• 제목/요약/키워드: Power Transmission System

검색결과 3,171건 처리시간 0.033초

연계 계통에서의 환경적 배출량과 손실을 고려한 최적 경제급전 (Multi-Area Economic Dispatch Considering Environmental Emission and Transmission Losses)

  • 최승조;이상봉;김규호;유석구
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 A
    • /
    • pp.341-343
    • /
    • 2000
  • Traditionally electric power system are operated in such a way that the total fuel cost is minimized regardless of accounting for tie-lines transmission constraint and emissions produced. But tie-lines transmission and emissions constraint are very important issues in the operation and planning of electric power system. This paper presents the Two-Phase Neural Network(TPNN) to solve the Economic Load Dispatch (ELD) problem with tie-lines transmission and emissions constraint considering transmission losses. The transmission losses are obtained from the B-coefficient which approximate the system losses as s quadratic function of the real power generation. By applying the proposed algorithm to the test system, the usefulness of this algorithm is verified.

  • PDF

송전계통의 전기품질 측정 시스템에 관한 연구 (Study on the measuring system of power quality for transmission system)

  • 김영노;신봉일;이희철;곽노홍;전영수;박상호;이일무
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2006년도 전력전자학술대회 논문집
    • /
    • pp.432-434
    • /
    • 2006
  • The additional matters appear to be considered in several aspects for building up power-quality measuring system of transmission system(high voltage system) compared to distribution system(middle or low voltage system). Like in distribution system, input signals are also received from PT and CT source of voltage and current respectively in transmission system and applied in accordance with a certain rate. In this case, very big error rate can be occurred according to the specification of the measuring system as the applying rate is bigger than in distribution system beyond comparison. In addition, when the abnormal signal occurred such as sag/swell, interruption, transient etc., power quality of other sires linked to the system also should be checked to find the accurate cause of the abnormal power-quality signals from the corresponding. site. Accordingly, the accurate diagnosis on the condition of power quality for the system depends on the way how the synchronization system is brought along for each site. This paper will suggest the solution for the most effective system building focused on how to solve the problem of the error rate and synchronization described in the above when building up the measuring system of power quality for transmission system.

  • PDF

Steady-state Operational Strategies of UPFC in the KEPCO Transmission System

  • Chang, B.H.;Choo, J.B.;Xu, X.K.;Lam, B.P.
    • KIEE International Transactions on Power Engineering
    • /
    • 제3A권3호
    • /
    • pp.161-167
    • /
    • 2003
  • This paper presents a study performed to investigate the steady-state operational strategies of UPFCs in the Jeollanam-Do system in Korea. The objective of the study was to determine the UPFC operating points under normal and contingency conditions. The study consists of developing load flow models to simulate different load levels with and without UPFCs in the system, assessing the effectiveness of UPFCs by contingency analysis, and introducing optimal corrective actions for removing voltage problems caused by contingencies. The paper describes analytical tools, models and approach. It also includes analysis and discussion of the study results. The paper contributes to the area of transmission operational studies with FACTS applications.

Time Shifted Pilot Signal Transmission With Pilot Hopping To Improve The Uplink Performance of Massive MIMO System For Next Generation Network

  • Ruperee, Amrita;Nema, Shikha
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제13권9호
    • /
    • pp.4390-4407
    • /
    • 2019
  • The paucity of pilot signals in Massive MIMO system is a vital issue. To accommodate substantial number of users, pilot signals are reused. This leads to interference, resulting in pilot contamination and degrades channel estimation at the Base Station (BS). Hence, mitigation of pilot contamination is exigency in Massive MIMO system. The proposed Time Shifted Pilot Signal Transmission with Pilot signal Hopping (TSPTPH), addresses the pilot contamination issue by transmitting pilot signals in non-overlapping time interval with hopping of pilot signals in each transmission slot. Hopping is carried by switching user to new a pilot signal in each transmission slot, resulting in random change of interfering users. This contributes to the change in channel coefficient, which leads to improved channel estimation at the BS and therefore enhances the efficiency of Massive MIMO system. In this system, Uplink Signal Power to Interference plus Noise Power Ratio (SINR) and data-rate are calculated for pilot signal reuse factor 1 and 3, by estimating the channel with Least Square estimation. The proposed system also reduces the uplink Signal power for data transmission of each User Equipment for normalized spectral efficiency with rising number of antennas at the BS and thus improves battery life.

Development of the Corrosion Deterioration Inspection Tool for Transmission Tower Members

  • Woo, Sangkyun;Chu, Inyeop;Youn, Byongdon;Kim, Kijung
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제2권2호
    • /
    • pp.293-298
    • /
    • 2016
  • Recently, interests for maintenance of transmission tower are increasing to extend life of structures and reduce maintenance cost. However, existing classical diagnosis method of corrosion deteriorated degree on the transmission tower steel members, visual inspection, has a problem that error often due to difference of inspector's individual knowledge and experience. In order to solve the problem, this study carried out to develop the corrosion deterioration inspection tool for transmission tower steel members. This tool is composed of camera equipment and computer-aided diagnosis system. We standardized the photographing method by camera equipment to obtain suitable pictures for image processing. Diagnosis system was designed to evaluate automatically degree of corrosion deterioration for member of transmission tower on the basis of the RGB color image processing techniques. It is anticipated that developed the corrosion deterioration inspection tool will be very helpful in decision of optimal maintenance time for transmission tower corrosion.

농업용 트랙터 듀얼 클러치 변속기의 동력전달 효율 분석에 관한 연구 (Transmission Efficiency of Dual-clutch Transmission in Agricultural Tractors)

  • 문석표;문상곤;김재승;손종현;김용주;김수철
    • 드라이브 ㆍ 컨트롤
    • /
    • 제19권1호
    • /
    • pp.43-50
    • /
    • 2022
  • The aim of this study was to conduct basic research on the development of a dual-clutch transmission(DCT) and automatic transmission for agricultural tractors. The DCT layout and the DCT simulation model were developed using commercial software. Power transmission efficiency of the DCT and component power loss were analyzed to verify the developed simulation model. Power loss analysis of the components was conducted according to previous studies and ISO(International Organization for Standardization) standards. The power transmission efficiency of the DCT simulation model was 68.4-91.5% according to the gear range. The power loss in the gear, bearing, and clutch DCT system components was 0.75-1.49 kW, 0.77-2.99 kW, and 5.24-10.52 kW, respectively. The developed simulation model not include the rear axle, differential gear, final reduction gear. Therefore actual power transmission efficiency of DCT will be decreased. In a future study, an actual DCT can be developed through the simulation model in this study, and optimization design of DCT can be possible by comparing simulation results and actual vehicle test.

154kV 송전선로용 피뢰기 현장 설치 효과 분석 (Study on the effects of lightning arrestors installment on a 154kV transmission system)

  • 최한열;민병욱;박순규;이봉희;곽주식
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 추계학술대회 논문집 전기설비전문위원
    • /
    • pp.9-11
    • /
    • 2008
  • Lightning has been identified as one of the leading causes of outages on transmission and distribution systems. To protect the transmission and distribution line from lightning, the transmission lightning arrestor can be the effective facility on the power system. This paper will discuss Gapped type Arresters application results by analysing effects of lightning arrestors on transmission and distribution line.

  • PDF

New Control Strategy for Three-Phase Grid-Connected LCL Inverters without a Phase-Locked Loop

  • Zhou, Lin;Yang, Ming;Liu, Qiang;Guo, Ke
    • Journal of Power Electronics
    • /
    • 제13권3호
    • /
    • pp.487-496
    • /
    • 2013
  • The three-phase synchronous reference frame phase-locked loop (SRF-PLL) is widely used for synchronization applications in power systems. In this paper, a new control strategy for three-phase grid-connected LCL inverters without a PLL is presented. According to the new strategy, a current reference can be generated by using the instantaneous power control scheme and the proposed positive-sequence voltage detector. Through theoretical analysis, it is indicated that a high-quality grid current can be produced by introducing the new control strategy. In addition, a kind of independent control for reactive power can be achieved under unbalanced and distorted grid conditions. Finally, the excellent performance of the proposed control strategy is validated by means of simulation and experimental results.

송전계통의 전기품질 측정 시스템에 관한 연구 (Study on the measuring system of power quality for transmission system)

  • 김영노;신봉일;이희철;곽노홍;전영수;박상호;이일무
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.107-109
    • /
    • 2006
  • The additional matters appear to be considered in several aspects for building up power-quality measuring system of transmission system(high voltage system) compared to distribution system(middle or low voltage system). Like in distribution system, input signals are also received from PT and CT source of voltage and current respectively in transmission system and applied in accordance with a certain rate. In this case, very big error rate can be occurred according to the specification of the measuring system as the applying rate is bigger than in distribution system beyond comparison. In addition, when the abnormal signal occurred such as sag/swell, interruption, transient etc., power quality of other sites linked to the system also should be checked to find the accurate cause of the abnormal power-quality signals from the corresponding site. Accordingly, the accurate diagnosis on the condition of Power quality for the system depends on the way how the synchronization system is brought along for each site. This paper will suggest the solution for the most effective system building focused on how to solve the problem of the error rate and synchronization described in the above when building up the measuring system of power quality for transmission system.

  • PDF

Design of a Novel Multi-Dimensional HCOC Multi-code Spread Spectrum System Using Pre-coding Technique for High Speed Data Transmission of DS-CDMA

  • Kong, Hyung-Yun;Lee, Dong-Un
    • Journal of electromagnetic engineering and science
    • /
    • 제7권1호
    • /
    • pp.1-6
    • /
    • 2007
  • Recently, Mc(Multi-code) modulation/demodulation(modem) technique has been explored for high speed data transmission in wireless environment. The conventional Mc modem generates some side effects such as allocating Walsh codes, which motivates to propose a novel Mc modem method with sub-code. Our proposed system should expanded the size of sub-code to provide high-rate data transmission, which also affect adversely to the performance of the system with high PAPR(Peak to Average Power Ratio). Thus, in this paper, we propose a novel pre-coded Multi-Dimensional HCOC(High Capacity Orthogonal Code) Mc modem technique to reduce the high PAPR, which enables the performance improvement. This proposed system can be easily designed by concatenating HCOC Mc modem with the generic Mc modem. The pre-coding technique that is used in this paper is CAC(Constant Amplitude Coding), that helps the system maintain the constant transmission power and reduce the maximum transmission power.