement.

  • PDF

Science and Technology Innovation Policy for Solving Social Problems in Korea: Transformative Innovation Policy Perspective ('전환적 혁신정책'의 관점에서 본 사회문제 해결형 R&D정책: '제2차 과학기술기반 사회문제 해결 종합계획'을 중심으로)

  • SONG, Wichin;SEONG, Jieun
    • Journal of Science and Technology Studies
    • /
    • v.19 no.2
    • /
    • pp.85-116
    • /
    • 2019
  • This research examines the characteristics of the newly emerging 'transformative innovation policy' and discusses the current status and issues of the Korean social problem solving R & D policy. Transformative innovation policy is a new paradigm that aims to transform socio-technical systems to address societal challenges. In this study, we analyzed 'the policy plan for solving social problems based on science and technology'. In the "Policy Plan", efforts are being made to establish new direction of science and technological innovation activities such as emphasis on social values, network formation of innovation actors, and spreading of social impact. But in this "Policy Plan", the perspective of transformative innovation policy is weakly reflected. The Policy Plan refers to system improvement that adds new elements to existing system, but it is not discussing system transformation. In order to develop social problem solving R & D policy from the viewpoint of the transformative innovation policy, it is necessary to construct the innovation platform deliberating vision and prospect for the socio-technical transformation.

A Study on Ways to Improve the Smell of Pig Barn

  • Min-Jae JUNG;Su-Hye KIM;Young-Do KIM
    • Journal of Wellbeing Management and Applied Psychology
    • /
    • v.6 no.2
    • /
    • pp.9-13
    • /
    • 2023
  • Purpose: In this study, we would like to make a technical proposal to solve the odor problem in pig houses. Through this, we would like to suggest an effective way to reduce the odor generated in the pig house as a solution to civil complaints. Research design, data and methodology: Conduct direct visits to pig farms where many civil complaints about bad odor occur, and identify the problems of each farm. Identify elements related to odor control, such as structure, facility, equipment, odor management method, and ventilation type. Through this, the technology to be applied to reduce odor and the solution to the odor problem are presented. Results: The results of major improvements are as follows: 1. Improvement of the structure of the barn or composting shed to an airtight type 2. Improvement of the pig manure treatment structure using the slope inside the barn 3. Establishment of ventilation and cooling systems 4. Automation of the mist spray system. Conclusions: As a result, as practical measures, sealing of facilities using winch curtains, construction of air conditioning systems using negative pressure ventilation, and management systems using AIoT systems were presented. It is judged that this study can be helpful in determining the grievances caused by civil complaints of tenant livestock farms and the direction of facility improvement in the future.

A Study for Use Conditions and Activation Plan of Chungnam Keumkang Arboretum (충남금강수목원의 이용실태 및 활성화 방안에 관한 연구)

  • Baek, Dong-Yeol;Cheong, Yong-Moon;Byeon, Jae-Sang
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.6 no.6
    • /
    • pp.14-24
    • /
    • 2003
  • This study had researched use conditions of forty-seven arboreta in the inside and outside of the country for the suggestion of activation plan of provincial arboretum. Chungnam Keum-Kang Arboretum in Kongju-Si, Chung-Cheong Nam-Do, had been surveyed as a case study. The survey was focused on current condition, location, ecological resources, characteristics and so on. In addition, questionnaire of users of Keum-Kang arboretum were conducted. Chungnam Keum-Kang arboretum is located in the inland area and has many vegetations. It is a provincial arboretum which was planted by trees, shrubs and vines, and a public garden which was used by paid admission. It has natural recreation forests, tropical green houses and breeding grounds for birds and wild animals. It, however, has many problem in the use and management system. And the shortages of attraction and program for user are serious problem. For the use activation and the improvement of management of this arboretum, this study suggested as follows ; (1) The responsible experts in charge of the general management of arboretum are demanded. (2) Term master plan for improvement of arboretum must be established. (3) It is necessary to manage for collection, propagation, display and preservation of plant species. (4) It is necessary to hold suitable and variety events for the seasons. (5) It is needed to arrange fitly convenience facilities.