• Title/Summary/Keyword: Priority Setting

Search Result 252, Processing Time 0.03 seconds

Priority-setting in Expanding the Basic Benefit Package in Korean Health Insurance Scheme (건강보험 기본급여의 우선순위)

  • 정형선;김주경;이규식;신의철
    • Health Policy and Management
    • /
    • v.14 no.2
    • /
    • pp.34-57
    • /
    • 2004
  • Universal health insurance normally requires a basic benefit package, whose design intersects with almost all other aspects of the health insurance debate. Despite its central importance, basic benefit package has not received the analysis it deserves in Korea. The issue of how to decide which health services should be delivered and to whom has been a matter for consistent policy debate. Many industrialized countries observed in this study have been dealing explicitly or implicitly with the basic benefit package. The methods vary from having a specific positive list of services (Bismarkian countries) to the use of guidelines (Beveridgian countries). The purpose of this paper is to form the underlying principles and process for determining what is included or left out by getting accurate and representative responses from health-related personnel. Mail survey is used. Economic burden for treatment, seriousness of disease and urgency of treatment are ranked at the first three priorities. Services that had been suspended because of financial crisis in health insurance scheme in 2001 were selected as items which should firstly be expanded into coverage. Diagnostic test against heart disease and vaccination were also selected as items which should additionally belong to the list of covered services.

A study on Quality System Management in Small and Medium Enterprises (중소기업 품질시스템 운영 방안에 관한 연구)

  • Park Roh-Gook
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.10 no.4
    • /
    • pp.120-127
    • /
    • 2005
  • Quality system management adapted by small and medium enterprises in Kangwon province to enhance the competitiveness was studied. Variance analysis on several questionnaire answers was performed. Motives for acquiring the accreditation, such as product export, adjustment to international trend, enhancement of brand/product recognition, CEO's mind change, and management innovation, have been changed significantly among business types. Mind changes after the accreditations were setting company's first priority on quality, enhanced recognition on compliance of in-house standards and regulations, employee's performance with the recognition of quality. Amongst service problems to maintain the accreditations were difficulties in maintaining the recognition of the company's quality management, labor increase to maintain the ISO 9000 enforcement team, and financial burden to keep the accreditation. Quality recognition after the accreditations was significantly improved in setting company's first priority on quality, enhanced recognition on compliance of in-house standards and regulations, employee's performance with the recognition of quality.

  • PDF

A Hybrid Method of MultiAttribute Utility Theory and Analytic Hierarchy Process for R&D Projects' Priority Setting. (MAUT/AHP를 이용한 연구개발사업 우선순위 선정방법)

  • 김정흠;박주형
    • Proceedings of the Technology Innovation Conference
    • /
    • 1999.06a
    • /
    • pp.245-265
    • /
    • 1999
  • MAUT and AHP are widely used for quantification of subjective judgements in various fields of decision making. This study focuses on the introduction and application of MAUT/AHP method which is a hybrid of MAUT and AHP techniques in R&D project priority setting. This hybrid model can clarify each factors' contribution using MAUT method and can reduce the number of pairwise comparisons of AHP method. This study applies AMUT/AHP method to the evaluation of R&D projects in a Government - funded research institute. To evaluate R&D projects, six evaluation factors are derived. SMART(Simple MultiAttribute Rating Technique) and DVM(Difference Value Measurement ) out of many MAUT methods are used to design the utility function ad AHP is used to allocate the weights among evaluation factors. The major findings of this study can be summarized as follows. First, the SMART/AHP and the DVM/AHP have the same results with the SMART and the DVM, and they are different results with AHP. It is very hard to decide which one is better. Second, MAUT/AHP's strength is analyzed. MAUT reflects utility values of evaluators to alternatives and AHP results objective and consistent weights of factors through pariwise comparisons. Third, its possible application fields are proposed. It is applicable to subjective decision making problems with high complexity and inter-independent factors.

  • PDF

A Study on the Evaluation Criteria for Setting up the Priority of Archiving Different Types of Digital Contents (과학기술 분야 콘텐츠 유형별 아카이빙 우선순위 결정을 위한 평가기준의 설정에 관한 연구)

  • Kim, Jin-Mook;Choi, Jae-Hwang;Kwak, Seung-Jin
    • Journal of Information Management
    • /
    • v.43 no.2
    • /
    • pp.1-22
    • /
    • 2012
  • The purpose of this study is to provide a theoretical basis for archiving the digital contents in Science and Technology. We first examined the evaluation criteria for archiving different types of digital contents by using quantitative research methods, like a user survey. We then further investigated how participants perceived each evaluation criterion by adopting qualitative research methods, like a focus group discussion. Also, we presented an evaluation model for setting up the priority of digital archiving among various types of digital contents.

An Analysis on Priority of Clothing Evaluative Criteria using AHP (AHP를 이용한 의복평가기준의 우선순위 분석)

  • Cho, Youn-Joo
    • Fashion & Textile Research Journal
    • /
    • v.9 no.1
    • /
    • pp.81-88
    • /
    • 2007
  • This study aimed to develop priorities alternatives based on relative rather than absolute assignments on clothing evaluative criteria. The relative comparison approach includes much redundancy and is thus less sensitive to judgemental errors common to techniques using absolute assignments. By deriving evaluative criteria for consumers in choosing clothing, and considering their relative important or value in the priority of evaluation elements. When the consumer selects clothing, it requires multi-criteria decision making exercise and needs to make trade-offs between different alternatives. With an application of the AHP's hierarchical structuring and pair-wise comparisons, this study will determine the weight and priorities of evaluation factor in clothing evaluative criteria in choosing cloth, which will eventually lead to improve management. Items for the setting priority were decided as 'symbol', 'practicality', 'economy', 'vogue', and 'aesthetic' by council. The data for this research were collected from respondents of 108 females in Busan. Data were analyzed by frequency and AHP. As the results, 'economy' was decided as a most important item. And 'a fashionable color' evaluated as that of first priority in the totality evaluation elements.

Job-aware Network Scheduling for Hadoop Cluster

  • Liu, Wen;Wang, Zhigang;Shen, Yanming
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.11 no.1
    • /
    • pp.237-252
    • /
    • 2017
  • In recent years, data centers have become the core infrastructure to deal with big data processing. For these big data applications, network transmission has become one of the most important factors affecting the performance. In order to improve network utilization and reduce job completion time, in this paper, by real-time monitoring from the application layer, we propose job-aware priority scheduling. Our approach takes the correlations of flows in the same job into account, and flows in the same job are assigned the same priority. Therefore, we expect that flows in the same job finish their transmissions at about the same time, avoiding lagging flows. To achieve load balancing, two approaches (Flow-based and Spray) using ECMP (Equal-Cost multi-path routing) are presented. We implemented our scheme using NS-2 simulator. In our evaluations, we emulate real network environment by setting background traffic, scheduling delay and link failures. The experimental results show that our approach can enhance the Hadoop job execution efficiency of the shuffle stage, significantly reduce the network transmission time of the highest priority job.

A Study on Mulwang Reservoir Water Quality Improvement Effect Using Watershed-Reservoir Integrated Prediction (유역-호소 통합수질예측 기법을 이용한 물왕저수지 수질개선효과 분석)

  • Oh, Heesang;Rhee, Han-Pil
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.59 no.3
    • /
    • pp.51-62
    • /
    • 2017
  • Since living environment has improved, waterfront space using and clear water demand have increased. Ministry of Environment (ME) designated polluted reservoir (worse than 4th grade) as a priority management reservoir to improve water quality (better than 3rd grade) accordingly. Minstry of Agriculture, Food and Rural Affairs (MAFRA) aims reservoir water quality 4th not 3rd grade. And water quality of agricultural reservoirs was not a great interest. For this reason, there are very few water quality monitoring data. However after designating as a priority management reservoir, reservoir manager should start water quality and flow monitoring of reservoirs and inflow streams. This process makes it possible setting complex model to accurate prediction of reservoir water quality and volume. Mulwang reservoir designated as a priority management reservoir in September 2014. In this study, BASINS/WinHSPF and EFDC-WASP were used to predict effect of water quality improvement countermeasures in Mulwang reservoir. To improve water quality of Mulwang reservoir, Siheung-si and Korea Rural Community Corporation (KRCC) established water quality improvement countermeasures. However result of simulation adapting these countermeasures cannot achieve 3rd grade. So 4 additional scenarios were adapted and the result satisfied 3rd grade. This study could help to establish water quality improvement countermeasure by using complex modeling.

A Study on Development Priority of Undeveloped Urban Neighborhood Park in Case of Daegu Metropolitan City (미개발 근린공원의 개발 우선순위 결정 -대구광역시를 대상으로-)

  • 이기철;김경완
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.29 no.1
    • /
    • pp.80-91
    • /
    • 2001
  • The purpose of this research is to provide a basic knowledge to open up for undeveloped park in process of the park policy establishment by setting up the priority of park development and valuation factor, valuation index as well as building a basic material to undeveloped neighborhood park in Daegu Metropolitan City. Thirteen urban neighborhood parks(1,841,663$m^2$) in the Daegu Metropolitan City were selected for this study. Analyzing and reviewing the previous research and literature review were conducted, and the evaluation index and analysis criteria were constructed to decide the development priority of parks. The results of this research are as follows; 1) Following to the result of the expert questionnaire test in order to estimate weight of valuation factors. It had a high score in available population, and estimated amount of the gross compensation, unpurchased land rate. On the other hand park rate of autonomous district, altitude, rate of population increase in autonomous district and a low score. 2) Generally, most f the plain type parks had a high score in the Sea level, land using pattern, an estimated amount of the gross compensation, but hill type parks had a high score the rate of green covered, park area for one person of administration building. 3) Daebong, Soosung, Dosan, 2.28 youth, Kyungnam parks were selected high priority. Soochang, Donsibong, Janggi, Dongin parks were selected middle priority. Bokhyun, Galsan, Manchon, Gusoosan parks, which were selected low priority. This research for undeveloped park is a basic research step to open up. Three many difficult things in shortage of the basic material for building valuation factor and measuring of the method measurement. The application of weight which make a decision importance among the valuation factor should have ore reasonable study and more scientific research from now because there still remains a lot of shortage of positive materials in there.

  • PDF

Identifying Priority Area for Nonpoint Source Pollution Management and Setting up Load Reduction Goals using the Load Duration Curve (부하지속곡선을 이용한 비점오염원 우선관리 지역 선정 및 관리목표 설정 연구)

  • Jang, Sun Sook;Ji, Hyun Seo;Kim, Hak Kwan
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.5
    • /
    • pp.17-27
    • /
    • 2018
  • The objective of this study is to identify the priority area where the nonpoint source pollution (NPS) management is required and to set up the load reduction goals for the identified priority area. In this study, the load duration curve (LDC) was first developed using the flow and water quality data observed at 286 monitoring stations. Based on the developed LDC, the priority area for the NPS pollution management was determined using a three-step method. The 24 watersheds were finally identified as the priority areas for the NPS pollution management. The water quality parameters of concern in the priority areas were the total phosphorus or chemical oxygen demand. The load reduction goals, which were calculated as the percent reduction from current loading levels needed to meet target water quality, ranged from 67.9% to 97.2% during high flows and from 40.3% to 69.5% during moist conditions, respectively. The results from this study will help to identify critical watersheds for NPS program planning purposes. In addition, the process used in this study can be effectively applied to identify the pollutant of concern as well as the load reduction target.

A Greedy Merging Method for User-Steered Mesh Segmentation

  • Ha, Jong-Sung;Park, Young-Jin;Yoo, Kwan-Hee
    • International Journal of Contents
    • /
    • v.3 no.2
    • /
    • pp.25-29
    • /
    • 2007
  • In this paper, we discuss the mesh segmentation problem which divides a given 3D mesh into several disjoint sets. To solve the problem, we propose a greedy method based on the merging priority metric defined for representing the geometric properties of meaningful parts. The proposed priority metric is a weighted function using five geometric parameters, those are, a distribution of Gaussian map, boundary path concavity, boundary path length, cardinality, and segmentation resolution. In special, we can control by setting up the weight values of the proposed geometric parameters to obtain visually better mesh segmentation. Finally, we carry out an experiment on several 3D mesh models using the proposed methods and visualize the results.