A Study of Power Conversion System for Energy Harvester Using a Piezoelectric Materials (압전소자를 이용한 에너지 하베스터용 전력변환장치 연구)

  • An, Hyunsung;Kim, Young-Cheol;Cha, Hanju
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.7
    • /
    • pp.1059-1065
    • /
    • 2017
  • In this paper, the energy harvester with a piezoelectric materials is modeled as the electric equivalent circuit, and performances of a standard DC method and a Parallel-SSHI method are verified through experiment under variable force and load conditions. Piezoelectric generator consists of mass, damper and spring constant, and it is modeled by electrical equivalent circuit with RLC components. Standard DC and Parallel-SSHI are used as power conversion methods, and standard DC consists of full-bridge rectifier and smoothing capacitor. Parallel-SSHI method is composed of L-C resonant circuit, zero-crossing detector and full-bridge rectifier. In case of simulation under $100k{\Omega}$ load condition, the harvested power is $500{\mu}W$ in Standard DC and $670{\mu}W$ in Parallel-SSHI, respectively. In experiment, the harvested power under $100k{\Omega}$ load condition is $420{\mu}W$ in standard DC and $602{\mu}W$ in Parallel-SSHI. Harvested power of Parallel-SSHI is improved by approximately 40% more than that of standard DC method.

A Study on EMC Product Standard Including Specific Test Methods Related to Adjustable Speed Electrical Power Drive Systems (가변속 전력구동시스템 관련 특수 시험방법을 포함한 EMC 제품규격에 관한 연구)

  • Hong Soon-Chan;Seo Young-Min;Kim Kyung-Won
    • Proceedings of the KIPE Conference
    • /
    • 2002.07a
    • /
    • pp.99-103
    • /
    • 2002
  • IEC 61800 is an international standard on adjustable speed electrical power drive systems, which consists of three parts. IEC 61800-1 and IEC 61800-2 apply to DC power drive systems and AC power drive systems, respectively, which include power conversion, control equipment, and also a motor or motors. IEC 61800-3 specifies EMC ( Electro Magnetic Compatibility ) requirements for adjustable speed AC or DC motor drives connected to main supplies up to AC 1,000 volts. This paper studies the standards related to EMC and the text summary of international standard IEC 61800-3 which is an EMC product standard including specific test methods.

  • PDF

Economic Analysis of the Piezoelectric Power using the California Standard Test (캘리포니아 표준 테스트 방법을 사용한 압전 발판의 경제성 분석)

  • Jung, Soon-Sung
    • Journal of Power System Engineering
    • /
    • v.21 no.4
    • /
    • pp.51-56
    • /
    • 2017
  • The purpose of this study is to suggest economic analysis for piezoelectric power. Economic analysis method uses california standard test. Perspectives of california standard test is participant test, ratepayer impact measure test, program administrator cost test and total resource cost test. This study identifies the cost and benefit components. This study identifies benefit-cost calculation procedures from four test : participant test, ratepayer impact measure test, program administrator cost test and total resource cost test. In the economic analysis, the order of benefit cost ratio in piezoelectric power shows total resource cost test, program administrator cost test, ratepayer impact measure test and participant test.

A Case of the Distribution Power System PQMS Construction & Harmonic Voltage Analysis (배전계통 PQM 시스템 구축 및 고조파전압 분석사례)

  • Park, Yong-Up;Lee, Keon-Hang
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.9
    • /
    • pp.108-117
    • /
    • 2010
  • The main contents of this paper are the PQM system construction case and distribution system harmonic voltage analysis. The PQM system has constructed by KEPCO in order to investigate power quality of distribution power system for new power quality standard of KEPCO. In result, we have confirmed that voltage harmonic measurement value of the high voltage contract customer 8 households is suitable the KEPCO harmonic standard tentative plan. And the voltage harmonic value of distribution line end side is not always more high than source side by harmonic current offset effect. In the future, acquired data by season, region, load from the PQMS will be used on the resonable harmonic standard enactment in KEPCO.

Setup of standard PD calibrator and its uncertainties

  • Kim, Kwang-Hwa;Yi, Sang-Hwa;Lee, Heun-Jin;Kang, Dong-Sik
    • Journal of Electrical Engineering and Technology
    • /
    • v.6 no.5
    • /
    • pp.677-683
    • /
    • 2011
  • The present paper describes the setup of standard partial discharge calibrator for measuring partial discharge and estimating uncertainties. The standard PD calibrator was designed and set up, consisting of a digital pulse generator, capacitor modules, and a digital oscilloscope controlled by software developed in the laboratory. Using this software, averages of charges and rising times and their standard deviations in the measured pulses can also be calculated. The standard PD calibrator generates five types of pulses: single, double, random, oscillating, and long-rising. The coefficient sensitivities to estimate the uncertainties of pulses were extracted in the model circuit of the standard PD calibrator. The uncertainties of charges and rising times in pulses of the standard PD calibrator were estimated with single pulses. These values were 0.3%-1.4% in charges and 1.9%-7.0% in rising time; however, these values are lower than the limit values in IEC 60270.

A W-Band Millimeter-Wave Power Standard Transfer System Using the Direct Comparison Method (직접 비교법을 이용한 W-Band 밀리미터파 전력 표준 전달 시스템)

  • Kwon, Jae-Yong;Kang, Tae-Weon;Kang, Jin-Seob;Lee, Dong-Joon
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.24 no.1
    • /
    • pp.47-54
    • /
    • 2013
  • This paper introduces a W-band millimeter-wave power standard transfer system using the direct comparison method. The transfer system was developed to evaluate the effective efficiency and calibration factor of a W-band waveguide power sensor. The evaluation method and the measured results of the directional coupler that characterizes the calibration system are studied. The uncertainties of the standard transfer system are investigated, and the major uncertainty contributors are discussed as well. The performance of the realized W-band power standard transfer system was verified by comparing results with reference values.

Development of Wind Turbine Simulation System Based on IEC 61400-25 Standard

  • Lee, Jae-Kyung;Kim, Dong-Wook;Kim, Seok-Tae;Chae, Chang-Hun;Park, Joon-Young
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.4
    • /
    • pp.349-359
    • /
    • 2019
  • This paper introduces a wind turbine simulation system based on the IEC 61400-25 standard to simulate different kinds of wind turbines. A unified communication protocol was required for monitoring and control of wind turbines, because manufacturers had used their own protocols for their turbines. As a result of such an effort, the international standard IEC 61400-25 was established. To implement the schema of IEC 61400-25, the IEC61850 SCL was modified and applied to the simulation system, which enabled the system to be compatible with heterogeneous wind turbine information models. The developed simulation system can be used for interoperability tests with a new type of wind turbine information model.

A Study on the Reasonable Design Standard and Countermeasures of the Demand Factor (변전설비 용량기준의 합리화 방안 및 대책에 관한 연구)

  • Yoo, H.J.;Ha, B.N.;Nam, K.D.;Pak, S.M.;Cho, N.H.
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.902-904
    • /
    • 1996
  • In this paper, we proposed the reasonable design standard and countermeasures of Demand Factor for large office buildings, that was made by the statistical way considering actual conditions, such as investicated electric equipment capacity, electric power consumption, etc. So as to save electric equipment investment, the decrease of power loss, the improvement of facilities utilization and the decrease of electric rates, we can be contributed by the application of the design standard. The result of saving effect is showed to confirm the practical use of the proposed Demand Factor, and also, it is believed that this proposed Demand Factor will be useful in electric equipment operation and planning.

  • PDF

Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

Study of Selection Plan of Circuit breakers, Cables and Modeling of Korean Low Voltage Electrical Installation integration Test Site based on IEC 60364 (IEC 60364 기반의 한국형 저압전기설비 통합 실증단지 모델링 및 차단기와 케이블의 선정 방안 고찰)

  • Kim, Doo-Ung;Ryu, Kyu-Sang;Kim, Han-Soo;Shin, Dae-Sung;Ryu, Ki-Hwan;Kim, Chul-Hwan
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.9
    • /
    • pp.59-64
    • /
    • 2015
  • IEC is an international standards which are used in many countries with Europe as the center. IEC standard is introduced in Korea according to WTO/TBT agreements, however until now there are no buildings in Korea which are designed applying IEC standard. Therefore, KEA(Korea Electric Association) is scheduled to construct Korean low voltage electrical installation integration test site which is designed applying IEC standard. In this paper, before being under construction of Korean low voltage electrical installation integration test site, power substation is modeled based on real design parameters and method to select circuit breakers and cables is presented applying IEC standard in the modeled power substation. EMTP(ElctroMagnetic Transient Program) is used for simulation program. EMTP which is power system analysis program is easy to model power system and power substation.