• Title/Summary/Keyword: Priority decision making

Search Result 352, Processing Time 0.027 seconds

AHP Model for Evaluating EIS Software Packages (EIS 소프트웨어 패키지 평가를 위한 AHP 모형)

  • Byun, Dae-Ho
    • Asia pacific journal of information systems
    • /
    • v.9 no.3
    • /
    • pp.75-92
    • /
    • 1999
  • Executive information systems (EIS) developers are faced with an increasingly difficult choice problem in the evaluation and selection of software packages. For many reasons, they frequently must depend on identification and evaluation of features of packages. When EIS software evaluation is regarded as an unstructured or semi-structured group decision making problem, the most appropriate decision-aiding methods are needed to help effective group interaction. This paper examines evaluation criteria of full-featured EIS packages and considers the priority of these criteria using the Analytic Hierarchy Process (AHP). Two exploratory phases are presented. In the first phase, an approach combining the AHP with the linear weighted attribute method is presented to computer qualities of some packages. In the second phase, the decision making group includes EIS developers, users, and vendors to prioritize evaluation criteria.

  • PDF

Dynamic Decisions using Variable Neighborhood Search for Stochastic Resource-Constrained Project Scheduling Problem (확률적 자원제약 스케줄링 문제 해결을 위한 가변 이웃탐색 기반 동적 의사결정)

  • Yim, Dong Soon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.43 no.1
    • /
    • pp.1-11
    • /
    • 2017
  • Stochastic resource-constrained project scheduling problem is an extension of resource-constrained project scheduling problem such that activity duration has stochastic nature. In real situation where activity duration is not known until the activity is finished, open-loop based static policies such as activity-based policy and priority-based policy will not well cope with duration variability. Then, a dynamic policy based on closed-loop decision making will be regarded as an alternative toward achievement of minimal makespan. In this study, a dynamic policy designed to select activities to start at each decision time point is illustrated. The performance of static and dynamic policies based on variable neighborhood search is evaluated under the discrete-event simulation environment. Experiments with J120 sets in PSPLIB and several probability distributions of activity duration show that the dynamic policy is superior to static policies. Even when the variability is high, the dynamic policy provides stable and good solutions.

Prioritization of Information and Communication Technologies for Strategic Standardization (정보통신 중점기술의 표준화 우선순위 결정방법)

  • Koo, Kyoung-Cheol;Woo, Hoon-Shik;Jo, In-Jun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.15 no.1
    • /
    • pp.1-8
    • /
    • 2011
  • To visualize a strategic plan including resource allocations and standardization schedules, it is important to set priorities among information and communication technologies(ICTs) standardization work areas(SWAs). This ranking process involves decision making process with multiple criteria which results a complex selection problem. In this study, analytic hierarchy process(AHP) is employed and applied to solve this decision making problem. The processes and results are illustrated for an effective strategic plan in standardization decision processes.

Decision-Making on Incoterms 2020 of Automotive Parts Manufacturers in Thailand

  • SURARAKSA, Juthathip;AMCHANG, Chompoonut;SAWATWONG, Nutcharin
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.10
    • /
    • pp.461-470
    • /
    • 2020
  • The objective of this research is to examine the factors affecting the decision-making of International Commercial Terms (Incoterms) of automotive parts manufacturers in Thailand. This mixed method study applied qualitative and quantitative research methods and utilized the analytical hierarchy process (AHP) to prioritize the significance of the factors. By an in-depth literature review and expert interview, four main criteria were identified. These criteria include Operating costs, Cooperation and bargaining power, Knowledge and understanding and Operation duration then main criteria divided into fifteen sub-criteria. The common Incoterms, Ex Works (EXW), Free On Board (FOB), Free Carrier (FCA), and Cost, Insurance and Freight (CIF), were determined as alternatives to the incoterms through a preliminary survey. The results revealed that the operating costs were the most important factor for the company. Moreover, it was discovered that this was consistent with the priority of the secondary factors, which included the annual budget for the transportation expenses and product value at one time. The respondents' perspective suggested that FCA was the most appropriate Incoterms for international trade for a company. The findings of this research suggest a hierarchy model for organizations to prioritize the significant factors in order to make a decision on the most appropriate Incoterms.

Development of Decision Making Model for Soft Foundation Improvement Method considering Technically, Economic Effective Factors (기술적 ${\cdot}$ 경제적 영향요소를 고려한 연약지반 개량공법의 의사결정모델 개발)

  • Lee, Heung-Chol;Woo, Sung-Kwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.698-701
    • /
    • 2006
  • Various improvement methods to treat settlement and stability of structures on soft foundation, that is now continuously introduced after being scrutinized. Therefore, it is very important to select the most suitable method among these various ones. In this study, quantifying the importance of effective factors when making decision, inducing priority and significance weight, systematic standard is proposed for technical, economic factor in making selection of soft foundation improvement method.

  • PDF

High-speed Rail Infrastructure Priority Decision Making on Level of Design Speed by Rail Network Design Problem (철도망 설계모형을 이용한 설계속도 수준별 고속철도망 투자우선순위 선정)

  • Park, Jin-Kyung;Lim, Yong-Taek;Lee, Jun;Eom, Jin-Ki;Moon, Dae-Seop
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.3
    • /
    • pp.427-436
    • /
    • 2009
  • This paper introduced Railway Network Design Problem (RNDP) to provide priority decisions on high-speed railway investment scenarios defined by various network segments and train systems. The RNDP optimizes the objective functions of minimize total travel time. Results show that the priority of high-speed railway investment is found to be East-west, West-coast, and South-coast line respectively. An entirely new line built with 400km/h is found to be the best alternative to East-west line. Regarding West-coast and South-coast line, the combined alternative of upgrading Geolla and Kyeonjon line with 200km/h and building a new line with 400km/h and 350km/h for remains of each line is the best.

Decision Making for Priority of Water Allocation during Drought by Analytic Hierarchy Process (계층분석과정(AHP)에 의한 가뭄시 용수배분 우선순위 위사 결정)

  • Lee, Hyun-Jae;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.6
    • /
    • pp.703-714
    • /
    • 2002
  • During drought, there have been a number of conflicts because of the limited and insufficient water to allocate for the numerous water users. To solve the problems, the decision on the priority of water use should be made with social rationality A rational and systematic procedure needs to be implemented in order to decide the priority of water use. First, a criteria level is made of the main and detailed drought impacts which come from the economic, environmental, and social aspects. Four alternatives are then identified for priority of water use. Second, survey to the two group(professional, residents) has been done with using pair wise comparisons. Finally, the relative weights and the priority of alternatives are determined by means of the Analytic Hierarchy Process(AHP) which is one of the Multi-Attributed Decision Method(MADM). By using AHP, it has been concluded that the water allocation during drought should be accomplished in order of domestic, irrigation, industrial, and river maintenance water. If the AHP method were improved for inconsistency which may be generated with survey analysis, a number of applications will be used for the solutions of problem in water resources systems.

Priority Decision Making for Planning A Long-term Sustainable High-speed Rail Network using Multi-Attribute Utility Theory (지속가능한 고속철도망 계획을 위한 투자우선순위 선정에 관한 연구 : 다원-속성 효용이론을 이용하여)

  • Park, Jin-Kyung;Eom, Jin-Ki;Lee, Jun
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.1
    • /
    • pp.45-53
    • /
    • 2008
  • With the growing international consensus regarding sustainable development of transportation, the plan of transportation infrastructure needs to meet various requirements toward enhancing environmental conditions. Accordingly, the upcoming long-term plan of high-speed rail network has to be reflecting the sustainability of transportation systems. In this paper, we demonstrate an application of methodologies based on multi-attribute utility theory for determining priorities of sustainable high-speed rail investment. The proposed methodologies identify indicators for sustainable transportation systems such as economic, environmental, and social ones and then, evaluate priority for planning a long-term sustainable high-speed rail network by comparing the relative importance among indicators. This will help transportation agencies to prioritize high-speed rail investment toward sustainable transportation systems.

A Study on the Priority Ranking Algorithm for Bridge Management at Network Level (Network Level을 고려한 교량의 우선순위 산정 알고리즘에 관한 연구)

  • Kim Kwang-Soo;Kim Hyeong-Yeol;Park Sun-Kyu
    • Journal of the Korea Concrete Institute
    • /
    • v.17 no.3 s.87
    • /
    • pp.323-328
    • /
    • 2005
  • Bridge structures are properly designed in accordance with the design specifications with required safety margin. However, due to the heavy vehicle traffic and environmental attacks, bridge often requires repairs and the deteriorated one should be replaced or rehabilitated. In this paper, a prior ranking algorithm is proposed to assist a decision making process in bridge management at network level. Based on the literature survey for the existing studuies, two important factors which affect the decision making procedure for bridge management at network level are identified. These factors are implemented into the algorithm as a load carrying capacity function and traffic function, respectively.

Application of AHP-PROMETHEE to determine areal and linear priorities for sewer rehabilitation projects (하수관로의 면단위 및 선단위 정비 우선순위 결정을 위한 AHP-PROMETHEE기법의 적용)

  • Ahn, Hosung;Yoo, Soonyu;Lee, Taehoon;Park, Kyoohong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.34 no.4
    • /
    • pp.289-301
    • /
    • 2020
  • Since sewer rehabilitation program requires long construction period and enormous capital investment, determination of rehabilitation priorities is important with systematic planning considering appropriate evaluation parameters. In this research, we applied PROMETHEE(Preference Ranking Organization METHod for Evaluations) known as very objective and scientific multi-criteria decision-making analysis, using the weights determined by AHP(Analytic Hierarchy Process) for the selected sewer evaluation items to calculate the rehabilitation priorities for each sewer sub-catchment in basin Gusan 1 of Seoul. Preference functions and preference thresholds were estimated for each criterion of ratio of lack of hydraulic capacity of sewers, defect ratio, ratio of sewers with velocity less than its minimum criteria, and density of sewers in the sub-catchment. As a result, it was found that region d had the first priority among four sub-catchments. For each and every sewer located in region d, we could also rank sewers to be rehabilitated urgently.