This paper is to introduce the R&D project called "System Protection with emphasis on Power System Stability". The principal objective of this project is protection aids to system stability. The objects of this project arc as follows. First, drawbacks of classical under frequency load shedding and implementation issues of the rate-of-change of frequency will be described. Secondly, the project discusses the possibilities of voltage instability in power system and how this risk will affect protective relays in real system. Lastly, special protection system is designed to preserve system stability for KEPCO.
Under frequency load shedding (UFLS) is an effective way to prevent system blackout after a serious disturbance occurs in a power system. A novel centralized adaptive under frequency load shedding (AUFLS) scheme using the synchronous phase measurement unit (PMU) is proposed in this paper. Two main stages are consisted of in the developed technique. In the first stage, the active power deficit is estimated by using the simplest expression of the generator swing equation and static load model since the frequency, voltages and their rate of change can be obtained by means of measurements in real-time from various devices such as phase measurement units. In the second stage, the UFLS schemes are adapted to the estimated magnitude based on the presented model. The effectiveness of the proposed AUFLS scheme is investigated simulating different disturbance in IEEE 10-generator 39-bus New England test system.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.55
no.1
/
pp.1-5
/
2006
In this paper, the frequency estimator and DFT filter gain compensation for UFR(Under Frequency protection Relay) is introduced. Due to the sudden appearance of generator loads or faults in power system, the frequency is supposed to deviate from its nominal value. Because a frequency calculation is based on phase information, it needs sufficient sampling data to figure out a precious frequency. Therefore the frequency measurement for UFR needs excellent qualities such as high speed and precision with low sampling frequency Authors propose the frequency estimator which compares the vector differences and the DFT filter gain compensation which identifies DFT filter error and correct it. Using the frequency estimator and compensation, UFR which has the 0.01[ms] calculation delay and 0.003[Hz] measurement error is implemented with digital processor.
The Transactions of The Korean Institute of Electrical Engineers
/
v.66
no.11
/
pp.1554-1560
/
2017
Prepare a lose of 765kV transmission route in power system operation condition, there are some Special Protection Scheme(SPS)s in Korean power system. These SPS can make some preselected generators are tripped to avoid generator overspeed. Because of many of the new large power plants are installed to existing power generation sites due to the siting problem, the number of generator tripped by SPS should be increased. But that can be a cause of system frequency change under the Under Frequency Relay(UFR) 1st pickup level 59.0Hz. Therefore generation constraint should be considered until new transmission lines are installed. In this paper, we propose the ESS application for generation constraint mitigation by frequency damping control of ESS. To analysis an effect of ESS application, we use PSS/E dynamic simulation tool, CBEST model and controller model. The proposed ESS application is applied to the empirical Korean power system.
With long time setting, zone 3 impedance relays are considered insensitive to power swings, and their operation condition during power swings is seldom analyzed. Instead of ti me-consuming simulation to the swing loci, their operation condition is directly quantified by polynominal functions in this paper to find the critical swing angle and frequency for relay operation under different relay settings and system parameters. It is found: (1) the swing loci are more densely populated inside than outside of the protection region, which corresponds to long residence time and possible relay operations; (2) the relays may be sensitive to load encroac hments and stable power swings with different relay settings and system parameters; (3) the critical swing frequency may be in the range of low-frequency power swings.
In this paper, the frequency compensator for digital protective relay is introduced. Due to sudden appearance of generation-load or fault in power system, the frequency can deviate from its nominal value. The Orthogonal filter adopted to digital protective relay is exposed to the problem. Therefore, the frequency variation makes a difficult to protective function and power measurement in digital protective relay. The essential property of the proposed algorithm presented is its outstanding immunity to both signal orthogonal component magnitudes and DFT filter gain variations which ensures below 0.05Hz accuracy of estimation. Additionally, the proposed method has excellent characteristics with low signal sampling rate. Based on the frequency estimation, author design under frequency protection relay for generator and verifies its performance with several experimental tests.
Song, Seung-Heon;Choi, Woo-Yeong;Gwon, Han-Na;Kook, Kyung Soo
The Transactions of The Korean Institute of Electrical Engineers
/
v.68
no.1
/
pp.1-7
/
2019
Due to the highly concentrated power plants integrated through the limited transmission lines in Korea, a Special Protection System(SPS) has been applied to stabilize the power systems by instantly tripping the pre-determined generators in a large-scaled power plant when a fault occurs on the drawing transmission lines. Moreover, power outputs of those generators are constrained to avoid any activation of Under Frequency Load Shedding(UFLS) even after those generators are tripped by SPS action. For this, this paper proposes a method for calculating the required capacity of Energy Storage System(ESS) expected to relieve the operating constraints to generators using its fast response for controlling power system frequency. The proposed method uses the generator acceleration energy to derive the stable condition during the SPS action. In addition, its effectiveness is verified by the case studies adopting actual SPS operations in Korean power systems.
International Journal of Internet, Broadcasting and Communication
/
v.7
no.2
/
pp.90-95
/
2015
This paper describes IEC 61727 standard of Photovoltaic (PV) systems -Characteristics of the utility interface. IEC 61727 standard tests include utility compatibility and personnel safety and equipment protection of PV inverter performance functions. Especially utility compatibility part includes test items of 1) voltage, current and frequency, 2) normal voltage operating range, 3) flicker, 4) DC injection, 5) normal frequency operating range, 6) harmonics and 7) waveform distortion, 8) power factor of PV inverter. Also personnel safety and equipment protection part includes test items 1)loss of utility voltage, 2)over/under voltage and frequency, 3)Islanding protection, 4)response to utility recovery, 5)earthing, 6)short circuit protection, 7)Isolation and switching of PV inverter. In this paper, each item of IEC 61727 standard test is studied and analyzed and finally full tested by PV inverter performance function.
Park, Chul-Won;Shin, Dong-Kwang;Kim, Chul-Hwan;Kim, Hak-Man;Kim, Yoon-Sang
Journal of Electrical Engineering and Technology
/
v.6
no.4
/
pp.439-446
/
2011
Frequency is an important operating parameter for the protection, control, and stability of a power system. Thus, it must be maintained very close to its nominal frequency. Due to the sudden change in generation and loads or faults in a power system, however, frequency deviates from its nominal value. An accurate monitoring of the power frequency is essential for optimum operation and prevention of wide area blackout. Most conventional frequency estimation schemes are based on the DFT filter. In these schemes, the gain error could cause defects when the frequency deviates from the nominal value. We present an advanced frequency estimation technique using gain compensation to enhance the DFT filter-based technique. The proposed technique can reduce the gain error caused when the frequency deviates from the nominal value. Simulation studies are performed using both the data from EMTP-RV software and the user-defined arbitrary signals to demonstrate the effectiveness of the proposed algorithm. Results show that the proposed algorithm achieves good performance under both steady state tests and dynamic conditions.
Background: We are developing L-band and S-band microwave dielectric absorption systems aiming novel dosimetry using DNAs, such as plasmid DNA and genomic DNA, and microwave technology. Materials and Methods: Each system is composed of a cavity resonator, analog signal generator, circulator, power meter, and oscilloscope. Since the cavity resonator is sensitive to temperature change, we have made great efforts to prevent the fluctuation of temperature. We have developed software for controlling and measurement. Results and Discussion: By using this system, we can measure the resonance frequency, f, and ${\Delta}Q$ (Q is a dimensionless parameter that describes how under-damped an oscillator or resonator is, and characterizes a resonator's bandwidth relative to its center frequency) within about 3 minutes with high accuracy. Conclusion: This system will be expected to be applicable to DNAs evaluations and to novel dosimetric system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.