• Title/Summary/Keyword: Pre-Construction Phase

Search Result 94, Processing Time 0.024 seconds

Scalable Two Phases QoS Routing Scheme (확장가능한 2단계 QoS 라우팅 방식)

  • 김승훈
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.28 no.12B
    • /
    • pp.1066-1080
    • /
    • 2003
  • In this paper a scalable QoS routing scheme for distributed multimedia applications in a hierarchical wide area network is proposed. The problem of QoS routing is formulated as a multicriteria shortest path problem, known as NP-complete. The proposed hierarchical routing scheme consists of two phases. In Phase 1, every border node periodically pre-computes the QoS distance for the paths between every pair of border nodes in any level of domain hierarchy. This phase is independet of the QoS request from an application. In Phase II, distributed graph construction algorithm is performed to model the network as a graph by retrieving pre-computed QoS distances. The graph is constructed by the on-demand algorithm and contains a part of the network topology which is completely neglected or partially considered by existing routing schemes, thus maintaining more accurate topology information. By using retrieval approach rather than advertising one, no global QoS state information exchange among nodes is needed. In this Phase, distributed partition algorithm for QoS routing problem is also performed, thus eliminating virtual links on the hierarchically complete path.

Effect of rapid screening parameters on seismic performance of RC buildings

  • Ozmen, Hayri B.;Inel, Mehmet
    • Structural Engineering and Mechanics
    • /
    • v.62 no.4
    • /
    • pp.391-399
    • /
    • 2017
  • This study investigates the effects of soft story, short columns, heavy overhangs, pounding, and construction and workmanship quality parameters on seismic response of reinforced concrete buildings through nonlinear static and dynamic procedures. The accounted parameters are selected for their common use in rapid screening of RC buildings. The 4- and 7-story buildings designed according to pre-modern codes are used to reflect majority of the existing building stock. The relative penalty scores are employed in this study to evaluate relative importance of certain irregularities in the existing rapid seismic assessment procedures. Comparison of relative scores for the irregularities considered in this study show that the overall trend is similar. The relatively small differences may be accounted for regional construction practices. It is concluded that initial-phase seismic assessment procedures based on architectural features yield in somewhat similar results independent of their bases. However, the differences in the scores emphasize the proper selection of the method based on the regional structure characteristics.

Benchmarking of US General Contractor's Pre-construction Services for a CM at Risk Project to Improve Contractor's Competitiveness (책임형 CM사 경쟁력 확보 및 선진화를 위한 미국 건설사의 시공이전단계 서비스 벤치마킹 연구)

  • Lee, Chang-Jae;Lee, Sang-Hyo;Ahn, Yong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.3
    • /
    • pp.9-18
    • /
    • 2017
  • Construction Management at Risk (CMAR) is a project delivery method that enables CM companies to deliver projects at a Guaranteed Maximum Price (GMP). General contractors can apply CMAR from the initial design phase right through the construction phase to reduce risks and improve project performance. One of the major advantages CMAR offers is that it permits a general contractor to provide a comprehensive suite of preconstruction services, including estimating, a constructability review, value engineering, drawings and a specification review, green building, and Building Information Modeling(BIM), among others. However, general contractors in South Korea currently provide only limited preconstruction services using CMAR because few CMAR projects have yet been implemented in Korea and their experience using the method is therefore limited. This benchmark study of how foreign general contractors utilize CMAR in their projects, particularly during the preconstruction process, its purpose, and the roles and responsibilities of each of the different participants in successful implementations thus provides invaluable information and will serve as a useful guide for Korean contractors seeking to incorporate CMAR preconstruction services in their projects and thus improve the competitiveness of their construction businesses.

Seismic Performance Evaluation of Post-Northridge WUF-B Connections Frame (Post-Northridge WUF-B 접합부 골조의 내진 성능 평가)

  • Han, Sang Whan;Moon, Ki Hoon;Jung, Ji Eun;Lee, Ki Hak
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.6
    • /
    • pp.751-760
    • /
    • 2007
  • The purpose of this study is to evaluate the seismic performance of the frame which is assumed to be used with Welded Unreinforced Flange-Bolted web (WUF-B) connections and detailed in compliance with FEMA 350 recommended seismic design criteria. In FEMA 350, these types of connections are only valid for Ordinary Moment-Resisting Steel Frames (OMRSFs). For this purpose, based on test results, we proposed an analytical model for the Post-Northridge WUF-B connections with different panel zone strength ratios. Using the connection model, SAC Phase II three and nine-story frames were modeled and analyzed. From a nonlinear static pushover analysis, ductility, maximum strength, and the maximum interstory drift ratio were investigated for buildings with Post-Northridge details. Moreover, the maximum interstory drift ratio of each performance level (IO and CP) was also investigated through Incremental Dynamic Analysis (IDA). Analytical results were compared with those of buildings with either Pre-Northridge connection or ductile connections with no fracture. The analytical results showed that buildings with Post-Northridge WUF-B connections provide superior strength and interstory drift ratio capacity than buildings with Pre-Northridge WUF-B connections.

A Construction Safety Management Information Model using the Concept of Design for Safety (Design for Safety 개념을 활용한 건설안전관리정보모형)

  • Hong Sung-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.109-116
    • /
    • 2004
  • The DfS(Design for Safety) concept is expected to be widely used to promote pro-active construction safety management. It will open up tremendous opportunities for tile owner, designer, and constructor to prevent accidents in construction projects. Construction safety management using the DfS concept is regarded as the most difficult job for the owner, designer and contractor to undertake, because an information model using the DfS concept is not utilized as a tool to support pro-active construction safety management. Therefore, there has been a growing need toward an information model during the design process ai recent practice of construction safety management have emphasized the significance of the pre-construction phase of projects. The objective of this study is to develop the construction safety information model being composed of conceptual, logical, and computerized information models as the tool that helps owner, designer and contractor find out and communicate as well as understand the hazardous nature of the construction projects during the design process.

  • PDF

Uncertainty Factors affecting Bid Price from Pre-bid Clarification Document of Transport Construction Projects

  • Jang, YeEun;Kim, HaYoung;Yi, June-Seong;Lee, Bum-Sik
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.238-244
    • /
    • 2022
  • Civil projects are associated with many uncertainties because they involve a long duration, many resources, a large area, and many supply chains. Therefore, the price of a civil project is not simply proportional to the quantity and unit price of the item but has a variable value, including uncertainty risk. This study investigates the influence of the uncertainty factors in the pre-bid clarification document on bid price formation during the project bidding phase. To this end, civil projects from the California Department of Transportation (Caltrans) were used as research data. This study randomly selected fifty sample data from each of twelve counties from 2008-to 2020: six hundred. The authors observed that each project sample had 0 to n query cases due to uncertainty. Then, this study examined the project uncertainty cases and categorized them into the following four uncertainty factors: 'conflict' (UF1), 'impossibility' (UF2), 'lack' (UF3), and 'missing' (UF4). Under the extracting process, the cases are classified into four uncertainty factors. With the project not containing any uncertainty factors as a control group, the project containing these uncertainty factors was designated as an experimental group. After comparing the bidder's price, the experimental group's bid price was higher than the control group's. This result suggests that uncertainty factors in bid documents induce bidders to set a high bid price as a defense against uncertainty.

  • PDF

WDM Transmission Using Dispersion Compensation in Optical Transmission Links with Nonuniform Residual Dispersion per Span

  • Lee, Seong-Real
    • Journal of information and communication convergence engineering
    • /
    • v.9 no.6
    • /
    • pp.753-757
    • /
    • 2011
  • The possibility of implementing nonuniform residual dispersion per span (RDPS) in optical links with net residual dispersion (NRD) controlled by precompensation and postcompensation for 960 Gbps WDM transmissions is studied and discussed. The fiber optic communication links investigated in this paper consist of inline dispersion management (DM) for each fiber spans and optical phase conjugator (OPC) at mid-way of total transmission length in order to compensate for WDM signal distortions due to group velocity dispersion (GVD) and nonlinearities. It is confirmed that the effect of nonuniform RDPS distribution on system performance is not significant. It is also confirmed that the optimal NRD is obtained to be one of two values of +10 ps/nm or -10 ps/nm, which depend on the deciding of NRD controlled by precompensation or postcompensation, and the exact RDPS configurations. The effective NRD ranges resulting eye opening penalty (EOP) below 1 dB are independent on the exact RDPS distribution for relative low launch power. Therefore, results show the possibility of implementing the flexible optical links to expand network construction for WDM transmission of high bit-rate capability.

Evaluation of Capability for Practicing CM at Risk in Korea (국내 시공책임형 건설사업관리 수행을 위한 기업 역량 평가)

  • Ryu, HanGuk;Lee, Sangwon;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.79-87
    • /
    • 2020
  • The Korean domestic construction management at risk (CMAR) market is in the process of completing the pilot project execution under the leadership of the Ministry of Land, Infrastructure and Transport as of December 2019. The government starts practicing CMAR an alternative delivery method widely in order to diversify delivery methods and enhance construction technology. The CMAR market is thus expected to grow. This study was conducted to improve CMAR firms' capability by developing self-assessment tools for them to evaluate current capability more effectively. As a result of defining standard core capability and additional elements categorized by project execution phase and management area, and performing evaluation from the CMAR project participants, it was found that the general project management capability in the pre-design and procurement phase and quality management area was lower compared to the construction phase and other areas. In addition, the capability of cost management area was lower in spite of its high importance. Communication and coordination, process optimization, and target values achievement were at the initial level of capability and continuous improvement was required.

A Study of the Establishment of Small and Medium Sized Architectural Design Firm BIM Environment based on Virtual Desktop Infrastructure (가상 데스크톱 인프라(VDI) 기술을 활용한 중소규모 설계사의 BIM 사용자 별 데스크탑 자원 할당 전략에 관한 연구)

  • Lee, Kyuhyup;Shin, Joonghwan;Kwon, Soonwook;Park, Jaewoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.78-88
    • /
    • 2016
  • Recently BIM technology has been expanded for using in construction project. However its spread has been delayed than the initial expectations, due to the high-cost of BIM infrastructure development, the lack of regulations, the lack of process and so forth. In design phase, especially, collaboration based on BIM system has being a key factor for successful next generation building project. Through the analysis of current research trend about IT technologies, virtualization and BIM service, data exchange such as drawing, 3D model, object data, properties using cloud computing and virtual server system is defined as a most successful solution. In various industrial fields, cloud computing technology is utilized as a promising solution which can reduce time and cost of hardware infrastructure. Among the cloud computing technology, VDI is receiving a great deal of attention from it market as an essential part cloud computing. VDI enables to host multiple individual virtual machines by using hypervisor. It has an advantage to easy main device management. Therefore, this study implements a step-by-step user's DaaS by analyzing the desktop resource data of the workers from Pre-design phase to Schematic design, Design develop and Construction design phase. It also develops BIM environment based on test of BIM modeler and designers in architectural design firm. The goal of the study is to enable the cloud computing BIM server. It provides cost saving, high-performance quality of working environment and cooperation's convenience and high security when doing BIM work in small and medium sized architectural design firm.

Construction Claims Prediction and Decision Awareness Framework using Artificial Neural Networks and Backward Optimization

  • Hosny, Ossama A.;Elbarkouky, Mohamed M.G.;Elhakeem, Ahmed
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.11-19
    • /
    • 2015
  • This paper presents optimized artificial neural networks (ANNs) claims prediction and decision awareness framework that guides owner organizations in their pre-bid construction project decisions to minimize claims. The framework is composed of two genetic optimization ANNs models: a Claims Impact Prediction Model (CIPM), and a Decision Awareness Model (DAM). The CIPM is composed of three separate ANNs that predict the cost and time impacts of the possible claims that may arise in a project. The models also predict the expected types of relationship between the owner and the contractor based on their behavioral and technical decisions during the bidding phase of the project. The framework is implemented using actual data from international projects in the Middle East and Egypt (projects owned by either public or private local organizations who hired international prime contractors to deliver the projects). Literature review, interviews with pertinent experts in the Middle East, and lessons learned from several international construction projects in Egypt determined the input decision variables of the CIPM. The ANNs training, which has been implemented in a spreadsheet environment, was optimized using genetic algorithm (GA). Different weights were assigned as variables to the different layers of each ANN and the total square error was used as the objective function to be minimized. Data was collected from thirty-two international construction projects in order to train and test the ANNs of the CIPM, which predicted cost overruns, schedule delays, and relationships between contracting parties. A genetic optimization backward analysis technique was then applied to develop the Decision Awareness Model (DAM). The DAM combined the three artificial neural networks of the CIPM to assist project owners in setting optimum values for their behavioral and technical decision variables. It implements an intelligent user-friendly input interface which helps project owners in visualizing the impact of their decisions on the project's total cost, original duration, and expected owner-contractor relationship. The framework presents a unique and transparent hybrid genetic algorithm-ANNs training and testing method. It has been implemented in a spreadsheet environment using MS Excel$^{(R)}$ and EVOLVERTM V.5.5. It provides projects' owners of a decision-support tool that raises their awareness regarding their pre-bid decisions for a construction project.