• 제목/요약/키워드: Power System Measurement

검색결과 2,042건 처리시간 0.032초

차세대고속열차 종합계측시스템 최적화 방안 연구 (A Study on Optimization of the Overall Measurement System for HEMU-400X)

  • 이영엽;류상현;이진종;김경택
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1-6
    • /
    • 2011
  • In Korea, high-speed train(HEMU-400X) system with distributed power is being developed, and the highest test speed of this train is 400km/h. This developed the first high-speed train as a distributed power train in Korea, as well as for the development of train system and evaluation system included evaluation technology is needed. Accordingly, a comprehensive and efficient OMS(Overall Measurement System) was build up for verifying the performance of HEMU-400X. By the case study of the G7 and TTX, OMS of HEMU-400X was improved the test performance and maintainability. In particular, the existing Window-based systems has a limit to the control, due to this reason OMS applying enhanced RT(Real-time) system. In this study, compare the advantages and disadvantages of RT systems with Window-based systems, as well as the configuration of the RT systems.

  • PDF

원전 이동감시 및 방사선 측정용 원격조종 로봇 개발 (Development of a remote controlled mobile robot system for monitoring nuclear power plant)

  • 구관모;이범희;우희곤
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1996년도 한국자동제어학술회의논문집(국내학술편); 포항공과대학교, 포항; 24-26 Oct. 1996
    • /
    • pp.511-515
    • /
    • 1996
  • A remote controlled mobile robot system has been developed and tested to monitor the radiation area in the nuclear power plant. The mobile robot system operates according to car-driving-like commands and is capable of radiation measurement and visual inspection in unmanned situations under radiation. The robot system is equipped with a radiation sensor and two cameras with appropriate illumination set-ups. The camera with auto-focus function and 8-times zoom lens is mounted on the pan/tilt rotational base and the other is mounted on the front panel of the robot system. All commands regarding the motion of the mobile robot and various sensors are given through the monitoring system which is designed to provide an integrated man-machine interface.

  • PDF

Tone 방식을 사용한 위성 거리 측정에 대한 위성 링크 잡음의 영향 (Effect of satellite link noise for satellite range measurement using tone method)

  • 김영완
    • 대한전자공학회논문지TC
    • /
    • 제42권2호
    • /
    • pp.9-16
    • /
    • 2005
  • 톤 방식을 사용하는 위성 거리 측정 시스템의 위성 링크 잡음에 대한 열화도를 분석하였다. 상${\cdot}$하향 링크에서 발생되는 배경 잡음에 의하여 위성 거리 측정 위상 값에 열화가 발생되며, 열화도는 거리 측정 시스템의 루프 잡음 대역폭과 전송 모드신호에 의해 영향을 받는다. 분석된 잡음의 영향은 위성 잡음 환경에서 동작하는 거리 측정 시스템에서 측정된 열화도와 비교 분석하였다. RAU 전송 모드에서 위성 링크 신호의 신호대 잡음비$(C/N_o)$가 43 dB인 경우, 거리 측정 대역폭에 따라 약 $14.4\~40.6m$ 이내의 오차가 발생되었으며, 이론값에 비해서는 약 0.3 dB의 열화도가 발생하였다. 원격 측정 신호와 동시에 전송되는 모드에서는 RAU 전송 모드와 거의 동등한 성능을 보였으며, RAU 모드와 동일한 성능을 갖기 위해서는 RAU+TM 다중전송 모드에 따른 전력 손실 값으로 약 2.3 dB 증가된 위성 링크 신호의 신호대 잡음비가 요구되었다.

밀리미터파(W대역) 안테나 측정을 위한 원-전계 측정 시스템 설계 및 검증 (Design and Verification of Far-field measurement system for W-band Millimeter-wave Antenna)

  • 백종균;황인준;조치현;주정명;주지한;박종국;김재식;김소수
    • 한국인터넷방송통신학회논문지
    • /
    • 제22권2호
    • /
    • pp.43-50
    • /
    • 2022
  • 본 논문에서는 밀리미터파 W대역에서 동작하는 안테나 성능 측정을 위한 원-전계 측정 시스템을 설계하고 검증하였다. 안테나 성능 시험은 안테나의 종류, 측정 항목, 측정 환경 및 기간 등에 따라 측정 시스템을 선택해야 한다. 근접 전계 측정은 안테나가 다중 채널을 가지거나 다양한 빔을 가지고 있을 경우, 측정 항목이 증가하기 때문에 많은 시간이 소요된다. 이러한 안테나는 원-전계 측정을 통해 측정 시간을 단축 할 수 있고 필요한 측정 항목만 측정이 가능하다. 따라서 본 연구는 원-전계 측정 시스템을 고출력 레이저를 이용하여 정밀한 정렬을 확보하고 이중 증폭기 시스템을 적용하여 측정 정확도를 향상하였다. 설계된 시스템은 무반향 챔버 내 구축하였으며 검증된 근접 전계 측정 시스템과 비교하여 검증하였다.

도시철도 변전소의 네트워크 기반 실시간 데이터 취득 시스템 구현 (Implementation of a Real-Time Data Acquisition System Based on Wireless Communication for Urban Rail Transit Substation)

  • 정호성;박영;김형철
    • 전기학회논문지P
    • /
    • 제59권1호
    • /
    • pp.71-76
    • /
    • 2010
  • This paper is focused on implementing a real-time data acquisition system that checks power facility status by applying network based technology to Urban Transit substation power facilities and the results of its on-field tests. This system is composed of a sensor part, a measurement part, a transceiver part, a host computer, and a power source part. The system is designed to collect, save, analyze, and display the online state power facility AI (Analog Input). This system measures voltage and current from positive feeders and negative feeders where it is possible to check abnormalities of the substation‘s main power facilities. By monitoring abnormal data of the Urban Transit power facilities real-time and analyzing stored data, establishing procedures of optimized maintenance is possible.

전력설비의 정밀주파수진단을 위한 기법 (A Technique for Accurate Measurement of Power System Frequency)

  • 남시복;이훈구
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 춘계학술대회 논문집 전기설비전문위원
    • /
    • pp.66-70
    • /
    • 2006
  • Frequency is an important operating parameter of a power system. Electric power systems sustain transient frequency swings whenever the balance between generation and load does not no longer hold. To cope with this Constraints, il requires an accurate and high speedy frequency deviation estimation technique and suitable adjustment to obtain the power system energy balance. This paper describes the design, computational aspects and implementation of an iterative technique for measuring power system. The rate change of the phase angle is used for estimation. To confirm the validity of the proposed algorithm, the simulation studies carried out on a typical 154[KV] double T/L system by using EMTP software. Some test results are presented in the paper.

  • PDF

전력계통 주파수의 고속.정밀측정을 위한 기법 (A Technique for Fast and Accurate Measurement of Power System Frequency)

  • 남시복;이훈구;마석범
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 학술대회 논문집 전문대학교육위원
    • /
    • pp.68-71
    • /
    • 2004
  • Frequency is an important operating parameter of a power system. Electric power systems sustain transient frequency swings whenever the balance between generation and load does not no longer hold. To cope with this Constraints, it requires an accurate and high speedy frequency deviation estimation technique and suitable adjustment to obtain the power system energy balance. This paper describes the design, computational aspects and implementation of an iterative technique for measuring power system. The rate change of the phase angle is used for estimation. To confirm the validity of the proposed algorithm, the simulation studies carried out on a typical 154[KV] double T/L system by using EMTP software. Some test results are presented in the paper.

  • PDF

전력계통 주파수의 고속.정밀측정을 위한 반복기법 (An Iterative Technique for Fast and Accurate Measurement of Power System Frequency)

  • 남시복
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 학술대회 논문집 전문대학교육위원
    • /
    • pp.92-95
    • /
    • 2003
  • Frequency is an important operating parameter of a power system. Electric power systems sustain transient frequency swings whenever the balance between generation and load does not no longer hold. To cope with this Constraints. it requires an accurate and high speedy frequency deviation estimation technique and suitable adjustment to obtain the power system energy balance. This paper describes the design, computational aspects and implementation of an iterative technique for measuring power system. The rate change of the phase angle is used for estimation. To confirm the validity of the proposed algorithm, the simulation studies carried out on a typical 154[KV] double T/L system by using EMTP software. Some test results are presented in the paper.

  • PDF

두 개의 정현 신호를 이용한 속도 측정용 고전력 쏘나 시스템 개발 (Development of a High Power SONAR System Measuring Velocity by Using Two Gated Sinusoidal Signals)

  • 장순석;안흥구;이제형
    • 소음진동
    • /
    • 제9권5호
    • /
    • pp.1036-1041
    • /
    • 1999
  • This paper aims for the development of the high power sonar system for measuring the velocity of a moving object. The high power sonar system transmits two gated 190 kHz sinusoidal signals with 1.6 [ms] time interval to the moving object. Then the sonar system detects and calculates the changed time delay of the reflected ultrasonic signals in order to derive the velocity of the moving object. The transmission part uses a high power amplifier so that 250 W gated sinusoidal signals can be transmitted to the transmitter. 1M RAM is utilized for transmitting and storing of the ultrasonic signals. The time delay is calculted by the cross-correlation technique between the transmitted signals and the received signals. The measured value from the high power sonar system is compared with directly measured values by photo diodes. The result confirms the adjacency to 0.3% error.

  • PDF

전력계통 주파수의 고속측정을 위한 기법 (A Technique for Fast Measurement of Power System Frequency)

  • 남시복;김진수;마석범
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 학술대회 논문집 전문대학교육위원
    • /
    • pp.145-149
    • /
    • 2005
  • Frequency is an important operating parameter of a power system. Electric power systems sustain transient frequency swings whenever the balance between generation and load does not no longer hold. To cope with this Constraints, it requires an accurate and high speedy frequency deviation estimation technique and suitable adjustment to obtain the power system energy balance. This paper describes the design, computational aspects and implementation of an iterative technique for measuring power system. The rate change of the phase angle is used for estimation. To confirm the validity of the proposed algorithm, the simulation studies carried out on a typical 154[KV] double T/L system by using EMTP software. Some test results are presented in the paper.

  • PDF