The Transactions of The Korean Institute of Electrical Engineers
/
v.60
no.9
/
pp.1651-1655
/
2011
The reference impedances which is about 95% supply impedance value of residential consumers' supply impedances was published by IEC in 1980. The reference impedances are the standard values for use in determining the voltage disturbance characteristics of electrical equipment like the flicker. In IEC 60725, the reference impedances for premises having service current capacities less than 100A per phase and for service current capacities more than 100A per phase are recommended. And these reference impedances are targeted for the countries using 50Hz power frequency. Because of the frequency difference, the reactance values of the reference impedances will be increased in 60Hz power system like Korea, And also the reference impedances are different significantly each other according to declared voltage variation, power consumption and service wire length etc. Therefore It is needed to calculate the reference impedances suitable for domestic low-voltage power system. In this paper, the reference impedances for service current capacities less than 100A in 220/380V, 60Hz single-phase two wire and three-phase four wire low-voltage system are calculated, And the equations for service current capacities more than 100A to calculate the modulus value of maximum supply impedances are suggested base on IEC 60725 and the reference impedances for those are calculated on service current of 100A per phase.
Proceedings of the Korean Society of Propulsion Engineers Conference
/
2017.05a
/
pp.36-40
/
2017
The launch operation for a space launch vehicle(SLV) is to be conducted by the systematic operation between SLV and the Technological Equipment(TE) such as the mechanical, fuel, and electrical ground support equipment at launch complex(LC). The basic source for the operation of the instruments in LC is the electrical power supply system, Technological Equipment Power Supply System(TEPSS), which is one of the Launch Control System. Thus TEPSS should supply the required electrical power to TE with reliability. In this paper, TEPSS which supplies operational electrical power to TE is introduced.
Electric power system is consisted of power supply and power enable circuit. Power supply provides operating voltage with internal chip. Depending on the operating voltage, power enable circuit provides operating signal, PWREN. Because energy is obtained from signal of external station, passive transponder must have the low power consumption. In this paper, the power supply module of the low power transponder is designed and analyzed.
Kim, Dong-Hee;Kim, Jong-Soo;Choe, Gyu-Yeong;Lee, Byoung-Kuk;Kawk, Cheol-Hoon
The Transactions of the Korean Institute of Power Electronics
/
v.16
no.1
/
pp.20-29
/
2011
This paper proposes critical load following back-up system using MCFC stack. This system enables MCFC generation system to supply power to critical load without UPS and to generate rated power under grid fault state. This back-up system includes 'Load Leveler' that is connected with 3-phase inverter and is controlled by additional algorithm that includes critical load following. The proposed system and algorithm are verified by computer simulation based on 5kW system.
This paper represents the application of the Static Var Compensator(SVC) on the electric railway power supply system. The purpose of the electric equipment can be summarized as to improve electrical power quality and to maintain the voltage. This paper shows that the SVC is necessary for voltage compensation in the railway power supply system and verify effectiveness of the SVC through the simulation. In this paper, the case studies were performed with the various line length and train position.
The Transactions of the Korean Institute of Power Electronics
/
v.27
no.5
/
pp.397-401
/
2022
The construction of the ITER tokamak machine is ongoing at a 77% process rate to achieve the first plasma in 2025. The 18 sets of power supply systems comprising 400 MVA thyristor AC/DC converters for the superconducting magnets supplied by Korea (KO) are being installed with other systems, such as PF converters (China), DC busbars (Russia), and cooling water systems (India), in two buildings (Europe). The system interfaces have been defined during the design stage, and the systems have been manufactured. However, during the on-site installation work, several installation and integration issues emerged due to the manufacturing tolerance and design mistakes. To continue the installation and testing, the engineers of each system resolved the interface issues, planned the commissioning, and integrated the test plan. This paper describes the on-site installation status and issues and the commissioning plan of KO AC/DC converters.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.22
no.5
/
pp.31-40
/
2008
Recently, Contactless Power Supply(CPS) system has been broadly studied as a power supply system for Flat Panel Display(FPD) material transfer equipments. In mass production line, CPS systems on material transfer equipment are applied only in the straight sections with single operating vehicle. The formal CPS system was not adequate for curved section nor multiple operating vehicles. Therefore, this paper presents CPS system that consists of straight and curved section with multiple operation vehicles. The circuit topology of CPS system consists of full bridge configured serial-parallel resonant DC/DC converter. The control method for CPS system consists of duty control method on the primary power supply system to maintain constant resonant current. And the secondary power supply systems of multiple vehicles are self controled to maintain constant output voltage. Practically, the test result of dual vehicles on straight and curved section of material transfer equipments were satisfactory, and proved it's applicability on commercial use.
As part of the "Carbon free Island 2030" policy, the local government of Jeju Island is currently working to reduce carbon through renewable energy supply. However, renewable energy is difficult to predict due to intermittent characteristics. If the share of renewable energy increase, it is difficult to plan of supply of electricity to grid due to that characteristic of renewable. In this paper analyze the fluctuation rate and the capacity credit of wind power and PV to find out how much wind power and PV contribute to supply of electricity of power system in Jeju. As a result mean value of variation rate of wind power and PV is about 3%, 5% and capacity credit is about 10% and 2% respectively.
It is expected that industrial accelerator having been distributed fast in domestic these days will be widely used for various fields. In this study we deal with the basic consideration for the drive characteristic of power supply system in the system of industrial accelerator installed at Dongshin University. Beam energy of this system is 34keV~40KeV, 100A. The modulator emits a 11KV-380A pulse of $4.5\mu\textrm{s}$ duration that is transformed to about 34KV-40KV pulse by a pulse transformer.
Journal of Institute of Control, Robotics and Systems
/
v.12
no.3
/
pp.289-293
/
2006
In this paper, we developed a ground power supply system for a mobile robot moving in the constrained region. By using an external scan circuit through the electrodes, it is also possible to detect the absolute position and heading angle of the robot without any additional position sensors. Since the heavy weighted-battery for electric power and the expensive absolute position sensors are not necessary to the robot by using for proposed system, the mobile robot system becomes cost-effective and dynamically fast.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.