• Title/Summary/Keyword: Power substations

Search Result 232, Processing Time 0.025 seconds

A Study on Long-Term Spatial Load Forecasting Using Trending Method (추세분석법에 의한 영역의 장기 수요예측)

  • Hwang Kab-Ju;Choi Soo-Keon
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.11
    • /
    • pp.604-609
    • /
    • 2004
  • This paper suggests a long-term distribution area load forecasting algorithm which offers basic data for distribution planning of power system. To build forecasting model, 4-level hierarchical spatial structure is introduced: System, Region, Area, and Substation. And, each spatial load can be decided proportional to its portion in the higher level. This paper introduces the horizon year loads to improve the forecasting results. And, this paper also introduces an effective load transfer algorithm to improve forecasting stability in case of new or stopped substations. The proposed model is applied to the load forecasting of KEPCO system composed of 16 regions, 85 areas and 761 substations, and the results are compared with those of econometrics model to verify its validity.

The first installation of long-distance underground transmission line with 345kV XLPE Cable in Korea (장거리 345kV XLPE 케이블 지중송전선로의 준공)

  • Shin, H.D.;Park, K.R.
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.376-378
    • /
    • 2003
  • Since the first underground transmission line of Korea was installed between Danginri and Yongsan substations in 1974, the two types of underground transmission power cables, oil-filled and XLPE, have been applied for underground transmission lines. As the manufacturing technologies of XLPE cable have been improved and the simplicity of installation and maintenance has been focused on, the installations of XLPE cables have been largely increased since the mid 1990's. For the first time, in Korea, the 345kV XLPE cable was installed between Youngseo and Youngdeungpo substations in 2003, June. So, this paper introduces the project profile, the design of cable and its accessory, the cable system design, installation and site test.

  • PDF

Algorithm Development for Improving Output Characteristics of Thyristor Dual Converter with AC Input Voltage Variation (교류 입력 전압 변동에 따른 사이리스터 듀얼 컨버터의 출력 특성 개선을 위한 알고리즘 개발)

  • Kim, Sung-An;Han, Sung-Woo;Cho, Yun-Hyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.9
    • /
    • pp.1437-1443
    • /
    • 2017
  • Electric energy is consumed or regenerated according to an operation of electric rail cars in urban railway power substations. A thyristor dual converter system is used to deal with the electric energy. Since the AC input voltage of power substations is $22.9kV{\pm}10%$, the magnitude of the AC voltage fluctuates according to load conditions, so the secondary side voltage of the DDY transformer also fluctuates. In the thyristor dual converter, the response characteristics of the DC output voltage and the DC output current are changed based on an initial firing angle in the cross mode conversion between the forward mode and the reverse mode. Therefore, this paper proposes the initial firing angle tracking algorithm considering fluctuation of the AC input voltage. The effectiveness of the proposed algorithm is verified by a simulation compared with the conventional algorithm.

A Study on the Cooling Characteristic of a 154kV Less-Flammable Power Transformer (154kV 방재형 난연 변압기 냉각특성에 관한 연구)

  • Park, J.H.;Oh, W.K.;Ha, Y.S.
    • Proceedings of the KIEE Conference
    • /
    • 2001.10a
    • /
    • pp.61-64
    • /
    • 2001
  • Demand for development of 154kV Less-Flammable Power transformer is now increasing greatly instead of a oil-immersed transformer for preventing disasters and Less-flammability of substations. The most important point in developing Less-flammable transformer is cooling system. This paper describes the study on cooling characteristic of Less-flammable transformer.

  • PDF

Development of Operation and Control Technology of Energy Storage System for Frequency Regulation and Operation by Grid Connected Automatic Control (주파수조정용 에너지저장장치 운전제어 기술의 개발과 계통연계 자동제어 운전)

  • Lim, Geon-Pyo;Choi, Yo-Han;Im, Ji-Hoon
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.65 no.4
    • /
    • pp.235-241
    • /
    • 2016
  • Grid-connected, large-capacity energy storage systems (ESS) can be used for peak load supply, frequency regulation, and renewable energy output smoothing. In order to confirm the capability of battery ESS to provide such services, 4MW/ 8MWh battery ESS demonstration facility was built in the Jocheon substation on Jeju Island. The frequency regulation technology developed for the Jocheon demonstration facility then became the basis for the 28MW and 24MW frequency regulation ESS facilities installed in 2014 at the Seo-Anseong and Shin-Yongin substations, respectively. The operation control systems at these two facilities were continuously improved, and their successful commercialization led to the construction of additional ESS facilities all over Korea in 2015. In seven (7) locations nationwide (e.g., Shin-Gimje and Shin-Gyeryeong), a total of 184 MW of ESS had been commercialized in 2016. The trial run for the new ESS facilities had been completed between April and May in 2016. In this paper, results of the trial run from each of the ESS facilities are presented. The results obtained from the Seo-Anseong and Shin-Yongin substations during a transient event by a nuclear power plant trip are also presented in this paper. The results show that the frequency regulation battery ESS facilities were able to quickly respond to the transient event and trial run of ESS is necessary before it is commercialized.

Control Algorithm of Thyristor Dual Converter Power System for Railway Power Substations (철도 변전설비를 위한 싸이리스터 이중 컨버터 전력 시스템의 제어 기법)

  • Han, Sung-Woo;Lee, Chang-Hee;Kim, Young-Woo;Moon, Dong-Ok
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.20 no.6
    • /
    • pp.573-579
    • /
    • 2015
  • A control algorithm of thyristor dual converter power system is proposed in this study for a railway power substation. The thyristor dual converter can use regenerative power without an additional system using control algorithm. An autonomous voltage and mode change method is also proposed to provide uninterrupted power to the railway. A 10 kW reduced model of the thyristor dual converter power system is built and tested to verify the validity of the proposed control algorithm.

Implementation of Inverter Systems for DC Power Regeneration

  • Kim Kyung-Won;Yoon In-Sic;Seo Young-Min;Hong Soon-Chan;Yoon Duck-Yong
    • Proceedings of the KIPE Conference
    • /
    • 2001.10a
    • /
    • pp.126-131
    • /
    • 2001
  • This paper deals with implementation of inverter systems for DC power regeneration, which can regenerate the excessive DC power from DC bus line to AC supply in substations for traction systems. From the viewpoint of both power capacity and switching losses, a three-phase square-wave inverter system is adopted. To control the regenerated power, the magnitude and phase of fundamental output voltages should be appropriately controlled in spite of the variation of input DC voltage. Inverters are operated with modified a-conduction mode to fix the potential of each arm. The overall system consists of the line-to-line voltage and line current sensors, an actual power calculator using d-q transformation method, a complex power controller with PI control scheme, a gating signal generator for modified $\alpha-conduction\;mode\;with\;\delta\;and\;\alpha$, a DPLL for frequency followup, and power circuit.

  • PDF

Development of Accurate Load Model for Detailed Power System Stability Analysis (전력계통 안정도 정밀해석을 위한 적정 부하모델 개발)

  • Park, S.W.;Kim, K.D.
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.201-205
    • /
    • 2001
  • This paper presents the load modeling process and bus load models for KEPCO power system. At first, load devices commonly used in KEPCO power systems were selected, and tested for measuring the voltage and frequency sensitivity of active and reactive power. From this test, about 40 voltage and frequency dependent load models have been obtained. The bus load composition rate for KEPCO power system has been determined using the various recent surveys and papers in order to develop the load model for a power system bus. To verify the accuracy of developed bus load models, the field test for measuring active and reactive power according to artificial variation of the bus voltage was performed at 8 substations for spring summer, autumn, winter cases. With data of this seasonal field test, more reliable bus load models for KEPCO power systems were developed.

  • PDF

Investigation of the Preventive Diagnostic Criteria for Power Transformer (전력용 변압기 예방진단 기준치 검토)

  • Kweon, D.J.;Koo, K.S.;Kang, Y.W.;Woo, J.W.;Kwak, J.S.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.592-596
    • /
    • 2005
  • The preventive diagnostic system prevents transformers from power failure by giving alarm and observing transformers in service. And it helps to establish the plan for optimum maintenance of transformer as well as to find location or cause of fault using accumulated data. KEPCO has adopted the preventive diagnostic system at nine 345kV substations since 1997. Techniques for component sensors of preventive diagnostic system were settled but diagnostic algorithm, diagnostic criteria and practical use of accumulated data are not yet established. This paper, to build up the base of preventive diagnostic algorithm for the power transformer, investigated the preventive diagnostic criteria for power transformer.

  • PDF

Economic Evaluation of Power Grid Interconnection between Offshore Wind Power Plants (해상풍력발전단지 간의 전력계통 연계에 관한 경제성 분석 연구)

  • Moon, Won-Sik;Jo, Ara;Kim, Jae-Chul
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.4
    • /
    • pp.339-344
    • /
    • 2014
  • An offshore wind power plant (WPP) is very expensive and different from an onshore wind power system in many ways. There has been a continuous increase in the capacity of the offshore WPPs. Therefore it is essential to analyze the feasibility and reliability of the offshore wind power to optimize their redundancy. Besides, it is very important to study a planning for grid interconnection of adjacent offshore WPPs. This paper proposes a economic evaluation method to interconnect with adjacent offshore substations in offshore wind power grid. Also, we suggest the probabilistic reliability method to calculate a probabilistic power output of the wind turbine and a cost of the expected energy not supplied that is used as the reliability index of the power system.