• 제목/요약/키워드: Power System Planning

검색결과 665건 처리시간 0.035초

전력계통계획의 종합기계화에 관한 연구 (Study on the computer method for power system planning)

  • 송길영
    • 전기의세계
    • /
    • 제27권1호
    • /
    • pp.49-55
    • /
    • 1978
  • This paper describes a computer method for power system planning. Power system planning was usually studied through individual programs. Because of the laborious work involved in data preparation, the increase of task for power system planning and the time required for the detailed analysis of results, the available time for assessment and decision making has been sacrificed. In order to improve the above situation, the use of data base techniques an the simplified evaluation of the presented programs were newly developed. This program has been used successfully for the routine of power system planning in Korea Electric Company. In addition, this paper describes some results of analysis and evaluation of power system planning in KECO.

  • PDF

선형계획법을 활용한 장기 전력계통 계획수립 기법개발 (Long-term Power System Planning by using Mixed-Integer Programming)

  • 유헌수;조강욱;이조련;김태훈;김진이;박만근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.100-102
    • /
    • 2007
  • 본 논문에서는 혼합정수 선형계획 법을 이용하여 장기 전력계통 계획수립시 최적의 설비를 투자할 수 있는 기법을 제안하였다. 발전설비와 송변전설비는 하나의 망으로 연결되어 상호 보완적 영향을 주기 때문에 계통계획시 두 설비를 동시에 평가하는 것이 무엇보다 중요하다. 또한 계획기간 전체에 대해 투자비를 고려하여 비용을 최소화해야 한다. 이를 위해 선형계획법을 계통계획에 도입하여 최소비용의 투자비를 가지고 공급 신뢰도 기준를 만족할 수 있는 최적 장기 전력계통 계획 수립기법을 개발하였다. 개발된 기법을 Garver 6모선 계통 및 제3차 전력수급기본계획에 대해 모의하여 결과의 타당성을 검증하였다.

  • PDF

OPF를 이용한 중장기 전력계통 조상설비 계획수립 (Long-term Shunt VAr Planning using Optimal Power Flour)

  • 유헌수;배주천
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.301-303
    • /
    • 2005
  • This paper presents long-term shunt capacitor planning using optimal power flow. OPF allows the planning engineer to find feasible solution with minimal amount of engineering time. We used OPF for Shunt capacitor planning to get an optimal solution. The result of OPF is compared to the analysis by the conventional loadflow method and it is proved that OPF gives more cheaper and better planning solution. With the result, we analyzed the operational perspective for the reactive power supply and demand.

  • PDF

CBP 시장 체제하에서의 전력수급계획 수립 체계에 관한 연구 (A Study on the Generation Expansion Planning System Under the Cost Based Pool)

  • 한석만;김발호
    • 전기학회논문지
    • /
    • 제58권5호
    • /
    • pp.918-922
    • /
    • 2009
  • The power expansion planning is large and capital intensive capacity planning. In the past, the expansion planning was established with the proper supply reliability in order to minimize social cost. However, the planning cannot use cost minimizing objective function in the power markets with many market participants. This paper proposed the power expansion planning process in the power markets. This system is composed of Regulator and GENCO's model. Regulator model used multi-criteria decision making rule. GENCO model is very complex problem. Thus, this system transacted the part by several scenario assuming GENCO model.

Stochastic Integrated Generation and Transmission Planning Incorporating Electric Vehicle Deployment

  • Moon, Guk-Hyun;Kong, Seong-Bae;Joo, Sung-Kwan;Ryu, Heon-Su;Kim, Tae-Hoon
    • Journal of Electrical Engineering and Technology
    • /
    • 제8권1호
    • /
    • pp.1-10
    • /
    • 2013
  • The power industry is currently facing many challenges, due to the new environment created by the introduction of smart grid technologies. In particular, the large-scale deployment of electric vehicles (EVs) may have a significant impact on demand for electricity and, thereby, influence generation and transmission system planning. However, it is difficult to deal with uncertainties in EV charging loads using deterministic planning methods. This paper presents a two-stage stochastic decomposition method with Latin-hyper rectangle sampling (LHRS) to solve the integrated generation and transmission planning problem incorporating EV deployment. The probabilistic distribution of EV charging loads is estimated by Latin-hyper rectangle sampling (LHRS) to enhance the computational performance of the proposed method. Numerical results are presented to show the effectiveness of the proposed method.

전산 시스템을 이용한 배전계획 연구 - CADPAD를 이용한 배전계획 - (A Study on the Distribution Planning using Computer Systems)

  • 황수천;문병화;홍순학;장정태
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1993년도 하계학술대회 논문집 A
    • /
    • pp.205-207
    • /
    • 1993
  • Distribution planning requires comprehensive knowledge about not only distribution but also transmission/subtransmission system expansion plan. At the same time, distribution planning is very time consuming and a series of routine job which involves a lot of experience and efforts of planning engineers. Since the quality of distribution planning depends upon the ability of planning engineers, the economy of investment should be taken into consideration. The object of this study is to establish a computerized distribution planning system which helps distribution engineers finding a new system expansion plan. It provides the engineers with at optimal system expansion plan which satisfies the condition of both reliability and economy.

  • PDF

전력수급계획시스템 데이터베이스 설계 및 구축에 관한 연구 (A Study on The Database Design and Construction of Power System Operational Planning System)

  • 안양근;박시우;남재현
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 C
    • /
    • pp.1012-1014
    • /
    • 1998
  • This paper presents a database design for power system operational planning system of the integrated system for power system operational planning and analysis that will be more economical and stable of power system operation. An alias of the integrated system is Highly Integrated Total Energy System(HITES). We first describe the requirements for the Power System Planning System of HTES. Database design is processed in two phases(conceptual design and physical design), and CDM(Conceptual Data Model) and PDM(Physical Data Model) are generated by Powerdesigner(CASE tool for database design). In the future, the constructed database needs to be tested and tuning.

  • PDF

전력수급기본계획 수립을 위한 발송전 전력설비의 최적구성 방안 분석 (Analysis of Optimal Long-term Planning for Korea Power Systems)

  • 류헌수;조강욱;김태훈;이조련
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.214-216
    • /
    • 2008
  • 현재 전력수급기본계획은 전국을 한일권으로 하여 발전계획을 수립하고 송변전설비계획을 수립하고 있다. 그러나 발전설비와 송변전설비는 하나의 망으로 연결되어 상호 보완적 영향을 주기 때문에 수급계획시 두 설비를 동시에 평가하는 것이 무엇보다 중요하다. 본 논문에서는 혼합정수형 선형계획법(MIP)을 이용하여 발송전 전력설비를 통합적으로 최적 구성할 수 있는 방안에 대하여 분석하였다. 전력수급기본계획 수립시 제출된 건설의향설비에 대해 송변전설비와 통합하여 적정 예비율을 갖는 최적설비 구성방안을 수립하고, 이때의 설비투자비와 운전비를 분석하였다.

  • PDF

계통계획기준 수립을 위한 한전계통의 성능평가 (Performance Evaluation of Korean Power System for Developing the Planning Standards)

  • 국경수;오태규;김태현;김학만;방민재;이병준
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 A
    • /
    • pp.203-205
    • /
    • 2001
  • This paper is part of an ongoing project of KEPCO; 'A Study on Criteria and Standards for Transmission System Planning', The objective of this project is to develop the standards and procedures for transmission system planning. This involves reviewing published literatures, other documents of existing criteria and procedures, and various case studies of advanced countries which are already under the competitive electricity industry. This paper presents the result of evaluating Korean Power System as a pre-study for developing the Planning Standards of Korean Power System. For this, WSCC/NERC's performance criteria for planning transmission system, and KEPCO's 'Long Term Transmission System Planning Criteria' are considered. By doing this, the level of performance criteria which should be applied to Korean Power System and the detailed procedures which would be used in system test were reviewed.

  • PDF