Probabilistic Earlier GMP Calculation Method for Apartment Using CM at Risk (CM at Risk를 적용한 공동주택의 확률론적 초기 GMP 산정방안)

  • Hyun, Chang-Taek;Go, Gun-Ho;Jin, Zhengxun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.3
    • /
    • pp.295-303
    • /
    • 2018
  • In the DBB delivery system, the design stage and the construction stage are separated. Because of this, design changes frequently occur, and problems such as construction cost overrun, schedule delay, and quality deterioration happen as well. Recently, in the construction industry CM at Risk(CM@R) delivery system, which can systematically solve the above-mentioned problems of DBB delivery system, meet various demands of clients, and overcome the limited cost and period. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the CM performer carries out the construction within the GMP. However, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. In this study, a Probabilistic Earlier GMP Calculation Method by combining a probabilistic tool of Monte Carlo simulation with a case based reasoning is proposed so that the uncertainty in GMP calculation is reflected. After the earlier GMP is calculated, a process to calculate the $2^{nd}$ GMP at the time of around 80 % of detailed deign and to negotiate with the client to fix the final GMP is proposed. The Probabilistic Earlier GMP Calculation Method is verified through the case study. In this study, researchers set the range of GMP through the proposed probabilistic GMP calculation and tried to reduce the risk through negotiation between the client and the CM performer. The proposed method and process would contribute to the successful introduction of CM@R in Korea.

A Study on the Factors Affecting the Detailed Design Price of Road Construction Project (국내 도로공사 실시설계 대가영향요인에 관한 연구)

  • Lee, Mi-Young;Seo, Jung-Hoon;Oh, Se-Wook
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.9
    • /
    • pp.44-54
    • /
    • 2018
  • In the construction project, the design field has a crucial effect on the success or failure of the final product, and it is becoming more important as a core area of national industrial development because it creates high value added by technology. In addition, since the design work is carried out based on professional technical personnel, in order to secure the quality and competitiveness of the design, it is necessary to continuously input the excellent manpower and develop the technology, and above all, the appropriate design cost must be ensured. However, as a result of reviewing the current status of the design cost criterion in Korea, problems such as mixed cost calculation method, inaccuracy of construction cost ratio method, and inactivation of cost plus fixed fee method were analyzed. Therefore, it is difficult to calculate the fair value reflecting the characteristics of the project when calculating the construction design price. Therefore, the price criterion should be improved so that the fair value of the design can be determined according to the contents of the project, By analyzing the correlation and multiple regression analysis of the projects and price information of the completed road construction design, the factors influencing the design price and the level of influence were analyzed.

Economic Analysis of a Residential Ground-Source Heat Pump System (단독주택용 지열원 열펌프 시스템의 경제성 분석)

  • Sohn, Byong-Hu;Kang, Shin-Hyung;Lim, Hyo-Jae
    • New & Renewable Energy
    • /
    • v.3 no.4
    • /
    • pp.31-37
    • /
    • 2007
  • Because of their low operating and maintaining costs, ground-source heat pump(GSHP) systems are an increasingly popular choice for providing heating, cooling and water heating to public and commercial buildings. Despite these advantages and the growing awareness, GSHP systems to residential sectors have not been adopted in Korea until recently. A feasibility study of a residential GSHP system was therefore conducted using the traditional life cycle cost(LCC) analysis within the current electricity price framework and potential scenarios of that framework. As a result, when the current residential electricity costs for running the GSHP system are applied, the GSHP system has weak competitiveness to conventional HV AC systems considered. However, when the operating costs are calculated in the modified price frameworks of electricity, the residential GSHP system has the lower LCC than the existing cooling and heating equipments. The calculation results also show that the residential GSHP system has lower annual prime energy consumption and total pollutant emissions than the alternative HVAC systems considered in this work.

  • PDF

A Study on the Relation of the Design and Operating Economy for Bulk Carrier (散積貨物船의 設計와 運航經濟性과의 評價에 關한 硏究)

  • 박명규;최학선
    • Journal of the Korean Institute of Navigation
    • /
    • v.16 no.2
    • /
    • pp.1-19
    • /
    • 1992
  • A Study for the relation between design parameters in conceptual stage and freight cost in operation of ocean-going bulk carrier was presented by economic criterial. Ship design procedure was followed to traditional method and programmed. The measure of merit is the Required Freight Rate(RFR). Parametric method used insteady of optimization technique due to easy to illustrate the results. Calculation results to the relation ship dimension, speed and operating cost in this paper show the influence of oil price is very important. Particularly, when oil price estimated as go up, owner choose a ship which lengh is long , breadth/draft is near 2.0 and speed is low. This program is useful for shipyard, consultant officer and owner all together.

  • PDF

An Analysis of Location Marginal Prices Considering Demand Response Resources (수요반응자원을 고려한 지역별 한계가격 해석기법 연구)

  • Kim, Hyun-Houng;Kim, Jin-Ho;Kim, Hyeong-Jung;Shin, Joong-Rin;Park, Jong-Bae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.1
    • /
    • pp.25-33
    • /
    • 2008
  • This paper presents a new approach of a evaluation of location marginal prices(LMPs) considering demand response resources in the competitive electricity market. The stabilization of the electric power supply and demand balance has been one of the major important activities in electric power industry. Recently, much attention is paid to the demand-side resources which are responsive to incentives or time-varying prices and existing power system planning and operation activities are incorporated with the so-called demand response resources. In this paper, we first present an analytical method for calculation of LMPs considering demand response resources and then break down the LMPs into three components. In this study, we assume that Korean power system consists of two major regions, one which is the metropolitan and the other is non-metropolitan region. In the case study, we have considered several LMPs cases with different use of locational demand response resource and we can obtain a locational signal to demand response resources. Also, the economics of demand response resources are evaluated, compared with the increase of transmission line capacity and of generation capacity.

Assessing the Economic and $CO_2$ Emission Reductions Viability of Domestic Ground-Source Heat Pumps (단독주택용 지열 열펌프 시스템의 경제성과 이산화탄소 배출 저감 가능성 평가)

  • Sohn, Byong-Hu;Kang, Shin-Hyung
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.64-69
    • /
    • 2009
  • Because of their low operating and maintaining costs, ground-source heat pump(GSHP) systems are an increasingly popular choice for providing heating, cooling and water heating to public and commercial buildings. Despite these advantages and the growing awareness, GSHP systems to residential sectors have not been adopted in Korea until recently. A feasibility study of a residential GSHP system was therefore conducted using the traditional life cycle cost(LCC) analysis within the current electricity price framework and potential scenarios of that framework. As a result, when the current residential electricity costs for running the GSHP system are applied, the GSHP system has weak competitiveness to conventional HVAC systems considered. However, when the operating costs are calculated in the modified price frameworks of electricity, the residential GSHP system has the lower LCC than the existing cooling and heating equipments. The calculation results also show that the residential GSHP system has lower annual prime energy consumption and total greenhouse gas emissions than the alternative HVAC systems considered in this work.

  • PDF

Economic Analysis of a Residential Ground-Source Heat Pump System (단독주택용 지열원 열펌프 시스템 경제성 분석)

  • Sohn, Byong-Hu;Kang, Shin-Hyung;Lim, Hyo-Jae
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.515-518
    • /
    • 2007
  • Because of their low operating and maintaining costs, ground-source heat pump(GSHP) systems are an increasingly popular choice for providing heating, cooling and water heating to public and commercial buildings. Despite these ad- vantages and the growing awareness, GSHP systems to residential sectors have not been adopted in Korea until recently. A feasibility study of a residential GSHP system was therefore conducted using the traditional life cycle cost(LCC) analysis within the current electricity price framework and potential scenarios of that framework. As a result, when the current residential electricity costs for running the GSHP system are applied, the GSHP system has weak competitiveness to conven- tional HVAC systems considered. However, when the operating costs are calculated in the modified price frameworks of electricity, the residential GSHP system has the lower LCC than the existing cooling and heating equipments. The calculation results also show that the residential GSHP system has lower annual prime energy consumption and total pollutant emissions than the alternative HVAC systems considered in this work.

  • PDF

A Study on the Energy Saving Capacity of Solar Power Generation System using Economic Evaluation (경제성 평가를 통한 태양광발전시스템 연계형 에너지저장장치 용량 선정에 관한 연구)

  • Lee, Yeo-Jin;Kim, Sung-Yul;Han, Se-Kyung
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.67 no.1
    • /
    • pp.21-26
    • /
    • 2018
  • Due to the international environmental regulations and changes in policies, the demand for generators using the renewable energy is increasing. However, renewable energy generators with intermittent output characteristics such as solar and wind power generators, need the buffer facilities such as ESS during system operations. However, because of low price competitiveness in energy storage system, it is difficult to operate the renewable energy generator with ESS. Therefore, the government has recently proposed a policy to compensate the REC for renewable energy system with ESS. For all this, since the initial cost of the ESS is high, it is the most important to calculate and operate the optimal capacity of the ESS through an economic analysis. In this paper, we proposed the method of calculation the optimal capacity of ESS and analyzed economic feasibility of renewable energy system using the ESS according to depreciation in ESS price.

Statistical model for forecasting uranium prices to estimate the nuclear fuel cycle cost

  • Kim, Sungki;Ko, Wonil;Nam, Hyoon;Kim, Chulmin;Chung, Yanghon;Bang, Sungsig
    • Nuclear Engineering and Technology
    • /
    • v.49 no.5
    • /
    • pp.1063-1070
    • /
    • 2017
  • This paper presents a method for forecasting future uranium prices that is used as input data to calculate the uranium cost, which is a rational key cost driver of the nuclear fuel cycle cost. In other words, the statistical autoregressive integrated moving average (ARIMA) model and existing engineering cost estimation method, the so-called escalation rate model, were subjected to a comparative analysis. When the uranium price was forecasted in 2015, the margin of error of the ARIMA model forecasting was calculated and found to be 5.4%, whereas the escalation rate model was found to have a margin of error of 7.32%. Thus, it was verified that the ARIMA model is more suitable than the escalation rate model at decreasing uncertainty in nuclear fuel cycle cost calculation.

Improvement of the Calculation Standard for Prolongation cost of Domestic Public Construction Project (국내 공공 공사 공기연장 간접비 산정 기준 개선방안 - 국가계약법 및 지방계약법 산정기준의 비교 고찰 -)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.95-102
    • /
    • 2016
  • Recently, a research regarding calculation of construction time extension-oriented incidental costs has been intensively suggested in quantitative aspect and recent studies on system improvement has been made continuously. In the case of Domestic Public Construction Works, State Contract Act is applied when the client is government whereas Local Government Contract Act is done when the client is local government, but more meticulous study is required because improvement plan is not proposed even there is a clear demand for improvement of these problems on calculation standard. Thus this study suggested appropriate standard by comparing each the calculation standards followed by 'State Contract Act' and 'Local Government Contract Act', considering the problems accorded, and analyzing field cases. Calculation method of other expenses was differently regulated as the revision of each regulation, and this demonstrates that there is a difference of actual cost from 12.37% to 24.95%. It is shown that less cost of construction time were calculated than actual cost according to a problem of calculation method by State Contract Act as the rate at the time of contract to be applied in other expense rate. This study suggested the rate against incidental cost and the rate of other expense per day against total construction cost as an appropriate rate calculation for other expense based on field database.