• 제목/요약/키워드: Power demand and supply

검색결과 614건 처리시간 0.026초

국내 전력수급 방안 (Electric Power Supply & Demand measures in korea)

  • 이기선
    • 기술사
    • /
    • 제44권2호
    • /
    • pp.29-33
    • /
    • 2011
  • In recent years, maximum electric power demand has been increasing steadily. But, Electric Power Supply & Demand problem is occurring due to lack of electric power reserve ratio caused by electric power peak. For this reason, I investigated the current status of the Electric Power Supply & Demand and established Electric Power Supply & Demand and established Electric Power Supply & Demand measures. I will expect that this paper will be contributed balanced and stable Electric Power Supply & Demand management.

  • PDF

Study of Peak Load Demand Estimation Methodology by Pearson Correlation Analysis with Macro-economic Indices and Power Generation Considering Power Supply Interruption

  • Song, Jiyoung;Lee, Jaegul;Kim, Taekyun;Yoon, Yongbeum
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권4호
    • /
    • pp.1427-1434
    • /
    • 2017
  • Since the late 2000s, there has been growing preparation in South Korea for a sudden reunification of South and North Korea. Particularly in the power industry field, thorough preparations for the construction of a power infrastructure after reunification are necessary. The first step is to estimate the peak load demand. In this paper, we suggest a new peak demand estimation methodology by integrating existing correlation analysis methods between economic indicators and power generation quantities with a power supply interruption model in consideration of power consumption patterns. Through this, the potential peak demand and actual peak demand of the Nation, which experiences power supply interruption can be estimated. For case studies on North Korea after reunification, the potential peak demand in 2015 was estimated at 5,189 MW, while the actual peak demand within the same year was recorded as 2,461 MW. The estimated potential peak demand can be utilized as an important factor when planning the construction of power system facilities in preparation for reunification.

수용가용 직접부하제어장치 설계 (Design of Direct Load Controller for use of Demand Side)

  • 박종찬;김한구;정병환;강병희;최규하
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2005년도 전력전자학술대회 논문집
    • /
    • pp.149-151
    • /
    • 2005
  • Recently, power supply-demand instability due to the dramatic increase in power usage suchas air-conditioning load at summertime has brought forecasts of decrease in power supply capability. Therefore improving the load factor through systematic load management, in other words, Direct Load Control became necessary. Direct Load Control(DLC) system is kind of a load management program for stabilization of electric power supply-demand. It's purpose is limiting the demand of the demand side selected at peak load or other time periods. The paper presented a Design of Direct Load Controller for control the amount of power demand in demand side. The proposed Controller is cheaper and has ability of storing more power data than pre-existing device.

  • PDF

수급 불균형을 고려한 전력망의 최적 자원 할당을 위한 일치 기반의 분산 알고리즘 (Consensus-Based Distributed Algorithm for Optimal Resource Allocation of Power Network under Supply-Demand Imbalance)

  • 임영훈
    • 한국정보전자통신기술학회논문지
    • /
    • 제15권6호
    • /
    • pp.440-448
    • /
    • 2022
  • 최근 분산 에너지 자원들의 도입으로 전력망의 최적 자원 할당 문제의 중요성이 강조되고 있고, 대규모 전력망의 방대한 양의 데이터를 처리하기 위해 분산 자원 할당 기법이 요구되고 있다. 최적 자원 할당 문제에서 각 발전기의 발전 용량의 한계로 인하여 수급의 균형이 만족하는 경우를 고려한 연구는 많이 진행되고 있지만, 총 요구량이 최대 발전 용량을 초과하는 경우인 수급 불균형을 고려한 연구는 아직 미미한 실정이다. 본 논문에서는 수급 균형인 상황뿐만 아니라 수급 불균형 상황을 고려하여 전력망의 최적 자원 할당을 위한 일치 기반의 분산 알고리즘을 제안한다. 제안하는 분산 알고리즘은 수급 균형을 만족하는 경우에는 최적의 자원을 할당하고, 수급이 불균형한 경우에는 부족한 자원의 양을 계측할 수 있도록 설계하였다. 마지막으로 모의실험을 통하여 제안된 알고리즘의 성능을 검증하였다.

전력 수요 예측 패턴 시스템 설계 (Electric Power Demand Prospect Pattern System)

  • 유승현;이종명;박한호;곽내정;이현태;전재성
    • 한국콘텐츠학회:학술대회논문집
    • /
    • 한국콘텐츠학회 2008년도 춘계 종합학술대회 논문집
    • /
    • pp.112-115
    • /
    • 2008
  • 최근 한전에서는 배전부문을 분리하여 발전부문과 배전부문이 입찰시장에 참여하여 수요와 공급에 따라 시장가격이 결정되고 송전망을 개방 배전회사의 자유로운 사용을 보장하고 있다. 본 논문에서는 전력 수요 요인(기온, 경제성장)에 따른 패턴을 추출하여 전력 수요를 예측 한다. 예측된 데이터들을 Database화하여 Web으로 보여주며 발전 최적 시장가를 제안한다. 제안 시스템은 앞으로 개방될 전력 수급 시장에서 정확한 수요 예측을 통하여 경쟁력을 향상 시키고 전력 수급의 원활을 통해 소비자의 만족도를 증가시킨다. 또한 전년, 전월, 전주, 전일의 시간대별 전력 사용량을 미리 예측하고, 분석하기 때문에 공급자가 전력을 생산하는데 필요한 기본요금 절감효과와 하한가를 정함으로써, 사용자의 기본요금 지출을 절감할 수 있다.

  • PDF

전력수급기본계획의 불확실성과 CO2 배출 목표를 고려한 발전용 천연가스 장기전망과 대책 (Scenario Analysis of Natural Gas Demand for Electricity Generation in Korea)

  • 박종배;노재형
    • 전기학회논문지
    • /
    • 제63권11호
    • /
    • pp.1503-1510
    • /
    • 2014
  • This study organizes scenarios on the power supply plans and electricity load forecasts considering their uncertainties and estimates natural gas quantity for electricity generation, total electricity supply cost and air pollutant emission of each scenario. Also the analysis is performed to check the properness of government's natural gas demand forecast and the possibility of achieving the government's CO2 emission target with the current plan and other scenarios. In result, no scenario satisfies the government's CO2 emission target and the natural gas demand could be doubled to the government's forecast. As under-forecast of natural gas demand has caused the increased natural gas procurement cost, it is required to consider uncertainties of power plant construction plan and electricity demand forecast in forecasting the natural gas demand. In addition, it is found that CO2 emission target could be achieved by enlarging natural gas use and demand-side management without big increase of total costs.

발전기 공급능력 산정 및 예측 기술개발 (Development of Supply Capability Calculation and Prediction Technology for Generator)

  • 김의환;안영모;홍은기
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제2권3호
    • /
    • pp.425-431
    • /
    • 2016
  • Supply Capability of the generator, if the maximum demand occurs, refers to the maximum power that can be stably supplied and it is possible to maintain stable power supply to be greater than actual load. However, unexpected power demand and reduction in supply Capability due to stop of unexpected generator in operation can temporarily make a big chaos in power system. In fact, due to a lack of power supply Capability in the country, enforced emergency load adjustment to the September 15, 2011, the circulation power outage has occurred in several cities. As the result, interrupted operation of the elevator and stopped hospital medical equipment led to a great deal of trouble to people's lives, causing a social problem. At that time, it was found that a failed frequency control because of smaller actual supply Capability than that of predicted. The difference was about 1,170 MW with Gas turbine power plant. By accurately calculating the generator supply capability, we can not only grasp the power reserve rate, but also correspond to the time of power supply instability.

수용가용 직접부하제어시스템의 구성 및 운영 (Composition and Operation of Direct Load Control(DLC) System for use of Demand Side)

  • 박종찬;최문규;이용균;김선자;정병환;최규하
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 B
    • /
    • pp.1260-1262
    • /
    • 2004
  • Direct Load Control(DLC) system is a load management program for stablization of electric power supply-demand. It is a series of acts limiting the demand of selected demand side at peak load or other time periods. Recently, power supply-demand instability due to dramatic increase in power usage such as summertime air-conditioning load has brought forecasts of decrease in power supply capability. Therefore heightening the load factor through systematic load management, in other words, Direct Load Control became necessary. By examining the composition and operation of the DLC system, this paper provides conceptional understanding of the DLC system and help in system research.

  • PDF

전력(電力)의 수요측(需要側) 관리방안(管理方案) (Demand Side Management in Power System)

  • 강원구
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1993년도 하계학술대회 논문집 A
    • /
    • pp.45-47
    • /
    • 1993
  • Load Management, is originated from efficiency improvement of energy use, or energy conservaion. Traditionally, electric utilities have constructed new power plants to meet the steadily increasing electricity demand. Power development planning, however, is becoming more difficult in the countries like Korea, Japan, and the United States, and increasing concerns about global environmental problems necessitate changes from existing supply-side options based on fossil-fuel to environmentally agreeable supply strategies. This paper discusses the demand side management strategy with emphasis on the concept, implementation scheme, and current practices employed in utilities.

  • PDF

아크로 긴급시 부하차단 적용성 검토 (A Study on application of load cutting in emergency)

  • 박현택;김재철;임상국;허동렬
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.298-300
    • /
    • 2004
  • Arc-furnace facilities consume 9,895,165(MWh) which is about 69.6 Percent of electronic furnace power consumption. and interior of a country demand power have inclosed annual. but becaused of the problem of cost, power plant location, and environment have faced difficulty to electric power supply. In this paper, Examining Load cutting of Arc-furnace that is dominating high weight of industry electric power use. and it is expected to solve easily electric power supply and demand problem by highest Priority load cutting examination of Arc-furnace when electric power supply and demand problem happens to area electric power system when is urgent.

  • PDF