Study of Peak Load Demand Estimation Methodology by Pearson Correlation Analysis with Macro-economic Indices and Power Generation Considering Power Supply Interruption |
Song, Jiyoung
(Korea Electric Power Corporation (KEPCO) Research Institute)
Lee, Jaegul (Korea Electric Power Corporation (KEPCO) Research Institute) Kim, Taekyun (Korea Electric Power Corporation (KEPCO) Research Institute) Yoon, Yongbeum (Korea Electric Power Corporation (KEPCO) Research Institute) |
1 | S. S. Lee, Y. S. Jang, G. P. Park, S. K. Kim, Y. C. Kim, J. K. Park, S. I. Moon, Y. T. Yoon, "Northeast Asia Power System Interconnection Part 3: North- South Korea Transaction Analysis," in Proc. KIEE, 2010, pp. 113-115. |
2 | J.Y. Yun, "South and North Korea Integrated Power Grid," KEER, vol. 6, pp. 155-173, Jun. 2007. |
3 | E. H. Barakat, M. A. M. Eissa, "Forecasting monthly peak demand in fast growing electric utility using a composite multiregression-decomposition model," in Proc. IEE, 1989, pp. 35-41. |
4 | A. M. Neto, A. C. Victorino, "Real-Time Dynamic Power Management based on Pearson's Correlation Coefficient," in Proc. ICAR, 2011, pp. 304-309. |
5 | J. M. Cha, K. H. Yooun, B. H. Ku, "Annual Yearly Load Forecasting by Using Seasonal Load Characteristics with Considering Weekly Normalization," in Proc. KIEE, 2011, pp. 199-200, |
6 | World Bank web site, http://data.worldbank.org/indicator, Nov 30th 2014. |
7 | Z. W. Geem, W. E. Roper, "Energy demand estimation of South Korea using artificial neural network," Energy Policy, vol. 37, pp. 4049-4054, 2009. DOI |
8 | K. H. Yoon, B. H. Ku, J. M. Cha, J. S. Choi, U. K. Baek, "A Study for Annual Load Forecasting by Using Trend Method with Considering Peak Load," in Proc. KIEE, 2010, pp.188-190. |
9 | Korea Power Exchange(KPX) historical data, www.kpx.or.kr. Oct 31st 2014. |
10 | R. Morris, R. Brown, "Extension of validity of GRG method in optimal control calculation," IEEE Journals & Magazines, vol. 21, pp. 420-422, 1976. |
11 | L. S. Lasdon, R. L. Fox, M. W. Ratner, "Nonlinear optimization using the generalized reduced gradient method," R.A.I.R.O., vol. 3, pp. 73-103, 1974. |
12 | K. J. Hwang, H. R. Ju, M. H Yi, D. H. Ahn, "Yearly Load Forecasting Algorithm for Annual Electric Energy Supply Plan," in Proc. KIEE, 2006, pp. 76-77. |
13 | R. J. Hyndman, S. Fan, "Density Forecasting for Long-Term Peak Electricity Demand," IEEE Transaction on Power Systems, vol. 25, pp. 1142-1153, May 2010. DOI |
14 | J. Deng, "Energy Demand Estimation of China Using Artificial Neural Network," in Proc. BIFE, 2010, pp. 32-34. |
15 | K. B. Song, "Various Models of Fuzzy Least-Squares Linear Regression for Load Forecasting," KIEE, vol. 21, pp. 61-67, Aug. 2007. |
16 | Y. H. An, S. M. Moon, "Research on inter-Korean Economic Integration Scheme after Reunification," Korea Institute of Finance, vol. 291, Jan. 2007. |
17 | N. Hasan, M. N. S. K. Shabbir, S. A. M. B. Uddin, T. Islam, A. Islam, "A Strategic Numerical Approach to Estimate Actual Demand in case of Systematic Data Scarcity," in Proc. IFOST, 2014, pp. 369-372. |
18 | Hyundai Research Institute, 2050 Reunified Korea's Future Economy, 2014. |
19 | S. J. Lee, C. K. Kim, S. H. Park, W. H. Shin "Development issues of the growth centers in North Korea for preparing Korean unification (I)," Korea Research Institute for Human Settlements, vol. 50, 2011 |
20 | S. M. Moon, B. H. Yu, "The Effects of Inter-Korean Integration Type on Economic Performance: the Role of Wage Policy," Korea Institute of Finance, vol. 477, Jul. 2012. |
21 | J. Y. Song, J. G. Lee, T. K. Kim, J. H. Shin, S. W. Han, B. K. Ko, S. T. Cha, J. H. Choi, "Study on Peak Demand Estimation Methodology by using Correlation with Economic Index and Total generation," in Proc. ISGC, 2015, pp. 504-507. |
22 | KOSIS web site, Korea Statistical Information Service, http://kosis.kr, Nov 30th 2014. |
23 | Korea Finance Corporation, The North Korea Industry, 2010. |