Internet of Things (IoT) is an environment where various devices are connected to each other via a wired/wireless network and where the devices gather, process, exchange, and share information. Some of the most important types of IoT devices are mobile IoT devices such as smartphones. These devices provide various high-performance services to users but cannot be supplied with power all the time; therefore, power management appropriate to a given IoT environment is necessary. Power management of mobile IoT devices involves complex relationships between various entities such as application processors (APs), HW modules inside/outside AP, Operating System (OS), platforms, and applications; a method is therefore needed to systematically analyze and manage these relationships. In addition, variabilities related to power management such as various policies, operational environments, and algorithms need to be analyzed and applied to power management development. In this paper, engineering principles and a method based on them are presented in order to address these challenges and support systematic development of IoT device power management. Power management of connected helmet systems was used to validate the feasibility of the proposed method.
The Journal of Korean Institute of Information Technology
/
v.16
no.12
/
pp.101-107
/
2018
In wireless sensor network technology, which has been applied to various fields, the power supply and the power management of sensors are the most important issues. For this reason, a new concept of power supply and power management device is required. In this paper, we developed an autonomous independent power supply system that supplies the stable power to a sensor node without an additional external input by applying the energy harvesting technology using the electromagnetic induction principle by utilizing the current flowing in the transmission line. The proposed autonomous independent power supply system consists of a power supply using Power CT and a power management system including a charging circuit. The power management device uses a voltage limiter circuit and a monitoring circuit of charging voltage and current to ensure the safety of charging of the battery. In order to verify the performance of the proposed system, we applied it to the SVL diagnostic system and confirmed that it operates stably.
Kim, Byeong-Gi;Seo, Jeong-Se;Hwang, Geon;Mun, Seok-Hwan;Bae, Chan-Hyo
Proceedings of the SAREK Conference
/
2005.11a
/
pp.329-334
/
2005
As more high power wide band gap devices are being utilized. the thermal management issues associated with these devices need to be resolved. High power small devices dissipate excessive heat that must be cooled, but traditional cooling methods are insufficient to provide such a cooling means. This paper will evaluate a micro-capillary pumped loop thermal management system that is incorporated into the shim of the device, taking advantage of phase-change to increase the thermal conductivity of the system. The results of the modeling of the thermal management system will be discussed.
Additional functional upgrades to the large-area compton camera (LACC) measurement device that can provide characteristics evaluation information (nuclear species and radioactivity) and two-dimensional or three-dimensional distribution imaging information of radioactive materials existing in surface or internal of concrete structures are required in terms of work stability and efficiency in order to apply to actual decommissioning sites such as nuclear power plants or medical cyclotron facilities by using this measurement device. To this purpose, the technology that allows radiation workers to intuitively and visually check the distribution of radioactive materials in advance by matching the two-dimensional distribution imaging information of radioactive materials obtained through the LACC measurement device and visual imaging of the measurement zone (10 m × 5 m) was developed. In addition, the separate system that can automatically adjust the position (height) in units of the measurement area size (0.7 m × 0.3 m × 0.8 m) of the LACC measurement device was developed and the integrated management system for characteristics evaluation information and two-dimensional or three-dimensional distribution imaging information obtained per unit of measurement for radioactive materials was developed. These functional upgrades related to LACC measurement device can improve work efficiency and safety when measuring radioactivity of concrete structures and enable the establishment of appropriate decommissioning strategies using radioactivity measurement information for decommissioning nuclear power plants or medical cyclotron facilities.
An Internet of Things (IoT) is a system where various "things" are connected to each other via a wired/wireless network, and where information is gathered, processed, and interchanged/shared. One of the important actors in IoT is a mobile IoT device (such as a smartphone or tablet). These devices tend to consume a large amount of power in order to provide various high performance application services; however, as the devices cannot be supplied with power all the time, efficient power management is necessary. Power management of mobile IoT devices involves complex relationships between various entities such as application processors (APs), HW modules inside/outside AP, operating systems, mobile IoT platforms, and applications. In order to develop power-efficient mobile IoT devices, a method is needed to systematically analyze these relationships and manage power based on a clear understanding of them. To address this problem, software engineering principles for the development of power-efficient mobile IoT devices are presented in this paper. The feasibility of the proposed principles have been validated in the domain of smartphone camera power management.
In recent years, embedded systems have been expanding their application domains from traditional embedded systems such as military weapons, robots, satellites and digital convergence systems such as celluar phones, PMP(Portable Multimedia Player), PDAs(Personal Digital Assistants) to Next Generation Personal Computers(NGPCs) such as eating PCs, wearable computers. The NGPCs are network-based, human-centric digital information devices diverged from the traditional PCs used mainly for document writing, internet searching and database management. Wearable computers with battery capacity and memory size limitations have to use real-time operating systems with small footprints and low power management techniques to provide user's QoS in spite of hardware constraints. In this paper, we have designed and implemented a low-power RTOS (called eRTOS) for wearable computers. The implemented eRTOS has 18KB footprints and the dynamic power management and the device power management schemes are adapted in it. Experimental results with wearable computer applications show that the low power techniques could save energy up to 47 %.
The Transactions of The Korean Institute of Electrical Engineers
/
v.60
no.9
/
pp.1663-1667
/
2011
Voltage variation caused by large loads such as arc furnace and large motors, which use the large and instantaneous currents, can cause the voltage flicker. The flicker irritates the human's eyes and also has an adverse effect on protection device, rotating machine and electronic device etc, therefore the flicker needs to be managed effectively. Recently, the Korea power quality standard has been established on the IEC standards. This paper presents the flicker management standard for distribution power system and suggests the flicker transfer coefficients for Korea power system based on the IEC 61000-3-7.
Journal of Korea Society of Digital Industry and Information Management
/
v.8
no.1
/
pp.41-46
/
2012
In this paper, An efficient circuit design algorithm considering constraint is proposed. The proposed algorithm sets up in time constraint and area constraint, power consumption constraint for a circuit implementation. First, scheduling process for time constraint. Select the FU(Function Unit) which is satisfied with time constraint among the high level synthesis results. Analyze area and power consumption of selected FUs. Constraint set for area and power constraint. Device selection to see to setting condition. Optimization circuit implementation in selected device. The proposed algorithm compared with [7] and [8] algorithm. Therefore the proposed algorithm is proved an efficient algorithm for optimization circuit implementation.
Journal of the Korea Society of Computer and Information
/
v.21
no.6
/
pp.1-7
/
2016
An uninterruptible power supply (UPS) allows small companies and domestic users to cope with power outages; but existing designs lack flexibility of control and require expensive battery maintenance, with a cost proportional to the outage compensation time. We combine a compact synchronous generator with a battery, with 10% of the capacity that would otherwise be required, to obtain a UPS with reduced maintenance costs for the same performance. Any UPS must respond immediately to a power loss, and our uninterruptible generator supply (UGS) is therefore built around real-time scheduling of its internal operations; this also makes it suitable for integration into the industrial gateway. The UGS is based on a real-time operating system, with an integrated wireless module providing connectivity to a web server, for monitoring and management, which can be performed remotely on a mobile device.
The Journal of the Korea institute of electronic communication sciences
/
v.10
no.1
/
pp.73-80
/
2015
The valve device is installed in hazardous areas, such as a chemical plant explosion has been sealed with fire protection device to prevent the risk of explosion. In this paper, due to the explosion-proof devices using external power the device can not be used in infrared sensors and Zigbee sensor valve device by measuring the open degree of valve opening and closing of the danger zone to check whether. Valve opening and closing operation log screen time, we propose a low-power operation monitoring system administrators to manage and control the plant. Develop power control relay board apply an improved algorithm to apply the asynchronous LPL power management. The plant monitoring system and explosion-proof valve opening and closing the valve system with the intelligent device designed and implemented and tested it.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.