Design, Implementation and Testing of HF transformers for Satellite EPS Applications

  • Zahran, Mohamed
    • Journal of Power Electronics
    • /
    • v.8 no.3
    • /
    • pp.217-227
    • /
    • 2008
  • The electric power subsystems (EPS) of most remote sensing satellites consist of a solar array as a source of energy, a storage battery, a power management and control (PMC) unit and a charge equalization unit (CEU) for the storage battery. The PMC and CEU use high frequency transformers in their power modules. This paper presents a design, implementation and testing results of a high frequency transformer for the EPS of satellite applications. Two approaches are used in the design process of the transformer based on the pre-determined transformer specifications. The transformer is designed based on an ETD 29 ferrite core. The implemented transformer consists of one center-tapped primary coil with eleven center-tapped secondary coils. The offline calculation results and measured values of R, L for transformer coils are convergence. A test circuit for measuring the transformer parameters like voltage, current and B-H hysteresis was implemented and applied. The test results confirm that the voltage waveforms of both primary and secondary coils were as desired. No overlapping occurred between the control signal and the transformer, which was not saturated during testing even during a short circuit test of the secondary channels. The dynamic B-H loop characteristics of the used transformer cores were measured. The sample test results are given in this paper.

Effect on Vibration According to the Load Capability and Elapsed Year of Power Transformer(154kV) in Operation (운전 중인 전력용 변압기(154kV)의 부하용량과 경년이 진동에 미치는 영향)

  • Kim, Young-Dal;Kim, Sung-Joong
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.2
    • /
    • pp.172-177
    • /
    • 2009
  • Most of the causes of the failures of power transformers in operations are mechanical defects due to vibration. To identify these causes, the vibration phenomenon was measured from the power transformers in operation in the substations under the Daejeon power transmission district office of KEPCO. The measurement was performed in a 6${times}$4 structure on one side of the transformer. The vibration of the measured points was presented in 2D and 3D, and analyzed. The results according to the period in use of the transformer and the load applied to the transformer were analyzed. These results will be used as basic data to establish the vibration standard for the power transformer, In addition, with a load capability and vibration phenomenon correlation and regression analysis to identify by way of function was reached. And the vibration phenomenon pass a years with changes and to analyze correlation, was estimated to bring in the function. And then through the analysis of power transformers to set standards based on vibration data was used to.

A Study on the Effective Utilization Plan through Field Investigation and Analysis with Power Transformers in Domestic Areas

  • Shin, Heung-Sik;Lee, Jae-Cheon;Bai, Seok-Myung;Kim, Seon-Gu;Kim, Jin-Tae;Kim, Gi-Hyeon;Jeong, Jong-Wook;Bang, Seon-Bae
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.4
    • /
    • pp.88-95
    • /
    • 2007
  • Korea is highly dependent on foreign countries for energy while at the same time having a high energy-consumption industrial structure. Therefore, logical improvements in energy use efficiency and nationwide energy saving are becoming more and more important in coping with the worldwidehigh oil prices and environmental issues such as listed in the Kyoto Protocol to the United Nations Framework Convention on Climate Change. Consequently, a study was conducted on the average annual load factor in domestic areas to set a reasonable and reliable technology standard plan for high-efficiency transformers. The average annual load factor in Korea was discovered to be 18.4[%] classified by industry. This factor is expected to be used in arranging a domestic standard for a minimum efficiency system for transformers, and in reviewing and supplementing the standard transformers plan for the High Energy-Efficiency Appliance Certification. The expected effect from the establishment of the technology standards plan for highly efficient transformers is the expansion of the manufacturing and distribution of highly efficient transformers that are suitable for domestic use. These will lead to electricity cost savings for users, strengthening the related industries' market competitive powers and the effective reduction of greenhouse gases on a national level by drastically reducing loss from transformers, which accounts for a large portion of the total electric supply losses.

Multi-Secondary Transformer: A Modeling Technique for Simulation - II

  • Patel, A.;Singh, N.P.;Gupta, L.N.;Raval, B.;Oza, K.;Thakar, A.;Parmar, D.;Dhola, H.;Dave, R.;Gupta, V.;Gajjar, S.;Patel, P.J.;Baruah, U.K.
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.3 no.1
    • /
    • pp.78-82
    • /
    • 2014
  • Power Transformers with more than one secondary winding are not uncommon in industrial applications. But new classes of applications where very large number of independent secondaries are used are becoming popular in controlled converters for medium and high voltage applications. Cascade H-bridge medium voltage drives and Pulse Step Modulation (PSM) based high voltage power supplies are such applications. Regulated high voltage power supplies (Fig. 1) with 35-100 kV, 5-10 MW output range with very fast dynamics (${\mu}S$ order) uses such transformers. Such power supplies are widely used in fusion research. Here series connection of isolated voltage sources with conventional switching semiconductor devices is achieved by large number of separate transformers or by single unit of multi-secondary transformer. Naturally, a transformer having numbers of secondary windings (~40) on single core is the preferred solution due to space and cost considerations. For design and simulation analysis of such a power supply, the model of a multi-secondary transformer poses special problem to any circuit analysis software as many simulation softwares provide transformer models with limited number (3-6) of secondary windings. Multi-Secondary transformer models with 3 different schemes are available. A comparison of test results from a practical Multi-secondary transformer with a simulation model using magnetic component is found to describe the behavior closer to observed test results. Earlier models assumed magnetising inductance in a linear loss less core model although in actual it is saturable core made-up of CRGO steel laminations. This article discusses a more detailed representation of flux coupled magnetic model with saturable core properties to simulate actual transformers very close to its observed parameters in test and actual usage.

Aging Test of 20kVA Amorphous Core Transformer by Loading Back Method (부하반환법에 의한 20KVA 비정질 변압기의 경년열화 연구)

  • 민복기;송재성;정영호;임정재
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.43 no.2
    • /
    • pp.278-285
    • /
    • 1994
  • Aging test was done by loading back method for 20kVA amorphous core transformers manufactured by Hyosung Industries Co. and korea Electric Power Corporation. Iron losses, copper losses and insulation oil temperatures of the transfromers was measured for all the testing period. Expected life of amorphous core transformers on the basis of the degradation of the insulators was 46 years at 100% load, and 2.4 years at 130% load. Average temperature rising of transformer oil of amorphous core transformers was higher than that of silicon steel core transformers. Hence lowering the oil temperature by optimized design is needed for improving the expected life of the amorphous transformers.

  • PDF

A study on development of the standard PAD-mounted type Transformer (표준형 지상변압기 개발에 관한 연구)

  • 조국희;김광화;양태권;홍원식;조양섭;김양태
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 1997.10a
    • /
    • pp.74-77
    • /
    • 1997
  • As underground distribution systems to be operated in downtown have more merits than overhead distribution system, underground distribution systems are being increased. But when pad-mounted transformers have troubles, reptures and fires can be occurred. We think that this makes accidents and power failures of bulidings and generates malaise and a great economic loss. In order to increase the reliability of pad-mounted transformers, we have investigated transformers and understood their failure mechani는. Therefore, we would have objectives and necessities of this study to improve quality and operating condition and install switches to be able to check and maintain transformers and optimize protection devices and increase cooling effect in pad-mounted transformers.

  • PDF

Development on a Vibration Reducing Element for the Large Transformers (대형 변압기 방진장치개발)

  • Lee, Jun-Shin;Lee, Wook-Ryun;Son, Seok-Man;Lee, Sang-Guk
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.11a
    • /
    • pp.259-262
    • /
    • 2005
  • The large transformers used in the electric power company become targets of public complaints because of those characteristics generating high-level noise. Reducing vibration level is the basis of noise control for the large transformers. For this reason, a vibrating reducing element is developed for the large transformers with a sub-element enduring seismic movement. Large attenuation of vibration is achieved by applying the element to the large transformers in a substation.

  • PDF

Operation Analysis of Novel UPFC without Series Injection Transformers (직렬주입변압기가 없는 새로운 UPFC의 동특성 분석)

  • 백승택;한병문
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.52 no.12
    • /
    • pp.641-648
    • /
    • 2003
  • This paper proposes a novel UPFE based on H-bridge modules, isolated through single-phase multi-winding transformers. The dynamic performance of proposed system was analyzed by simulation with EMTDC, assuming that the UPFC is connected with the 138-kV transmission line of one-machine-infinite-bus power system. The proposed system can be directly connected to the transmission line without series injection transformers. It has flexibility in expanding the operation voltage by increasing the number of H-bridge modules.

Investigation of the Preventive Diagnostic Criteria for Power Transformer (전력용 변압기 예방진단 기준치 검토)

  • Kweon, D.J.;Koo, K.S.;Kang, Y.W.;Woo, J.W.;Kwak, J.S.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.592-596
    • /
    • 2005
  • The preventive diagnostic system prevents transformers from power failure by giving alarm and observing transformers in service. And it helps to establish the plan for optimum maintenance of transformer as well as to find location or cause of fault using accumulated data. KEPCO has adopted the preventive diagnostic system at nine 345kV substations since 1997. Techniques for component sensors of preventive diagnostic system were settled but diagnostic algorithm, diagnostic criteria and practical use of accumulated data are not yet established. This paper, to build up the base of preventive diagnostic algorithm for the power transformer, investigated the preventive diagnostic criteria for power transformer.

  • PDF

The Improvement of NGR for Power Transformer Open Circuit Protection (전력용변압기 단선 보호용 NGR 성능 개선)

  • Kang, Y.W.;Shim, E.B.;Kwak, J.S.
    • Proceedings of the KIEE Conference
    • /
    • 2004.11d
    • /
    • pp.83-88
    • /
    • 2004
  • As the electric system is getting larger to meet the increasing demand for electric power, the rating of power apparatus is becoming inevitably higher in its working voltage and larger in its capacity. According to KEPCO reports, power transformers in the KEPCO system have undergone troubles such as winding short insulation breakdowns every year since 1981. the cause of this troubles were high one line grounding fault currents in KEPCO systems that had direct grounding systems. KEPCO has installed the NGR(neutral grounding reactor) to lower this fault current and reduced winding short insulation breakdowns in power transformers. But when a circuit breaker opened a no load bus, some trips of circuit breakers for protecting transformer have occurred by mal-operation of 59GT(overvoltage ground relay) that detect disconnection of NGR. Therefore, in this paper, we analyzed the cause and examined the effect of time delav circuit to prevent wrong operation of 59GT.