With recent attempts to improve quality and productivity, the prefabrication manufacturing system has been occupying an increasing share of the construction area. To minimize site work, material is more frequently being produced and partially assembled at a plant, and then installed at a site. For this reason, the production process is being divided and the materials are being delivered to the site after passing through multiple plants. With these changes in the production process, the materials delivery plan is becoming an important management point. In particular, as road transportation using trucks has a 71 percent share of the domestic transportation market, selecting the proper transportation path is important when delivering materials and equipment to a site. But the management system at the project design phase to calculate the delivery cost by considering the production process of the pre-fab material and the $CO_2$ emission at the material delivery phase is currently lacking. This study suggests a process design model for assembly production of the pre-fab material and transportation logistics based on carbon emission. The suggested model can be helpful to optimize the location of the intermediate plant. It is expected to be utilized as a basic model at the project plan and design phase when subcontractors make decisions on items such as materials procurement, selecting the production method, and choosing the location of the assembly plant.
With the increase of tall building construction, efforts for enhancing constructability are required from the pre-construction stage. Therefore, in this study, we proposed an evaluation method of constructability performance by performing construction engineering activities at the design phase. Based on some results of previous studies, we estimated the importance of design factors and categories influencing the constructability in each engineering activity related to temporary work and then presented a method for evaluating the constructability performance of design alternatives.
정부의 건설산업 혁신방안 중 기술혁신을 위한 주요과제의 하나인 시공책임형 CM 사업의 제도화를 위해 2017년부터 현재까지 시범사업이 활발하게 이루어지고 있지만, 시공이전단계 사업관리의 핵심인 GMP를 결정하는데 핵심도구인 설계VE와 관련한 기준 및 프로세스는 아직 정립되지 않은 실정이다. 이에 시공책임형 CM과 설계VE 관련 연구 및 운영실태, 그리고 사업참여자 인식조사를 통해 기존 설계VE 프로세스에 대한 문제점을 도출하고, 시공책임형 CM 사업에 적합한 설계VE 프로세스를 제안하고자 하였다. Schedule, Cycle, Process 등 3가지 측면에서 적용안을 제안하였으며 심층면접조사(FGI)를 통해 적절성과 적용성을 검증하였다. 본 연구의 결과는 향후 이루어질 발주기준 정립 및 법제화에 대한 기초자료로 활용될 수 있을 것으로 기대한다.
최근 시행되는 건설공사에서는 설계 및 시공과정에 소요되는 공사정보들을 점차 가상현실기반의 3D모델로 활용하는 사례들이 증대되고 있다. 본 논문에서는 개념 설계 단계에서 활용 가능한 가상현실기반의 레이어 객체 시뮬레이션 기능 방법론을 구성한 후, 완성된 시스템으로 구축하여 활용성을 검증하고 있다. 레이어 객체 시뮬레이션 시스템은 사용자가 지정한 임의 공사 순서대로 구조물을 가상공간에서 사전 시공하여 실제 시공시의 문제점을 사전에 검토가 가능하도록 한다. 이러한 방법론은 3D객체 기반의 가상건설 시스템 구축시 주요 기능으로 적용되어 효율적 공사관리가 가능하게 할 수 있다.
The 6th International Conference on Construction Engineering and Project Management
/
pp.284-288
/
2015
Recently, the mandate on utilizing BIM implemented by public institutions of many countries has great impact on the significantly increasing practices of BIM. The improvement of work efficiency and productivity, which is occurred by BIM adoption, depends on the consistency and accuracy of data. To maximize the benefit of BIM, the interests in BIM data quality have been enlarging all over the world. The BIM data quality pre-check, which is conducted by designer in the design phase, offers opportunities for quality improvement by continuously assessing BIM data. However, BIM quality pre-check is being conducted under arbitrary interpretation of users because of the absence of specific review factors and assessment methods for checking BIM quality. The purpose of this study is to establish an automated BIM quality pre-checking system to improve BIM design quality effectively and efficiently. It could be expected to meet the owner's requirements and to minimize the cost and time occurred additionally from revising and reproducing data by constructing consistency and accuracy of it.
Bridge construction cost estimates have generally been conducted by using historial unit-price(per meter or square meter). The traditional estimating method based on unit-price references can never completely reflect the specialty of cable supported bridge. In this paper, we have developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous suspension bridge with 2-pylons. First of all, we'd analyzed the design information (such as structural design report, blueprint and quantity) and the real cost data from the existing suspension bridges and derived the design variables of the bridges. We developed the BIM wizard that generates a suspension bridge model parametrically based on derived design variables. The principle material quantities of suspension bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. We have established the system that the construction cost can be estimated more specific than the traditional estimating method.
The 2th International Conference on Construction Engineering and Project Management
/
pp.424-432
/
2007
The last twenty-five years have seen dramatic improvements in and widespread use of IT to describe and document the work of the many disciplines involved in construction projects. Iran is a developing country and construction is a basic factor of developing too. Hence, the country needs to a special programming for construction of buildings, structures and infrastructures. Many parts of Iran are located in highly seismic zones and structures must be constructed safe e.g., according to recent seismic codes. In this paper opportunities of IT in construction industry of Iran are investigated in three categories. Pre-construction phase, construction phase and earthquake disaster mitigation are studied. Studies show that information technology can be used in these items for reducing the losses and increasing the benefits. Both government and private sectors must contribute to this strategic project for obtaining the best result.
The focus of this research was to devise a conceptual methodology for drone usage and to assess the viability of safety checklist items specific to drone application in safety oversight. The appraisal was grounded in a focus group interview involving professionals from construction management and safety fields. The proposed process was segmented into four stages: 1) pre-flight phase for flight plan development, 2) drone flight phase for safety condition inspection utilizing checklist items, 3) post-flight phase for visual asset analysis, and 4) documentation and management phase. Furthermore, the research scrutinized the applicability of 32 distinct safety checklist items for drone operations. The primary aim of this investigation was to probe the possible deployment of drones as part of construction safety inspections at work sites. However, it bears mentioning that subsequent research should strive to gather a more extensive sample size through questionnaire surveys, thereby facilitating quantitative analysis. Administering such surveys would yield more comprehensive data compared to a focus group interview, which was constrained by a limited participant count. In summation, this study lays a foundational groundwork for understanding the potential advantages and challenges associated with integrating drones into construction safety management.
본 연구는 2주탑 3경간 사장교의 사업기획 단계에서 3차원 모델정보에 기반하여 신속한 개략 공사비 및 물량 산정을 지원하는 시스템을 개발하였다. 우선, 기 설계된 사장교 설계정보(구조계산서, 도면, 수량)를 분석하여 설계변수를 도출하였다. 도출된 설계변수를 기반으로 매개변수적으로 사장교를 3차원 모델링하는 BIM Wizard를 개발하였다. BIM Wizard를 이용해 작성된 3차원 모델로부터 사장교의 주요 재료에 대한 수량을 직접 산출하며, 케이블 교량에 대한 단가 D/B와 산출된 수량을 연계하여 개략공사비를 산정할 수 있다. 결과적으로, 사업 초기단계에서 m당 혹은 $m^2$당 실적 평균공사비를 산출하는 재래적인 방식보다 더 구체화된 공사비를 산출할 수 있는 시스템을 구축하였다. 이로써, 우리는 사장교에 대해 입찰단계에서 가능한 신속하게 다양한 대안을 검토할 수 있을 것이다.
국내 건설시장 개방과 건설경기 침체에 따른 과당경쟁, 급속한 정보기술의 발달과 시시각각 변화하는 동태적인 사회 환경 등이 건설 환경을 급속하게 변화시키고 있으며, 이에 따라 건설사업에서의 리스크 또한 현저하게 증가하고 있다. 또한, 이러한 리스크를 다루는 리스크 관리가 사업의 성패와 부가가치 결정에 커다란 영향을 주고 있어 건설사업에서의 리스크 관리가 철실히 필요한 시점이다. 본 연구에서는 국내개발사업 사전기획단계에서의 제한된 정보를 이용하여 효과적으로 리스크를 관리 할 수 있도록 주요 리스크 인자 식별 및 분류를 통해 통계적 기법으로 중요도를 분석하고, 기획단계별 주요 리스크 인자를 분류하여 기존의 경험에 의존한 직관적이고 주관적인 리스크 관리를 보다 객관적으로 수행할 수 있도록 하는 기초를 마련하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.