• 제목/요약/키워드: Power system construction

검색결과 1,650건 처리시간 0.044초

원자력 발전소 RCB 외벽 거푸집 1단 타설 높이별 시공성 분석 (Analysis of Construction RCB Exterior Wall Formwork Placing High on Nuclear Power Plant)

  • 송효민;신윤석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.205-206
    • /
    • 2014
  • It is very important to reduce the construction duration of the Reactor Containment Building (RCB) when considering the more than 50 months on average from concrete placement to completion. The purpose of this study attempts to evaluate the single-stage workability of the system given a change in the height of the setting of RCB exterior wall formwork to be used in nuclear power plant construction. As a result of this study, it is possible height of 3.5m~4m uses formwork when analyzing the construction period and material costs an increase in formwork by concrete lateral pressure, to ensure the workability of the RCB exterior wall formwork. Through this study, I want to provide as basic data for the improvement of workability and RCB shortening the construction period.

  • PDF

Research of Circuit Working Construction Elevator with Single-guide Rail and Multi-cages

  • Kun Zhang;Kaiqiang Wang;Di Li;Qing Sun;Zhen Ye;Wei Liu
    • 국제초고층학회논문집
    • /
    • 제11권2호
    • /
    • pp.137-144
    • /
    • 2022
  • As one of the most important vertical transportation equipment in super high-rise buildings, the construction elevator directly affects the project period, cost, and effectiveness. The paper proposes a new construction elevator with single-guide rail and multi-cages. It can solve the problems of single construction elevator capacity shortage and efficacy decrease with height reduction, the occupancy of plan and elevation position of multiple construction elevators, and extension of total construction period by cycling operation of multi-cages on a single-guide rail. The paper focuses on the design and research of the main components of the equipment, such as the rotating guide rail mechanism, vertical bearing mast tie system, segmented electrical power supply system, group control scheduling system, and safety anti-collision system.

굴착기의 음향파워레벨 회귀분석 (Regression Analysis of an Excavator Sound Power Level)

  • 구진회;이재원;서충열;장성기;최경희;한진석
    • 한국소음진동공학회논문집
    • /
    • 제22권3호
    • /
    • pp.203-207
    • /
    • 2012
  • The noise emitted from an excavator has long been a cause of environmental disputes, while causing displeasure to the nearby residents. So, the ministry of environment adopted the construction machinery noise labeling system to encourage the construction machinery manufacturing companies to develop the low noise construction machinery voluntarily. But, as the quality of life improves, a growing number of people desire the comfortable and quite environment to live in. Under the situation, noise from the construction machinery has been a major cause for stress and complaints. When the noise dispute happened in the construction site, the sound pressure level of the construction machinery like a excavator was measured at the lot boundary of the noise victim's residence to judge how much noise damage occur. But the sound pressure level of the construction machinery is measured differently according to the acoustic environment of construction site and the measuring position, respectively, which makes it difficulty to judge whether the noise damage occur or not. As the sound power level of noise source is not affected by the acoustic environment of construction site and the measuring position, if we use the information of the sound power level, it will be easy to judge whether the noise damage occur and to establish the soundproofing measures. Therefore, we derive the sound power level regression model of the excavator to judge whether the noise emitted from the excavator damages to residents near the construction site. Also, the sound power level regression model of the excavator drawn in this paper will help construction companies to plan the noise reduction program in the construction sites.

전력선 통신 및 제어기능을 구비한 원격 밸브 제어시스템 개발 (Development of Remote Valve Control System with Power Line Communication)

  • 문형순;김종철;이병열;김용백;김지온
    • 대한조선학회 특별논문집
    • /
    • 대한조선학회 2009년도 특별논문집
    • /
    • pp.71-79
    • /
    • 2009
  • The world-wide ship construction market is forecast that the considerable portion of shipbuilding and oceanic plant industry will be transferred consequently in China after 5 or 10 years. This point of view where the Korean ship construction industry seizes the initiative from the world-wide ship construction/oceanic field, we must cultivate technical power of base technology, and focus our interests on the development of core parts. In this study, our proprietary remotely operated valve actuator system with power line technology was developed to enhance the installation and commissioning process by our own technology. This paper describes the new design and functions of the remotely operated valve system for shipbuilding and offshore market especially for FPSO.

  • PDF

태양열 화학반응 복합발전시스템의 설계 및 시공 사례 (Design and Construction Experiences of Solar Thermal Chemical Reaction Hybrid Power Generation)

  • 이상남;강용혁;김진수;윤환기;유창균;김종규
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2007년도 춘계학술대회
    • /
    • pp.688-692
    • /
    • 2007
  • Solar thermal power generation allows additional benefits of cheap thermal storage and easy hybridization with other fossil fuel-driven power generation. KIER has been performing the project for solar thermal chemical reaction hybrid power generation. The project is to build and operate the first solar thermal chemical reaction hybrid power generation system in Korea. For concentrating solar thermal energy $m^2$ dish type concentrator was adapted and a heliostat is installed for reflecting horizontal insolation to the dish concentrator. At the moment building the dish concentrator including mirror and heliostat with sun tracking system was completed and it's performance are being closely evaluated. This paper will introduce some detailed designs and construction procedures which we have experienced so far.

  • PDF

Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

플로우배터리 충방전을 위한 BMS의 설계 및 운용 (A Design and Operation of Battery Management System for Charge and Discharge Flow Battery)

  • 주재연;조영훈;최규하
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2014년도 추계학술대회 논문집
    • /
    • pp.15-16
    • /
    • 2014
  • This paper proposed a construction of BMS to adopt energy storage system using flow battery. To operate flow battery system with BMS, there are motor drive system to pump electrolyte up. And it needs sensors to check leaking and temperature. The proposed system is verified by experiment.

  • PDF

슈퍼컴퓨터 시스템을 위한 무정전 전원공급 시스템의 구축 (The Construction of the UPS system for supercomputer system)

  • 성진우;우준;김성준;최윤근;홍태영;이영주;장지훈;이상동
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2009년도 춘계학술대회 논문집
    • /
    • pp.462-465
    • /
    • 2009
  • This study described the design and construction of uninterruptible power supply(UPS) system for supercomputering system. KISTI's supercomputer system is served for all 24 hours, and power be achieved in stable voltage and frequency range. We analyzed the electric power usage for 4 years, and we considered cost and stability and we contructed UPS for supercomputer system.

  • PDF

종합건설회사의 품질경영시스템 적용사례연구;H건설 사례 중심으로 (A Case Study of Quality Management System Program in General Contractor)

  • 양기환
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.588-592
    • /
    • 2006
  • 국내 산업 전반에 걸친 정보화 추세는 건설산업에도 예외가 될 수 없지만, 급속하게 전파되고 있는 인터넷의 활용을 통하여 효율적인 건설품질관리업무를 수행하고 있는 건설업체는 몇몇 대형건설업체에 불과하다. 따라서 본 연구는 국내 H건설의 품질정보관리시스템(QIMS)의 구축사례를 알아보고, 이러한 시스템의 활용을 통하여, 향후 건설품질경영시스템(CQMS)이 정착되고 발전되어서 국내건설산업 전체가 국제적으로 품질경쟁력을 인정받는 계기가 될 수 있는 기반을 제시하고자 한다.

  • PDF