• 제목/요약/키워드: Pre-Construction Phase

검색결과 94건 처리시간 0.026초

건설 프로젝트의 사업타당성 분석에 관한 연구 (A Feasibility Study of the Construction Project in Pre-Design Phase)

  • 노병옥;이상범;임남기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술논문발표회
    • /
    • pp.109-113
    • /
    • 2002
  • Urban public service is goods and activities which satisfy public demands for the political, social, economic, cultural activity and household affairs of individual or groups and which urban government supply with free of charge. In view of government, in addition to fairness of facilities location, location of such facilities are to be determined the respect to cost of locating facilities and developmental direction in the future. Therefore, it is necessary to study on feasibility. A feasibility study Is an effective tool in determining the decision of investment or not and the level of investment priority on Projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected four and two by consideration of facilities distribution and connection with others. Six proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. The finally, it is to study on economical efficiency. Net Present Value was came out ₩4.4billion by 20years and Inter Rate of Return showed up 11%. in addition, it offer various benefit by public facilities. In conclusion, this project is reasonable.

  • PDF

철골공사의 품질관리 업무 프로세스 모델 개발 (A Work Process Model for a Quality Management in Steel Frame Work)

  • 김종성;김형중;변은정;구교진;현창택
    • 한국건설관리학회논문집
    • /
    • 제8권3호
    • /
    • pp.150-158
    • /
    • 2007
  • 건축물이 고층화, 대형화되면서 철골구조를 기본골조로 채택하는 경우가 많아지고 있으며, 철골공사의 품질관리는 사전계획단계부터 이루어지며, 단계별 참여자간의 업무 구분 및 연계가 매우 중요하다 이에 본 연구는 철골공사의 품질관리를 보다 원활하게 수행하기 위하여, 기존 철골공사 품질관리업무를 기반으로 업무간 상호관계 및 입출력 정보를 고려한 품질관리 업무 프로세스 모델을 개발하고자 한다.

실내 포인트 클라우드 데이터 Downsampling의 Trade-off 분석을 통한 기초 연구 (A Basic Study on Trade-off Analysis of Downsampling for Indoor Point Cloud Data)

  • 강남우;오상민;류민우;정용일;조훈희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.40-41
    • /
    • 2020
  • As the capacity of the 3d scanner developed, the reverse engineering using the 3d scanner is emphasized in the construction industry to obtain the 3d geometric representation of buildings. However, big size of the indoor point cloud data acquired by the 3d scanner restricts the efficient process in the reverse engineering. In order to solve this inefficiency, several pre-processing methods simplifying and denoising the raw point cloud data by the rough standard are developed, but these non-standard methods can cause the inaccurate recognition and removal the key-points. This paper analyzes the correlation between the accuracy of wall recognition and the density of the data, thus proposes the proper method for the raw point cloud data. The result of this study could improve the efficiency of the data processing phase in the reverse engineering for indoor point cloud data.

  • PDF

제방겸용도로 건설에 따른 제방 안정성 해석에 관한 연구 (A Study on the Stability of Embankment Due to the Construction of Embankment Combined Use Road)

  • 김성남;이영우
    • 한국도로학회논문집
    • /
    • 제10권3호
    • /
    • pp.109-118
    • /
    • 2008
  • 본 연구에서는 현재 실존하는 제방을 대상으로 제방겸용도로 건설에 따른 안정성의 변화를 살펴보기 위해 건설단계별로 도로건설을 위한 성토 후, 겸용도로 건설 후 도로를 주행하는 차량에 의한 교통하중이 재하될 경우로 구분하여 안정성 변화를 분석하였다. 연구결과 겸용도로 건설을 위한 성토 후와 교통하중(DB-24)을 적용하였을 경우 모두 일반적인 안전율 기준인 1.3을 상회하고 있어 겸용도로 건설에 따른 제방의 안전은 확보되는 것으로 분석되어 제방겸용도로의 건설은 부지 확보 비용 절감을 위해 건설이 가능할 것으로 판단된다. 그러나 겸용도로의 건설로 인해 제방의 안전율 감소 현상이 발생하기 때문에 안정성에 대한 사전 검토가 충분히 이루어져야 할 것이다. 특히 안전율 감소가 가장 큰 경우는 비정상류 상태의 수위상승의 경우로 분석되어 하천제방과 같이 수위변화가 빈번한 경우에는 비정상류 해석으로 설계하는 것이 바람직하며 제내지의 사면경사는 기존제방과 동일한 1:2의 경사를 유지하도록 설계하는 것이 필요할 것으로 판단된다. 또한, 교통하중에 의한 안전율 감소현상도 발생하는 것으로 분석되어 겸용도로 건설 후 주행차량의 하중제한 등 유지 관리에도 지속적인 관심을 기울여야 할 것으로 판단된다.

  • PDF

환자안전보고 촉진 교육프로그램의 개발 및 평가 (Development and Evaluation of Patient Safety Reporting Promoting Education Program)

  • 김명수;김윤희
    • 한국산학기술학회논문지
    • /
    • 제13권1호
    • /
    • pp.284-295
    • /
    • 2012
  • 본 연구는 간호의 질을 향상시키기 위해 간호사를 위한 환자안전보고촉진전략을 개발하고 평가하기 위한 것으로, 구축-실행-평가단계로 진행하였다. 구축단계는 분석과 검증의 하위단계로 구성되는데, 분석단계에서는 문헌고찰과 현장연구의 단계로 구성되고, 검증의 단계는 두 명의 전문가에 의해 평가받는 과정을 거쳤다. 이 단계를 통해 환자안전보고시스템, 교육자료, 홍보계획, 보상으로 구성된 환자안전보고촉진전략을 개발하였다. 실행단계에서는 구축단계에서 개발된 내용을 일개 병원에서 근무 중인 간호사 51명을 대상으로 12주간의 중재 후, 활용 후 만족도, 스트레스인식, 업무성과정도를 전-후 점수를 비교하여 살펴보았다. 본 연구의 설계는 단일군 전후설계를 적용하였고 서술통계 및 paired t-test 를 SPSS WIN 18.0을 활용하여 분석하였다. 중재 후 업무성과는 3.62점에서 3.75점으로 유의하게 향상시켰다(t=2.653, p=.009). 반면 환자안전보고촉진전략의 활용이 대상자들의 직무 스트레스를 증가시킬 것이라는 가정 하에 중재 전-후 점수를 비교한 결과 중재 전 3.06점에서 중재 후 3.13으로 약간 증가하였으나 통계적으로 유의한 변화를 보이지 않았다(t=.785, p=.434). 따라서 본 연구에서 개발한 전략은 많은 임상환경에 적용할 수 있을 것이고 간호사를 위한 환자안전보고를 촉진하는데 도움을 줄 수 있는 프로그램이라 사료된다.

Development and Fabrication of Heating and Water Sparging Remediation System (HWSRS) for DNAPL-contaminated Groundwater Treatment

  • Lee, Ju-Won;Park, Won-Seok;Gong, Hyo-Young;Lee, Ae-Ri;Kim, Da-Eun;Baek, Seung-Chon;Lee, Jong-Yeol
    • 한국지하수토양환경학회지:지하수토양환경
    • /
    • 제18권6호
    • /
    • pp.32-37
    • /
    • 2013
  • The scope of this study was to develop, design, and build an ex-situ remediation system of using the heating and water sparging treatment for the highly volatile DNAPL (Dense Non-Aqueous Phase Liquid) contaminated groundwater, and to conduct pilot testing at the site contaminated with DNAPL. The TCE (Trichloroethylene) removal was at the highest rate of 94.6% with the water sparging at $70^{\circ}C$ in the lab-scale test. The pilot-scale remediation system was developed, designed, and fabricated based on the results of the lab-scale test conducted. During the pilot-scale testing, DNAPL-contaminated groundwater was detained at heat exchanger for the certain period of time for pre-heating through the heat exchanger using the thermal energy supplied from the heater. The heating system supplies thermal energy to the preheated DNAPL-contaminated groundwater directly and its highly volatile TCE, $CCl_4$ (Carbontetrachloride), Chloroform are vaporized, and its vaporized and treated water is return edback to the heat exchanger. In the pilot testing the optimum condition of the HWSRS was when the water temperature at the $40^{\circ}C$ and operated with water sparging concurrently, and its TCE removal rate was 90%. The efficiency of the optimized HWSRS has been confirmed through the long-term performance evaluation process.

사례 분석을 통한 턴키 프로젝트 실시설계 업무 관리방안 (Design Development Management in the Design-Build Project by Cast-Study)

  • 이황구;김영재;김경래;박찬식;신동우
    • 한국건설관리학회논문집
    • /
    • 제4권3호
    • /
    • pp.128-136
    • /
    • 2003
  • 턴키공사의 업무수행체계는 기본설계, 입찰, 낙찰, 실시설계, 계약, 시공, 사업물 인도와 같은 절차로 구성되어 있다. 턴키발주 공사의 프로세스 중 이러한 설계업무는 일괄계약자인 기존의 건설회사에서 담당하지 않은 생소한 부분의 업무이다 이 중 실시설계 적격자 선정이후단계에서 계약단계까지의 과정에 해당하는 실시설계단계에는 사업내용에 대한 구체적인 조정 및 최종결정과 관련된 업무가 존재하므로 사업성패에 상당히 중요한 단계로 여겨지고 있으나, 기존의 시공단계의 관리업무만을 수행하던 일괄 사업자에게는 현실적으로 다소 생소한 업무분야이다 현재 국내 턴키공사에서는 실시설계단계에 대한 체계적이지 못한 업무관리로 인해 설계변경 요청, 클레임 제기 등이 발생하고 있다. 이러한 원인은 턴키공사라는 실시설계업무에 대한 구체적 문제점 인식과 이에 대한 관리방안이 체계화되어 있지 못함에 기인한다. 따라서 본 연구에서는 턴키수행공사 기존 설계시공 일괄사업 관련문헌 및 선행 연구고찰을 통한 사례조사연구를 설계하고 이를 토대로 현재 공사 중인 현장에 대한 사례조사를 수행하였다. 사례조사 내용을 분석함으로써 현행 턴키공사의 실시설계 주요 관리업무 및 수행상의 문제점을 구체화하였으며, 실제 실시설계 관리업무 담당자들의 개선방향에 의견을 정리하고 이를 통한 실시설계 관리업무에 대한 개선방안을 제시하였다.

드론을 활용한 정보수집 및 아이디어 창출에 관한 연구 (A Study on Information Collection and Idea Creation Using Drones)

  • 조화니;유재원;최현
    • 대한토목학회논문집
    • /
    • 제44권1호
    • /
    • pp.117-124
    • /
    • 2024
  • 가치공학(VE; Value Engineering)은 최적의 생애주기 비용으로 최상의 가치를 실현하는 것으로 준비단계(Pre-Study), 분석단계(Study), 실행단계(Post-Study) 3가지 단계로 구성된다. 본 연구에서는 VE 준비단계 중 현장방문 시 정보수집 및 분석을 위한 방법을 제안하고자 한다. 드론을 활용하여 생성된 3차원 공간모델은 연구 대상지를 중심에서 또는 외부에서 다양한 각도로 관찰 및 분석을 할 수 있었다. 준비단계부터 현장 방문 시 미시적 관점에서만 가능했던 현장조사는 드론을 활용함으로써 연구 대상지역의 3차원 공간모델링으로 거시적인 관점에서 검토가 가능하였으며, 실제 관측한 공간정보 데이터를 이용하여 설계 VE 워크숍 중에도 실시간으로 정보를 확인할 수 있어 효율적이고 신뢰성 있는 VE 수행을 할 수 있었다.

친환경건축물 설계를 위한 Green VE 대상선정모델 (Subject Selection Model of Green VE for Sustainable Design)

  • 송창엽;문현석;현창택
    • 한국건설관리학회논문집
    • /
    • 제12권3호
    • /
    • pp.42-52
    • /
    • 2011
  • 최근 세계적으로 환경문제가 대두됨에 따라 모든 산업분야에서 환경부하를 감소시키기 위한 노력이 나타나고 있다. 특히 건축물이 환경에 미치는 양향은 절대적인 비중을 차지하고 있기 때문에 건축물의 전생애주기 동안에 에너지 절약과 생태환경보전을 위해 국가별로 친환경 건축물 인증제도를 운영하고 있다. 국내에서도 국토해양부와 환경부가 모든 시설물에 대한 친환경건축물 인증을 실시하고 있다. 특히 2010년부터 신축되는 모든 공공청사에 대해서 건물에너지효율 1등급의 취득을 의무화하고 있다. 효율적이고 체계적인 친환경건축물의 설계를 위해서는 설계 초기단계부터 친환경요소를 고려해야 하는 것이 필수적이다. 그러나 현재 친환경건축물 인증을 받기 위한 과정을 살펴보면, 실시설계가 거의 완료된 시점에서 친환경요소들을 고려함으로써 근본적인 친환경요소들을 설계에 적용하는데 어려움이 있다. 이러한 문제를 해결하기 위해, 기본 및 실시설계 Value Engineering에서 친환경적인 요소들을 고려하여 체계적인 친환경요소들을 고려한다면 효율적인 친환경건축물을 설계할 수 있을 것이다. 따라서 본 연구에서는 친환경건축물 인증기준과 기존의 VE 대상선정 기법을 분석하여 프로젝트에서 집중적으로 고려해야 하는 친환경적인 요소들을 선정하기 위한 Green VE 대상선정모델을 제안하고자 한다.

층경사각에 의한 횡변위를 고려한 비정형 고층건물의 횡변위 평가/보정 (Evaluation and Adjustment of Lateral Displacement of Complex-shaped RC Tall Buildings Considering the Displacement by Tilt Angle of Each Floor)

  • 김윤곤
    • 콘크리트학회논문집
    • /
    • 제27권5호
    • /
    • pp.551-558
    • /
    • 2015
  • 비정형 고층건물의 경우 편심중력하중에 의해 횡변위가 발생한다. 일반해석은 완공시점에 건물 조건을 기준으로 모든 하중을 고려하기 때문에, 시공중 부재 수직도 확보를 통해 각 단계별 보정량을 반영할 수 없어 골조자중에 의한 횡변위를 과대평가한다. 시공단계해석은 통상적인 시공과정에서 각 층마다 바닥평활도 및 기둥/벽체 수직도를 확보하는 것을 고려하여 타설이전에 발생하는 변형각을 보정하기 때문에 일반해석의 한계를 보완할 수 있다. 또한 계측을 통해 타설시점의 좌표를 설계좌표점으로 시공할 경우 각 시공단계에서 추가적인 횡변위보정(원점보정)이 가능하다. 횡변위는 고층부로 갈수록 급격히 증가하므로, 이러한 사전해석을 통해 합리적인 보정계획 수립이 가능하며, 이러한 보정에도 횡변위 관리기준를 초과하는 경우는 선보정 계획을 수립하여야 한다. 이때 사전해석의 불확실성 측면을 고려하여 선보정량을 결정하고, 실제 건물거동의 모니터링을 통해 선보정계획을 지속적으로 수정하여 건물수직도를 확보할 필요가 있다.