This study presents a development of the cleaning system in a nuclear power plant condenser. The tube cleaning system is very important equipment in a power plant condenser. Specially, removal of the fouling is a key process in the condenser tube. The objective of this study is development of a ball collector system for cleaning a condenser by using a sponge ball. This study uses CFD in order to optimize design of the ball strainer screen. Through the CFD, the implication of the ball strainer screen for static pressure distribution is examined. Results of research, this study have developed a 1/5 scale model for application to the power plant and developed a performance test equipment.
The 6th International Conference on Construction Engineering and Project Management
/
pp.600-601
/
2015
Both the importance and process of estimating Nuclear-power plant construction time and cost have increased in significance as energy user costs themselves have become more significant. In estimating construction time, few parameters are more significant than work item production rates and factors significantly affecting the rates. A standardized data collection tool was used to acquire a total of 401 data points from a S Nuclear-power plant project, for selected critical works: form-work, rebar-work, and concrete-pouring. With the data, several hypothesized drivers of the man-hour production rates and crew-day production rates were also analyzed. Findings from this study will enable industry professionals to enhance accuracy of time and cost estimation for nuclear power plant construction.
The development of coal-fired power plants to ensure energy security and electricity consumption is a matter for the Vietnam economy. However, the huge amount of ash discharged is a major environmental challenge. It is estimated that by the end of 2017, the amount of ash in the country is about 40 million tons and annually emitted over 16.4 million tons. While the quantity of coal-fired power plant is rising, the ash content will increase year by year if the ash doesn't treat well. The ash will be increased from 61 million tons in 2018 to 109 million tons in 2020, 248 million tons in 2025 and 422 million tons in 2030. The difficulties of coal-fired power plants are the problem of ash handling, some plants are at risk of closure because there are not enough dump capacity to storage. Therefore, Vietnam is in need of urgent measures to treat a large amount of waste from coal-fired power plants. The specific objectives of this study were as follows: (1) provide an overview of coal ash situation produced by coal-fired power plants in Vietnam; (2) study about regulations related to coal ash treatment; (3) comprehend the literature review of the cement sector status.
This paper presents an second harmonic elimination method based on the impedance variation scheme. Through the power quality analysis from the nonlinear loads connected on the power system, the second harmonic problems have been analyzed with a case study analysis and the experiments. In the paper, the second Harmonic generation was simulated with a single phase SCR rectifier and the analytical model is proposed for the second harmonic generation. A novel impedance variation scheme is proposed and analyzed to eliminate the second harmonic. The experiment has been performed on the 60(MVA) industry manufacturing plant. The experimental result demonstrates the proposed impedance variation scheme successfully operate on the 60(MVA) industry manufacturing plant.
How to maintain the optimal electric power generation mix is one of the important problems in electric power industry. The objective of this study is to develop a computer model which can be used to forecast the investment in power generation unit by the plant owners after restructuring of electric power industry. Restructuring of electric power industry will make difference in decision making process of investment in power generation unit. After Privatiazation of Power Industry, Gencos will think that profit is the most important factor among all others attracting the investment in the industry. Coal power generation is better than LNG CCGT in terms of profit. However, many studies show that LNG CCGT will be main electric power generation source because the rest of factors other than profit in LNG CCGT are superior than Coal power generation. Because the nst of factors other than profit in LNG CCGT are superior than Coal power generation. The impacts of the various government policies can be analyzed using the computer model, thus the government can formulate effective policies for achieving the desired electric power generation mix.
How to maintain the optimal electric power generation mix is one of the important problems in electric power industry. The objective of this study is to develop a computer model which can be used to forecast the investment in power generation unit by the plant owners after restructuring of electric power industry. Restructuring of electric power industry will make difference in decision making process of investment in power generation unit. After Privatiazation of Power Industry, Gencos will think that profit is the most important factor among all others attracting the investment in the industry. Coal power generation is better than LNG CCGT in terms of profit. However, many studies show that LNG CCGT will be main electric power generation source because the rest of factors other than profit in LNG CCGT are superior than Coal power generation. The impacts of the various government policies can be analyzed using the computer model, thus the government can formulate effective policies for achieving the desired electric power generation mix.
As a result of evaluating the level of tritium emitted from the nuclear power plant in the environment and the human body, it was confirmed that tritium was detected in the environmental media and human urine samples to be investigated. It was found that the tritium was clearly detected. After the operation of the Tritium Removal Facility (TRF), which was operated for the purpose of removing tritium from the Wolsong nuclear power plant, the tritium emission showed a decreasing trend, and the tritium level in the environmental media also showed a tendency to decrease accordingly. However, for precise evaluation, it was necessary to select and investigate points by distance, season, and wind direction from the nuclear power plant, but it also showed characteristics that did not reflect this. As the cycle, etc., implemented the previous environmental monitoring program as it is, there was also a limitations in not being able to reflect the changing environment. Therefore, it is necessary to review and supplement the environmental monitoring investigation plan and results so far, and by applying the supplemented investigation plan to secure valid and reliable investigation results, it is judged that it will be an appropriate measure for environmental conservation and human protection in the vicinity of the nuclear power plant.
Because of its predictability of the energy cycle and huge scale power output, the ocean energy from tidal power utilization has always received attention as a great energy source, even though its development cost, including the embankment construction, is so much higher than that of any other energy source. Nevertheless, nowadays many projects are being planned on account of institutional support from the government and the recent advance of construction technology. In Korea, the new industry field operating and managing the tidal power plant has already opened. But we are facing a number of problems for optimal operation of tidal power plant that are a lack of operation experience and a skill of professional management and others. This paper suggests a novel way to determine the starting head of power generation by generating power comparison method For this new method, the paper discusses many factors including changing the volume of the basin, the number of operating turbines and gates and forecasting the tidal amplitude and the characteristic curve of turbine and gate. Finally we verified that it can increase about 2% an annual power generation compared with the conventional method using the original operational function made in the plant design process.
The geologically favourable areas for the occurrence of uranium in Australia and the geology of the major deposits are discussed as well as exploration programs and expenditures. Australis has no short-term requirement for nuclear power generation and its
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.