• Title/Summary/Keyword: Power Manage System

Search Result 369, Processing Time 0.029 seconds

Dynamic Virtual Organization Management System for Grid Based Information Retrieval Service (그리드 기반 정보검색 서비스를 위한 동적 가상 조직 관리 시스템)

  • Kim, Yang-Woo;Lee, Seung-Ha;Kim, Hyuk-Ho
    • The KIPS Transactions:PartD
    • /
    • v.13D no.7 s.110
    • /
    • pp.1009-1016
    • /
    • 2006
  • Under foundational precepts of Grid computing, two important requirements that all Grid application systems should satisfy are to accommodate the dynamic nature of Virtual Organizations (VOs), and to enforce different levels of security among different VOs. For the research described in this paper, we developed two different use-case scenarios addressing the two requirements, and then showed how the requirements can be met by implementing a Grid information retrieval (GIR) system prototype. The dynamic nature of VO applies not only to increasing and decreasing number of users, but also to the dynamically changing requirement of computing power among the different subcomponents that consist in overall system configuration. This implies that a request to increase computing power by a certain subcomponent can be satisfied by other idling subcomponents taking advantage of overall system flexibility. This paper describes how we implemented a Grid IR system using VO and security mechanisms provided by Globus toolkit 3.0, and shows how GIR system scalability and security can be improved for dynamic VOs. In order to manage different VOs, we implemented VO management service (VOMS), and registered it to Globus as an additional service.

A Study on the Actual Condition of Temporary Workers in Hospital (병원의 비정규직 실태조사)

  • Moon, Young-Joon;Ahn, In-Whan;Lee, Yong-Kyoon
    • Korea Journal of Hospital Management
    • /
    • v.12 no.3
    • /
    • pp.120-144
    • /
    • 2007
  • In 1997, in the course of overcoming economic crisis caused by the shortage of foreign currency there was a significant phenomenon, the irregularization of human labour resources. There was no exception in hospital, either. Most hospitals put a lot of thought to solve the problem about irregular workers. Between employee and employer the problem of irregular workers has been raised as a main topic of all. The objectives of this study were to inspect the actual state of irregular workers and to understand the positive effect of protecting irregular workers, recently established and revised, on the human resources management of hospitals. After enacting irregular labours protection acts there were many opinions that the labour rules of hospitals would be changed.(56.7%). The plan to solve irregular worker's wage issues would he carried out step by step, but some hospitals have not examined the plan yet,(81.9%). Many hospitals had a plan that irregular worker's wage would be actualized in two or three years.(78.3%) The method, to solve the problem of irregular workers arc as follows: 1) the introduction of functional wage system, 2) the convert from automatic rising wage system to annual wage system, 3) the incentive grade system according to management result, 4) lower functional group wage system, 5) non-term contract wage system. From the point of the opening medical market and securing competitive power of hospitals, it is prospected that irregular works would be increased also in future. So to manage irregular workers effectively would be essential in maintain hospital's competitive power and improve medical service. The result, of this study were a, follow: (1) In hospital, the ratio of irregular workers in hospitals was lower than that of all irregular workers in Korea. (2) In hospital, the wage level of irregular workers was higher than that of irregular workers in Korea. (3) In hospital, the social insurance application ratio of irregular workers was higher than that of all workers in Korea. (4) In hospital, there seems to be no appropriate and active measures to improve labour condition of irregular workers, yet. (5) In many hospitals, the policy of irregular workers would be expected to revised for the law standards. In this study the actual conditions and problems of irregular workers were proposed and it was expected to contribute decisions-making in hospital management, especially when using human resources.

  • PDF

A Study on the Energy Consumption Characteristics for Use and Operation Period in Office Buildings (업무용 건물의 용도 및 운전 기간별 에너지 소비 특성 연구)

  • Park, Byung Hun;Kim, Si Heon
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.29 no.11
    • /
    • pp.605-611
    • /
    • 2017
  • The purpose of this study is to calculate the energy consumption rate based on data regarding energy use in office buildings, and to confirm the general characteristics of energy consumption. The energy consumption rate of the building is calculated by dividing the energy consumption by the floor area. The energy consumption rate of small-sized office buildings was calculated as $101.48{\sim}201.55kWh/m^2{\cdot}year$ and in the case of medium-sized buildings, the range was $92.77{\sim}177.89kWh/m^2{\cdot}year$. In the case of small buildings, it was found that the energy consumption was $73.24kWh/m^2{\cdot}year$ in electronic device, $34.31kWh/m^2{\cdot}year$ in hot water supply, and $18.37kWh/m^2{\cdot}year$ in heating. In the case of medium-sized buildings, electronic devices was $73.08kWh/m^2{\cdot}year$, lighting was $18.35kWh/m^2{\cdot}year$ and heating, $15.37kWh/m^2{\cdot}year$. In all of the study buildings, the peak heating energy use was observed from 8:00 a.m. to 10:00 a.m during the winter, and the peak power management was required. Energy use at and around the midnight hour is confirmed to be 40~60% of weekly working hours, so it is necessary to manage power use at night time as well as during the day. In order to improve the accuracy of future studies, it is necessary to make efforts to secure the data with standardized energy measuring units for the various type of buildings.

A Scheme on Energy Efficiency Through the Convergence of Micro-grid and Small Hydro Energy (마이크로그리드와 소수력 에너지의 융합을 통한 에너지 효율화 기법)

  • Kang, Bo-Seon;Lee, Keun-Ho
    • Journal of the Korea Convergence Society
    • /
    • v.6 no.1
    • /
    • pp.29-34
    • /
    • 2015
  • As smart grid techniques developed, public attention is concentrating on energy efficiency. So it is necessary to study on new renewable energy in order to manage the energy within micro grid consisting smart grid. Among them, small hydro energy has the advantage of being installable anywhere depending the amount of water used by the users within micro grid. This study examines if the measured value is appropriate for small hydro power generation by measuring generation quantity and operation rate of generator based on the sewage flow used by apartments and multi-unit dwellings where those users live. Some appropriate apartments and multi-unit dwellings generate electricity with small hydro generator using sewage as potential energy. This study intends to suggest more effective management by introducing energy management system and electricity storage device of micro grid.

A Study on the Application of SE Approach to the Design of Health Monitoring Pilot Platform utilizing Big Data in the Nuclear Power Plant (NPP) (원전 상태 감시 및 조기 경보용 빅데이터 시범 플랫폼의 설계를 위한 시스템 엔지니어링 방법론 적용 연구)

  • Cha, Jae-Min;Shin, Junguk;Son, Choong-Yeon;Hwang, Dong-Sik;Yeom, Choong Sub
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.2
    • /
    • pp.13-29
    • /
    • 2015
  • With the era of big data, the big data has been expected to have a large impact in the NPP safety areas. Although high interests of the big data for the NPP safety, only a limited researches concerning this issue are revealed. Especially, researches on the logical/physical structure and systematic design methods for the big data platform for the NPP safety were not dealt with. In this research, we design a new big data pilot platform for the NPP safety especially focusing on health monitoring and early warning services. For this, we propose a tailored design process based on SE approaches to manage inherent high complexities of the platform design. The proposed design process is consist of several steps from elicitate stakeholders to integration test via define operational concept and scenarios, and system requirements, design a conceptual functional architecture, select alternative physical modules for the derived functions and assess the applicability of the alternative modules, design a conceptual physical architecture, implement and integrate the physical modules. From the design process, this paper covers until the conceptual physical architecture design. In the following paper, the rest of the design process and results of the field test will be shown.

Construction firm's CRM(Customer Relationship Management) Marketing strategy for housing market Focused on Model House (주택시장에서 건설회사의 CRM 마케팅 전략 - 모델하우스를 중심으로)

  • Choi Ik-Sung;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.113-121
    • /
    • 2005
  • The construction industry has also enolved according to the changes and requirements, therefore it coms to manage the relationships with customers. However, the customer management in the construction industry has not been quite genuine, since it has been mainly oriented for public relations and advertisements of companies. The genuine customer management should not only systemize customer data but also provide strategy to utilize it through managing relationships with customers as well as customer themselves. In this research, I have focused mainly on Model House. Marketing is very important planning & coordination to project. And I know that the development power of new product and promotion strategy as to customer needs and wants. The key factor in housing industry is the analysis of customer's needs that key success factor is execution of action plan to our customer. His success in business is in result of satisfaction for our high quality customer. Therefore the CRM system is add to customer satisfaction and increase earning power to a business

A Study on the Needs about Hospital Coordinator (병원 코디네이터의 도입 필요성에 대한 연구)

  • Ryou, Duk-Hyun;Richard Kim, Jin-Gu
    • The Journal of Information Technology
    • /
    • v.10 no.4
    • /
    • pp.69-83
    • /
    • 2007
  • As a hospital environment is reconstructed from supplier-centered values to consumer-centered ones for the existence in the rapidly changing medical market, it can be said that not only must old slogans such as unconditional restructuring, remodelling, etc. be reconsidered, but a new strategy for the development and renovation of a hospital must be urgently required. Accordingly, development of customer-oriented practical strategies is needed and it appears possible to develop marketing and manage contacts, as a practical management strategy, for raising satisfaction of internal and external customers. The ultimate goal of such strategy development may be to ensure consistent potential development by maintenance of existing customers and securing new customers through a strategy of satisfying both existing and new customers. It appears that the competition in the medial will be keener in the future by human resources, members of an organization, Under these circumstances, and in relation to appearance of a new type of occupation of a coordinator, if a hospital could offer appropriate service which can meet the demand of the customers by efficiently utilizing the limited resources through efficient management of contacts between the customers and personnel, the competitive power of a hospital would be much stronger. Therefore, it is necessary to seek customer-impressing management by utilizing a coordinator as a more specialized intermediary as well as many-sided contact management through positive introduction of an expert coordinator system for internal and external customer contact management. It is expected that a hospital can secure a competitive advantage in the market through strategy development supported by an expert coordinator and increasing competitive power by means of practice of a developed creative strategy.

  • PDF

A Study on the Methods for the Robust Job Stress Management for Nuclear Power Plant Workers using Response Surface Data Mining (반응표면 데이터마이닝 기법을 이용한 원전 종사자의 강건 직무 스트레스 관리 방법에 관한 연구)

  • Lee, Yonghee;Jang, Tong Il;Lee, Yong Hee
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.1
    • /
    • pp.158-163
    • /
    • 2013
  • While job stress evaluations are reported in the recent surveys upon the nuclear power plants(NPPs), any significant advance in the types of questionnaires is not currently found. There are limitations to their usefulness as analytic tools for the management of safety resources in NPPs. Data mining(DM) has emerged as one of the key features for data computing and analysis to conduct a survey analysis. There are still limitations to its capability such as dimensionality associated with many survey questions and quality of information. Even though some survey methods may have significant advantages, often these methods do not provide enough evidence of causal relationships and the statistical inferences among a large number of input factors and responses. In order to address these limitations on the data computing and analysis capabilities, we propose an advanced procedure of survey analysis incorporating the DM method into a statistical analysis. The DM method can reduce dimensionality of risk factors, but DM method may not discuss the robustness of solutions, either by considering data preprocesses for outliers and missing values, or by considering uncontrollable noise factors. We propose three steps to address these limitations. The first step shows data mining with response surface method(RSM), to deal with specific situations by creating a new method called response surface data mining(RSDM). The second step follows the RSDM with detailed statistical relationships between the risk factors and the response of interest, and shows the demonstration the proposed RSDM can effectively find significant physical, psycho-social, and environmental risk factors by reducing the dimensionality with the process providing detailed statistical inferences. The final step suggest a robust stress management system which effectively manage job stress of the workers in NPPs as a part of a safety resource management using the surrogate variable concept.

A Stochastic Bilevel Scheduling Model for the Determination of the Load Shifting and Curtailment in Demand Response Programs

  • Rad, Ali Shayegan;Zangeneh, Ali
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.3
    • /
    • pp.1069-1078
    • /
    • 2018
  • Demand response (DR) programs give opportunity to consumers to manage their electricity bills. Besides, distribution system operator (DSO) is interested in using DR programs to obtain technical and economic benefits for distribution network. Since small consumers have difficulties to individually take part in the electricity market, an entity named demand response provider (DRP) has been recently defined to aggregate the DR of small consumers. However, implementing DR programs face challenges to fairly allocate benefits and payments between DRP and DSO. This paper presents a procedure for modeling the interaction between DRP and DSO based on a bilevel programming model. Both DSO and DRP behave from their own viewpoint with different objective functions. On the one hand, DRP bids the potential of DR programs, which are load shifting and load curtailment, to maximize its expected profit and on the other hand, DSO purchases electric power from either the electricity market or DRP to supply its consumers by minimizing its overall cost. In the proposed bilevel programming approach, the upper level problem represents the DRP decisions, while the lower level problem represents the DSO behavior. The obtained bilevel programming problem (BPP) is converted into a single level optimizing problem using its Karush-Kuhn-Tucker (KKT) optimality conditions. Furthermore, point estimate method (PEM) is employed to model the uncertainties of the power demands and the electricity market prices. The efficiency of the presented model is verified through the case studies and analysis of the obtained results.

Computer Program Development for D$_2$O Upgrader Performance Management (중수승급기 성능관리 프로그램 개발)

  • Ahn, Do-Hee;Kim, Kwang-Rag;Chung, Hong-Suck;Kim, Yong-Eak;Jeong, Ill-Seok;Hon, Sung-Yull;Ko, Jae-Wook
    • Nuclear Engineering and Technology
    • /
    • v.22 no.1
    • /
    • pp.1-11
    • /
    • 1990
  • Heavy water is used as a moderator and a coolant in the pressurized heavy water reactor Because of the high cost of heavy water, downgraded heavy water generated in the reactor system is recycled to the reactor after being concentrated up to 99.8% or more in heavy water upgraders. This study investigates the process of upgraders and then suggests a theoretical model. The relations between process variables are derived from tower packing characteristics, vapour-liquid equilibria, and mass-heat balance equations at a steady state operation of the upgrader h computer program UPGR is developed, using the algorithm that solves the nonlinear equations step by step. It shows that the results of computer simulation are in good agreement with the operating data of the Wolsung upgrader. Thus, this computer code offers the optimum operating guide and is now applied to manage the performance of upgraders for the effective operation of the heavy water upgraders.

  • PDF