• Title/Summary/Keyword: Pre-project planning

Search Result 83, Processing Time 0.028 seconds

Case-Based Reasoning Support for ERP Pre-Planning

  • Kwon, Suhn-Beom;Shin, Kyung-shik
    • Journal of Intelligence and Information Systems
    • /
    • v.9 no.2
    • /
    • pp.171-184
    • /
    • 2003
  • A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the most similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research would be extended to cover other stages of project planning.

  • PDF

Case-Based Reasoning Support for ERP Pre-Planning

  • Kwon, Suhn-Beom;Shin, Kyung-shik
    • Proceedings of the KAIS Fall Conference
    • /
    • 2003.11a
    • /
    • pp.171-177
    • /
    • 2003
  • A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the best similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research should be extended to cover other stages of project planning.

  • PDF

A Basic Study on the Development of Simulation Systems for Supporting the Pre-design Phase of Construction Projects (건축 기획 지원 시뮬레이션 시스템 개발에 관한 기초 연구)

  • Min, Kyung-Min;Ham, Nam-Hyuk;Kim, Joo-Hyung;Kim, Jae-Jun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.176-181
    • /
    • 2007
  • The widespread of IT technology caused a remarkable change in many industries and the construction industry is also one of them being influenced in the form of CIC(Computer Integrated Construction) and BIM(Building Information Modeling). Construction projects have many participants from various disciplines involved throughout the entire process. Therefore the success of the project greatly depend on the efficiency of decision-making using the information generated from each process stage. Looking from this aspect, the greatest potential value lies in the planning and pre-design stage when considering the construction life cycle. In this paper, we propose a project on developing a 3D object oriented simulation system for supporting the pre design phase. We define the needs for such system through previous case studies and suggest a to be process model. Finally we anticipate the effects that the project will eventually contribute to the construction industry.

  • PDF

Investigating the Factors Influencing Project Satisfaction and Performance in Pre-Project Phase (프로젝트 준비단계에서 프로젝트 성과에 영향을 미치는 요인에 관한 연구)

  • Kim, Gimun;Park, Yu Jin;Kim, Kijoo
    • Journal of Information Technology Applications and Management
    • /
    • v.20 no.4
    • /
    • pp.293-313
    • /
    • 2013
  • Preproject phase is an important but often ignored research area in information systems field although it has an undeniable importance for successful project. The purpose of this study is to identify factors affecting project performance in preproject phase and to find empirically critical factors among them. After deriving 9 factors through literature review including clear project definition, project leader position, staffing efforts, preproject team expertise, preproject knowledge scope, preproject partnering, top-management support, resource sufficiency, and project climate, the study investigate the influence of those factors on project performance. The study results reveal that clear project definition, project climate, resource sufficiency, pre-project knowledge scope, project leader position have significant impact on project process satisfaction, a measure of project performance, but the other factors do not. Based on the empirical results, the study discuss academic and practical implications.

A Study on the Importance of Risk Factors for Effective Risk Management in the Pre-Project Planning Phase of the Development Projects (국내개발사업 사전기획단계에서의 효율적 리스크 관리를 위한 리스크 인자 중요도에 관한 연구)

  • Shin Kyu-Ho;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.75-86
    • /
    • 2002
  • The construction market is diversely changing because social environmental factors are rapidly transforming. Therefore, Construction projects are becoming complex and diverse. Furthermore, the risk being inherent in construction projects are increasing, and now people are considering about the risk management of construction projects in successfully handling the risk factor. The purpose of this study is first to comprehend the preparation of basic references for objective and systematic identification, categorization, and analysis of risk. Secondly it is to find the principle elements within the risk factors identified and categorized around planning process. Finally it is to manage objectively on the planning process, which forms a lot of uncertainty, in order to accentuate the importance about the risk of pre-planning process stage

Ontology-based Safety Risk Interactions Analysis for Supporting Pre-task Planning

  • Tran, Si Van-Tien;Lee, Doyeop;Pham, Trang Kieu;Khan, Numan;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.96-102
    • /
    • 2020
  • The construction industry remains serious accidents, injuries, and fatalities due to it's unique, dynamic, and temporary nature. On workplace sites, Safety pre-task planning is one of the efforts to minimize injuries and help construction personnel to identify potential hazards. However, the working conditions are complicated. Many activities, including tasks or job steps, are executing at the same time and place. It may lead to an increase in the risks from simultaneous tasks. This paper contributes to addressing this issue by introducing a safety risk interaction analyzing framework. To accomplish this objective, accident reports of the Occupational Safety and Health Administration (OSHA) are investigated. The pairs of task incompatibility, which have time-space conflicts and lead to incidents, are found. Ontology technology is applied to build the risk database, in which the information is acquired, structuralized. The proposed system is expected to improve pre-task planning efficiency and relieve the burdens encountered by safety managers. A user scenario is also discussed to demonstrate how the ontology supports pre-task planning in practice.

  • PDF

A Study on the Architectural Planning of traditional herbal medicine distribution supporting facilities (한약재유통지원시설의 건축계획에 관한 연구)

  • Bae, Joa-Sup;Oh, Jong-Hee;Kang, Won-Pil
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.14 no.2
    • /
    • pp.53-64
    • /
    • 2008
  • This study is the architectural planning of 5 distribution supporting facilities for traditional herbal medicine cultivated in the rural areas. The main function of the facility consists of storage, pre-treatment/processing, loading/unloading and the assistant function consists of inspection, office, exhibition/sale, technical equipment etc. The planning shows the modular plan and the section plan of the storage space reflecting the shape and size of storage container, the action radius of carrier and the possibilities of space lease. The total floor area of the storage is 3,192$m^2$ consisting of 27 space. The total floor area of the pre-treatment/processing is 1,488$m^2$ consisting of 7 space. The total floor area of the loading/unloading is 329$m^2$ consisting of 4 space. The total floor area of each facility storage is 8,284$m^2$ including of public space 2,170$m^2$. Also this planning shows the preliminary design, "fundamental model design" for 5 rural government BTL project. Therefore, this result of planning will be the guidelines of the RFP(Request For Proposal) for the private sector company interested in this BTL project.

  • PDF

Performance Evaluation of Korean Power System for Developing the Planning Standards (계통계획기준 수립을 위한 한전계통의 성능평가)

  • Kook, Kyung-Soo;Oh, Tae-Kyoo;Kim, Tai-Hyun;Kim, Hak-Man;Bang, Min-Jae;Lee, B.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.203-205
    • /
    • 2001
  • This paper is part of an ongoing project of KEPCO; 'A Study on Criteria and Standards for Transmission System Planning', The objective of this project is to develop the standards and procedures for transmission system planning. This involves reviewing published literatures, other documents of existing criteria and procedures, and various case studies of advanced countries which are already under the competitive electricity industry. This paper presents the result of evaluating Korean Power System as a pre-study for developing the Planning Standards of Korean Power System. For this, WSCC/NERC's performance criteria for planning transmission system, and KEPCO's 'Long Term Transmission System Planning Criteria' are considered. By doing this, the level of performance criteria which should be applied to Korean Power System and the detailed procedures which would be used in system test were reviewed.

  • PDF

Study on the change in the Satisfaction Degree on the Residential Environment and the change in the Selection Tendency of the Residential Property - Targeting Seoul Residences - (주거환경 만족도와 주거선택요소 중요도 변화에 관한 연구 - 서울지역 거주자를 중심으로 -)

  • Kim, Joon-Hwan;Choi, Young-Moon
    • Journal of the Korean housing association
    • /
    • v.19 no.3
    • /
    • pp.31-38
    • /
    • 2008
  • Recently, Seoul residential real estate market showed a big change, especially in 2007. The residential property price in Seoul had been mainly affected by 5 provideces: Kangnam-gu, Seocho-gu, Songpa-gu, Gangdong-gu and Yangchun-gu, but these providences started to show the decrease in price while the other providences ironically showed the opposite direction. Therefore, this project was derived from this phenomenon recognition and the necessity as the new market trend requires. The pre-research was carried out with the point of social-population academic view, but this project provides the analysis on the new market trend by simplifying the complex valuation indexes, originated from the pre-research. In result, the aspects of the change could be categorized into time-manner classification and territorial-manner classification, in cope with the change in the satisfaction degree on the residential environment and the selection tendency of the residential property. Based on the the moving-preferred area criteria, the territorial classification was categorized into 3 areas: 5 providences, which showed the initial decrease in real estate price (area 1), the other Kangnam area (area 2), and Kangbuk area (area 3). The result illustrated the reasonable change in the satisfaction degree on the residential environment and the selection tendency of the residential property. This project was able to reach the following conclusion : Firstly, the housing development planning should be devised by the residential environment, including the view and the natural environment, not by the area. Secondly, the housing development planning in the other Kangnam area (area 2) and Kangbuk area (area 3) should embrace the business function, not the housing development only. Last, the housing development planning in Kangbuk area (area 3) should be able to enhance education and culture function and be connected by various transportation system. This project analyzes the change in the satisfaction degree on the residential environment and the selection tendency of the residential property. Thereafter, this project has the purpose of providing the aid in understanding of the basis of housing development information.

Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.