• 제목/요약/키워드: Priority method

검색결과 1,726건 처리시간 0.031초

토양 중의 비휘발성 산성 유기 Priority Pollutants 동시분석에 관한 연구 (Simultaneous Analysis of Semi-Volatile Organic Acid Priority Pollutants in Soil)

  • 이승석;박교범;이성근
    • 대한화학회지
    • /
    • 제38권3호
    • /
    • pp.246-253
    • /
    • 1994
  • 미국 환경청이 지정한 129종의 priority pollutants 중 11종의 비휘발성 산성 유기화합물을 대상물질로 선정하여 토양시료 중의 극미량 분석방법을 연구하였다. 분석방법으로 기체크로토그래프/질량분석기- SIM(selected ion monitoring)법을 검출방법으로 정하고, 토양시료의 추출 및 농축방법으로 사용한 초음파 추출법(sonication extraction)과 Soxhlet(Soxhlet extraction)을 비교 연구하였다. 각 화합물의 회수율, 상대표준편차 및 method detection limit를 측정하여 EPA분석법을 대체할 수 있는지의 가능성을 조사하였다.

  • PDF

도시공원 조성의 우선순위 결정에 있어서 계층분석과정 기법의 적용 (Application of Analytic hierarchy Process to decide the priority of undeveloped neighborhood park)

  • 박문호
    • 한국조경학회지
    • /
    • 제24권1호
    • /
    • pp.42-54
    • /
    • 1996
  • Many of urban parks which have been designated for urban planning regulation are not well developed because the priority of investment is inferior to that of other public facilities. Park development is an urgent urban policy and it is hard to decide priority among parks. Therefore, it is necessary to evaluate the priority of park development. Thus the Analytic Hierarchy Process has been introduced because it is suitable for achieving objectivity by collecting the professional opinions. The goals of park development are evaluated by AHP method and the priorities among goals are conservation of natural environment, satisfying the residents' residents' needs, population density, regional pollution, land acquisition cost, ratio of greeneries and facilities within park areas. Priority of park development is decided by the standardization of each individual inventory data and considering of the professional opinions. Among the multi-attribute judgement methods, AHP method may be the most widely used. Despite the critical evaluations of the AHP, such as limitation of the nine-point scale and the rank reversal problem, application of AHP to decide the priority of park development is suitable for actual circumstances.

  • PDF

농업용저수지 재개발 우선순위 결정 연구 (Study on the Priority Decision for Redevelopment of Agricultural Reservoir)

  • 김해도;김선주;이광야
    • 한국농공학회논문집
    • /
    • 제51권6호
    • /
    • pp.63-68
    • /
    • 2009
  • Most of agricultural reservoirs in Korea have no function of flood control except 5% of reservoirs even exposed to natural disaster. In addition, there are increasing needs for the reservoir to guarantee the release of environmental flow to the downstream. Thus, the purpose of this paper is to study the priority decision method for the reservoir redevelopment satisfying both water utilization and flood control. The major scopes of this research are to set up six priority indices and to make needed GIS data for calculating each priority. There is important consideration of obtaining the data or not in deciding the indices. Although the detailed indices is expected to better reflect redevelopment priority but the subjective indices like, 'opinion' and 'landscape' are excluded. From the results, it will enables the six priority indices to really assist in decision redevelopment priority of agricultural reservoirs.

토양 중의 Pesticide Priority Pollutants 동시 분석에 관한 연구 (Simultaneous Analysis of Pesticide Priority Pollutants in Soil)

  • 이승석;박영주;이석근
    • 분석과학
    • /
    • 제8권3호
    • /
    • pp.237-248
    • /
    • 1995
  • 미국 환경청이 지정한 129종의 priority pollutants 중 16종의 유기살충제를 포함한 토양시료를 제조하여 표준분석방법인 기체크로마토그래프-전자포획법과 기체크로마토그래프/질량분석기-SIM (selected ion monitoring)법을 이용하여 동시분석의 효율성을 실험하였다. 토양시료의 추출 및 농축방법으로는 EPA의 SW-846 방법을 조금 수정한 초음파추출법(sonication extraction)과 Soxhlet 추출법(Soxhlet extraction)을 비교 연구하였다. 각 화합물의 회수율, 상대표준편차 및 method detection limit를 측정하여 그 결과들을 보고하였다.

  • PDF

잠열 축열식 칠러시스템의 제어 방식에 따른 성능 분석 (A Performance Analysis on a Chiller with Latent Thermal Storage According to Various Control Methods)

  • 강병하;김동준;이충섭;장영수
    • 설비공학논문집
    • /
    • 제29권11호
    • /
    • pp.592-604
    • /
    • 2017
  • A chiller, having a thermal storage system, can contribute to load-leveling and can reduce the cost of electricity by using electricity at night. In this study, the control experiments and simulations are conducted using both conventional and advanced methods for the building cooling system. Advanced approaches, such as the "region control method", divide the control region into five zones according to the size of the building load, and determines the cooling capacities of the chiller and thermal storage. On the other hand, the "dynamic programming method" obtains the optimal cooling capacities of the chiller and thermal storage by selecting the minimum-cost path by carrying out repetitive calculations. The "thermal storage priority method" shows an inferior chiller performance owing to the low-part load operation, whereas the chiller priority method leads to a high electric cost owing to the low utilization of thermal storage and electricity at night. It has been proven that the advanced control methods have advantages over the conventional methods in terms of electricity consumption, as well as cost-effectiveness. According to the simulation results during the winter season, the electric cost when using the dynamic programming method was 6.5% and 8.9% lower than that of the chiller priority and the thermal storage priority methods, respectively. It is therefore concluded that the cost of electricity utilizing the region control method is comparable to that of the dynamic programming method.

배전계통 신뢰도를 고려한 전기설비투자 우선순위 결정 기법 (An Improved Investment Priority Decision Mettled for the Electrical Facilities Considering the Reliability of Distribution Networks)

  • 박창호;채우규;장성일;김광호;김재철;박종근;최정환
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권4호
    • /
    • pp.177-184
    • /
    • 2005
  • This paper proposes a improved investment priority decision method of the facilities considering the reliability of distribution networks. The proposed method decides a investment order of the facilities combining, by fuzzy rules, the investment priority decision of KEPCO and the priority decision considering reliability evaluation indices. Where reliability evaluation indices are SAIFI(System Average Interruption Frequency Index) and SAIDI(System Average Interruption Duration Index), as referred to evaluation index for sustained interruption. The reliability analysis method of distribution networks applied in this paper utilizes analytic method, where the used reliability data is historical data of KEPCO. Particularly, we assumed that the failure rate increased as the equipment ages. To verify the performance of the proposed method, we applied it with the planned projects to reinforce the weak facility electrical facilities in KEPCO in 2004. The evaluation result showed that, under a limited budget, the reliability of the KEPCO in the Busan region using the proposed method can be enhanced than using the conventional KEPCO's method. Therefore, the results verify the proposed method can be efficiently used in the actual priorities method for investing the electrical facilities.

셀 전송비율에 의한 우선순위 제어방식을 사용한 ATM 스위치의 성능 분석 (Performance Analysis of ATM Switch Using Priority Control by Cell Transfer Ratio)

  • 박원기;김영선;최형진
    • 전자공학회논문지A
    • /
    • 제32A권12호
    • /
    • pp.9-24
    • /
    • 1995
  • In this paper, we proposed and analysed two kinds of priority control mechanism to archive the cell loss rate requirement and the delay requirement of each class. The service classes of our concern are the high time priority class(class 1) and the high loss priority class(class 2). Two kinds of priority control mechanism is divided by the method of storing the arriving class 2 cell in buffer on case of buffer full. The first one is the method which discarding the arriving class 2 cell, the second one is the mothod which storing the arriving class 2 cell on behalf of pushing out the class 1 cell in buffer. In the proposed priority schemes, one cell of the class 1 is transmitted whenever the maximum K cells of the class 2 is transmitted on case of transmitting the class 1 cell and the class 2 cell sequentially. In this paper, we analysed the cell loss rate and the mean cell delay for each class of the proposed priority scheme by using the Markov chain. The analytical results show that the characteristic of the mean cell delay becomes better for the class 1 cell and that of the cell loss rate becomes better for the class 2 cell by selecting properly the cell transfer ratio according to the condition of input traffic.

  • PDF

철도건설 투자우선순위에 관한 연구 (A Study on Criteria for investment Priority of Railway Project)

  • 박일하;박용걸;김시곤
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.112-116
    • /
    • 2008
  • Determining the investment priority of the railway project is essential to keep its object of railway investment. [National railway construction plan] provide 4 major evaluation indicators and their weighting range in determining the investment priority of railway construction. Which are investment efficiency, inter-regional balance of development, network effects, government supporting policy. However this present criteria has inconsistency in determining economical feasibility of the railway transportation when applying the same evaluation indicator, investment efficiency, with the road transportation. The railway transportation is superior to road transportation in terms of transportation capacity and distance, while offering less carbon emissions. In spite of the prominent position of the railway transportation, it can be failed to obtain its proper investment priority when being determined under economical feasibility based. Therefore, this study analyzed the inconsistency under present evaluation criteria and proposed new evaluation method for the investment priority of the railway construction using AHP(analytic hierarchy process), while differentiate from the road construction. This method is optimized for only determining the priority of the railway construction itself under object of railway investment respectively.

  • PDF

개념설계단계에서 요구품질을 고려한 설계사양 중요도 결정방법 (A Priority Setting Method of the Design Specifications with regards to Functional Requirements at the stage of Concept Design)

  • 박지형;이중호;염기원
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2006년도 춘계학술대회 논문집
    • /
    • pp.119-120
    • /
    • 2006
  • Prioritizing the design specifications among many alternatives is necessary at the stage of concept design. Design specifications have trade-offs between cost and performance, and the relationships among them, in the standpoint of various functional requirements, are complex. AHP(Analytic Hierarchy Process) method is one of the most popular ways of solving the priority setting problem. However, it is impossible to monitor the interim findings in the middle of the process, it is hard to predict the difference when changing pairwise comparison conditions, and the operation done by one person makes it hard to share the process simultaneously. This paper shows a new method of priority setting in this kind of decision making problem. This method is designed to support the realtime priority setting among many design specifications with regards to many functional requirements. A new algorithm and visualization methods are introduced, and the usability is verified in an exemplary concept design stage.

  • PDF

MPLS 망에서 우선 순위가 높은 트래픽을 위한 빠른 복구 방법 (A Fast Restoration Method for the High Priority Traffics in MPLS Networks)

  • 이봉하;김응하;송정길
    • 인터넷정보학회논문지
    • /
    • 제4권2호
    • /
    • pp.1-9
    • /
    • 2003
  • MPLS 망에서 망의 생존성을 높이기 위하여 사용되는 경로 복구는 작업 경로의 링크나 노드에 장애가 발생했을 때 트래픽을 복구 경로로 전달함으로써 신뢰성 있는 서비스를 제공하는 기술이다. 본 논문에서는 링크 장애시에 높은 우선 순위의 트래픽를 위한 경로 복구 방법으로 작업 경로의 이중화를 통하여 경로를 복구하는 방법을 제안한다. 기존의 복구 방법은 링크 장애시에 트래픽의 우선 순위에 관계없이 동일하게 복구 경로로 전송되어 우선 순위가 높은 트래픽의 복구 시간이 많이 소요되는 문제점이 있었다. 이에 반해 제안된 복구 방법은 우선 순위가 높은 트래픽이 전송되는 작업 경로에 대해서 이중화된 경로를 설정하여 트래픽을 전송할 수 있어 신속히 연결이 복구되는 장점을 갖는다. 그리고 이중화 경로를 이용한 복구 시스템의 성능을 분석하고, 우선 순위가 높은 트래픽에 대해서 제안한 경로 복구 방법이 기존의 경로 복구 방법보다 성능이 우수함을 시뮬레이션을 통하여 제시한다.

  • PDF