Basic Study on the Assembly Process Design of Curtain-wall System for Minimization of Carbon Emission

  • Yi, June-Seong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.648-663
    • /
    • 2012
  • With recent attempts to improve quality and productivity, the prefabrication manufacturing system has been occupying an increasing share of the construction area. To minimize site work, material is more frequently being produced and partially assembled at a plant, and then installed at a site. For this reason, the production process is being divided and the materials are being delivered to the site after passing through multiple plants. With these changes in the production process, the materials delivery plan is becoming an important management point. In particular, as road transportation using trucks has a 71 percent share of the domestic transportation market, selecting the proper transportation path is important when delivering materials and equipment to a site. But the management system at the project design phase to calculate the delivery cost by considering the production process of the pre-fab material and the $CO_2$ emission at the material delivery phase is currently lacking. This study suggests a process design model for assembly production of the pre-fab material and transportation logistics based on carbon emission. The suggested model can be helpful to optimize the location of the intermediate plant. It is expected to be utilized as a basic model at the project plan and design phase when subcontractors make decisions on items such as materials procurement, selecting the production method, and choosing the location of the assembly plant.

Evaluation Method of Constructability Performance by Implementing Construction Engineering at the Design Phase of Building Construction (건축공사 설계단계에서의 시공엔지니어링 업무 수행에 따른 시공성 평가 방안)

  • Kim, Tae-Hoon;Cho, Kyu-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.128-129
    • /
    • 2018
  • With the increase of tall building construction, efforts for enhancing constructability are required from the pre-construction stage. Therefore, in this study, we proposed an evaluation method of constructability performance by performing construction engineering activities at the design phase. Based on some results of previous studies, we estimated the importance of design factors and categories influencing the constructability in each engineering activity related to temporary work and then presented a method for evaluating the constructability performance of design alternatives.

  • PDF

A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project (시공책임형 CM 사업의 GMP 결정를 위한 시공이전단계 설계VE 프로세스 적용방안 도출)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.56-64
    • /
    • 2022
  • Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.

Development of Layer Object Simulation System for Construction Project based on Virtual Reality (가상현실기반 건설공사의 레이어 객체 시뮬레이션 시스템 구축 연구)

  • Kang, Leen-Seok;Ji, Sang-Bok;Kim, Seol-Gi;Moon, Jin-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.957-960
    • /
    • 2007
  • The construction information used in the design and construction phases are being gradually changed by 3D objects based on virtual reality (VR). This study developed an algorithm and computerized system to visualize layer object simulation that can be used in the pre-design phase. Layer object simulation enables designer to review expecting problems, which can reappear in real construction site, by building construction structures in a VR system. This function can be used as an important tool of virtual construction system.

  • PDF

A study on the Development of BIM-based Quality Pre-checking System in Architecture Design Phase

  • Shin, Jihye;Choi, Jungsik;Kim, Inhan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.284-288
    • /
    • 2015
  • Recently, the mandate on utilizing BIM implemented by public institutions of many countries has great impact on the significantly increasing practices of BIM. The improvement of work efficiency and productivity, which is occurred by BIM adoption, depends on the consistency and accuracy of data. To maximize the benefit of BIM, the interests in BIM data quality have been enlarging all over the world. The BIM data quality pre-check, which is conducted by designer in the design phase, offers opportunities for quality improvement by continuously assessing BIM data. However, BIM quality pre-check is being conducted under arbitrary interpretation of users because of the absence of specific review factors and assessment methods for checking BIM quality. The purpose of this study is to establish an automated BIM quality pre-checking system to improve BIM design quality effectively and efficiently. It could be expected to meet the owner's requirements and to minimize the cost and time occurred additionally from revising and reproducing data by constructing consistency and accuracy of it.

  • PDF

Estimation Model for Approximate Construction Quantities of Suspension Bridge in Early Stage (사업기획단계에서의 현수교의 물량추정을 위한 모델연구)

  • Park, Weon-Tae;Chun, Kyoung-Sik
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.4
    • /
    • pp.24-29
    • /
    • 2015
  • Bridge construction cost estimates have generally been conducted by using historial unit-price(per meter or square meter). The traditional estimating method based on unit-price references can never completely reflect the specialty of cable supported bridge. In this paper, we have developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous suspension bridge with 2-pylons. First of all, we'd analyzed the design information (such as structural design report, blueprint and quantity) and the real cost data from the existing suspension bridges and derived the design variables of the bridges. We developed the BIM wizard that generates a suspension bridge model parametrically based on derived design variables. The principle material quantities of suspension bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. We have established the system that the construction cost can be estimated more specific than the traditional estimating method.

OPPORTUNITIES FOR IT IN CONSTRUCTION INDUSTRY OF IRAN

  • A. Hemmati;Kheyroddin
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.424-432
    • /
    • 2007
  • The last twenty-five years have seen dramatic improvements in and widespread use of IT to describe and document the work of the many disciplines involved in construction projects. Iran is a developing country and construction is a basic factor of developing too. Hence, the country needs to a special programming for construction of buildings, structures and infrastructures. Many parts of Iran are located in highly seismic zones and structures must be constructed safe e.g., according to recent seismic codes. In this paper opportunities of IT in construction industry of Iran are investigated in three categories. Pre-construction phase, construction phase and earthquake disaster mitigation are studied. Studies show that information technology can be used in these items for reducing the losses and increasing the benefits. Both government and private sectors must contribute to this strategic project for obtaining the best result.

  • PDF

Exploratory Study on the Process and Checklist Items for Construction Safety Inspection Utilizing Drones

  • Jung, Jieun;Baek, Mina;Yu, Chaeyeon;Lee, Donghoon;Kim, Sungjin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.3
    • /
    • pp.327-336
    • /
    • 2023
  • The focus of this research was to devise a conceptual methodology for drone usage and to assess the viability of safety checklist items specific to drone application in safety oversight. The appraisal was grounded in a focus group interview involving professionals from construction management and safety fields. The proposed process was segmented into four stages: 1) pre-flight phase for flight plan development, 2) drone flight phase for safety condition inspection utilizing checklist items, 3) post-flight phase for visual asset analysis, and 4) documentation and management phase. Furthermore, the research scrutinized the applicability of 32 distinct safety checklist items for drone operations. The primary aim of this investigation was to probe the possible deployment of drones as part of construction safety inspections at work sites. However, it bears mentioning that subsequent research should strive to gather a more extensive sample size through questionnaire surveys, thereby facilitating quantitative analysis. Administering such surveys would yield more comprehensive data compared to a focus group interview, which was constrained by a limited participant count. In summation, this study lays a foundational groundwork for understanding the potential advantages and challenges associated with integrating drones into construction safety management.

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

A Study on the Importance of Risk Factors for Effective Risk Management in the Pre-Project Planning Phase of the Development Projects (국내개발사업 사전기획단계에서의 효율적 리스크 관리를 위한 리스크 인자 중요도에 관한 연구)

  • Shin Kyu-Ho;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.75-86
    • /
    • 2002
  • The construction market is diversely changing because social environmental factors are rapidly transforming. Therefore, Construction projects are becoming complex and diverse. Furthermore, the risk being inherent in construction projects are increasing, and now people are considering about the risk management of construction projects in successfully handling the risk factor. The purpose of this study is first to comprehend the preparation of basic references for objective and systematic identification, categorization, and analysis of risk. Secondly it is to find the principle elements within the risk factors identified and categorized around planning process. Finally it is to manage objectively on the planning process, which forms a lot of uncertainty, in order to accentuate the importance about the risk of pre-planning process stage