• 제목/요약/키워드: Post-environmental investigation

검색결과 65건 처리시간 0.024초

주성분분석을 이용한 환경영향평가와 사후환경조사의 비교 및 평가에 관한 사례연구 (A Case Study on the Comparison and Assessment between Environmental Impact Assessment and Post-Environmental Investigation Using Principal Component Analysis)

  • 조일형;김용섭;조경덕
    • 한국환경보건학회지
    • /
    • 제31권2호
    • /
    • pp.134-146
    • /
    • 2005
  • Environmental monitoring system has been adopted and supplemented as inspection measures for the quantitative and qualitative changes of environmental impact assessment (EIA). This study compares the results of environmental impact assessment with the results of post-environmental investigation using a correction and principal component analysis (PCA) in the housing development project. Correlation analysis showed that most of air quality variables including TSP, $PM_{10},\;NO_2$, CO were linearly correlated with each other in the environmental impact assessment and the post-environmental investigation. In the water quality, pH and BOD were well correlated with the DO and SS, respectively. As a result of correlation analysis in the noise and vibration, noise in day and night and vibration in day and night were related to each other between EIA and the post-environmental investigation. From the results of analysis of soil, Cu with Cd, Cu with Pb, and Cd with Pb were related to each other in EIA. Principal component analysis (PCA) showed a powerful pattern recognition that had attempted to explain the variance of a large dataset of inter-correlated variable with a smaller set of independent variables (principal components). Principal component (PC1) and principal component (PC2) were obtained with eigenvalues> 1 summing almost $90\%$ of the total variance in the all of the items(air, water, noise, vibration and soil) in EIA and post-environmental investigation.

환경보전의식에 대한 도시하천 조사 활동의 학습 효과 (The Influence of Urban Stream Investigation on Students' Environmental Conservation Awareness)

  • 정미선;심태훈
    • 한국환경교육학회지:환경교육
    • /
    • 제22권2호
    • /
    • pp.79-91
    • /
    • 2009
  • The purpose of this study is to find out the influence of the urban stream investigation on elementary school students' environmental conservation awareness. The urban stream investigation was applied to the experimental group and the control group has been taught by the traditional teaching method focused on the teacher's lecture. To analyze the effect of urban stream investigation, the pre- and post-tests on environmental conservation awareness composed of interest in living things, perception about water pollution and environmental conservation were applied to the both groups. The results were analyzed by One-way ANOVA and ANCOVA. As a result, there were not significant difference between the experimental and the control group in the pretest(p>.05). In the post-tests on the student's interest in living things, perception about water pollution and environmental conservation the scores of the experimental group were higher than those of the control group(p<0.05). Therefore, the urban stream investigation made a positive effect on improving of elementary school students' environmental conservation awareness.

  • PDF

소음지도를 활용한 환경소음 관리계획 수립 (Establishment on Management Plan of Environmental Noise with Noise Map)

  • 선효성
    • 환경영향평가
    • /
    • 제20권2호
    • /
    • pp.123-131
    • /
    • 2011
  • The objective of this study is to prepare the effective management plan of environmental noise with a noise map, and the guideline on the management plan of environmental noise was suggested through the review of existing application examples. The management plan of environmental noise with a noise map includes the practical contents in the stages of subdivision of management areas, establishment of reduction measures, opinion collection, post investigation, and reformulation of management plan. First, the classification of management regions is performed considering the excess degree of noise standard and the facility type in the phase of subdivision of management areas. Second, the optimal management plan is established through the investigation of regional characteristics and various noise reduction measures in the phase of establishment of reduction measures, which includes the examination of noise reduction effects with a noise map and the budget planning with the costing of noise reduction measures. Third, the opinion survey with a local resident and a expert is carried out in order to prove the validity of the management plan in the phase of opinion collection, and the management plan is modified with gathered opinions. Fourth, the post examination plan with noise measurement is performed in order to verify the real effect of noise reduction measures according to the management plan in the phase of post investigation. Finally, the amendment of the management plan as well as the improvement of a noise map is carried out at a regular cycle in the phase of reformulation of management plan.

환경영향평가와 사후환경조사의 비교에 관한 연구 - 태안화력발전소 사례분석 - (The Study on the Improvement of Environmental Assessment Method through Analysis of Environmental Investigation Results of Taean Thermal Power Plant)

  • 전상기;이성철
    • 환경영향평가
    • /
    • 제9권1호
    • /
    • pp.61-74
    • /
    • 2000
  • This study compares the results of environmental impact assessment with the results of post-environmental investigation, using the case of Taean thermal power plant construction. The atmospheric and water qualities were not greatly changed before and after the construction of the power plant. However, the site of the highest concentration predicted by the atmospheric quality modeling in environmental impact assessment was different from that after operation of 4 power plants. There was also a difference in the diffusion range of thermal discharge water between the measured result(1km) and the predicted value(1.5km) with the model. Thus, environmental impact evaluation should be based on long-term (more than a year) environmental monitoring data. For the modeling of atmospheric quality and numerical thermal discharge water diffusion, appropriate models for each plant should be selected and the numerical modeling should be accompanied by computer simulation, wind tunnel test, etc. Moreover, environmental evaluation should focus more on the degree of impact on surroundings than the prediction of changes in surroundings caused by operation of plants.

  • PDF

개발 사업에 의한 수질영향조사 및 사후환경영향조사 수질결과에 대한 비교·분석 -토석채취사업 및 체육시설 조성사업을 중심으로- (Effects on Water Quality in the Development and the Comparative Analysis of Water Quality Results in Post-environmental Impact Investigation - Focused on a Quarry Mine and Sports Facilities -)

  • 이세용;노영희;조한나;맹준호
    • 환경영향평가
    • /
    • 제26권6호
    • /
    • pp.524-537
    • /
    • 2017
  • 사후환경영향조사 결과의 신뢰도 제고에 대한 문제가 대두되어 왔으나 조사결과에 대한 객관적인 검증을 수행한 연구가 미흡한 실정이다. 본 연구에서는 개발 사업에 의한 수질영향을 조사하였고 그 결과를 바탕으로 사후환경영향조사 시 수질분야에 결과와 비교 분석을 수행하였다. 토석채취사업장 내 오수처리시설 최종방류수에 Biochemical oxygen demand(BOD), Suspended solid(SS), Total nitrogen(T-N), Total phosphorus(T-P) 농도가 높게 나타났다. 사후환경영향조사 결과와 비교한 결과, 오수처리시설 최종방류수의 BOD, SS, T-N, T-P 농도가 사후환경영향조사 시 분기별 농도의 사분범위(Interquartile range, IQR)와 최소값과 최대값의 농도범위보다 높게 나타났다(p<0.05). 체육시설(훈련원) 조성사업의 경우에는 오수처리시설 최종방류수에 BOD, SS, T-N, T-P가 높은 농도로 검출되었고 BOD와 SS 농도는 협의기준을 초과하였다. BOD와 SS 농도는 사후환경영향조사 시 오수처리시설 최종방류수의 농도와 유의한 차이를 나타냈다(p<0.05). 이러한 연구결과, 개발 사업 시 오수처리시설 최종방류수에 대한 체계적인 수질 모니터링과 적절한 수질관리가 수행되어야 할 것이다. 또한 사후환경영향조사결과의 신뢰도 제고를 위한 방안이 모색되어야 할 것이다.

도로비탈면 녹화공사의 사후환경평가 항목 제언 (Suggestion of the Post-Environmental Evaluation of Road-side Cut Slope after Revegetation Works)

  • 김태국;김남춘;김은범;구민규
    • 한국환경복원기술학회지
    • /
    • 제21권4호
    • /
    • pp.75-86
    • /
    • 2018
  • This research was thereby made to study and analysis ecological, landscape, and stability qualities of roadside cut Slopes in expressways and national highways that went through revegetation works. Also, evaluation items and framework for integrated assessment of plant structure and restored state for the maintenance were suggested. Following is the summary of the result. firstly, for stabilization of introduced native plant species on roadside cut slops, assessment on the post-project environmental management through long-term monitoring and maintenance works must be made. It signifies a form of authentic recovery and restoration by the native plants. second, current evaluation framework on the test beds is well managed with clear evaluation standards and table while its method of assessing the post management with only test bed results lacks conformity with this study site. Newly developed evaluation framework on the post construction sites is estimated to be used as assessment standards on any roadside construction sites. Third, after site investigation distinction was observed among different revegetating construction types in the long-term perspective. Due to the different duration time of vegetation state between seed-spray measures(degraded in time) and layer-spray measure(maintained), the use of coarse straw-mat mulching work or Coir net was suggested in long term maintenance of cut slopes. forth, segmentation of post environmental assessment is organized into three large categories of "ecological", "stabile", and "landscape" qualities regarding post restoration quality and stability of slope through native plants with which categories marks 50, 30, 20 points of rates. fifth, components of the post environmental assessment were segmented in twelve categories driving results from former experimental construction and newly focused items on site. In the future, it is possible to propose a customized assessment method considering the location and location of construction work if the research on the application of post-environment assessment methods for road construction surface recording is conducted systematically.

Seasonal Dynamics of Arbuscular Mycorrhizal Fungi (AMF) in Forest Trees of Chittagong University Campus in Bangladesh

  • Nandi, Rajasree;Mridha, M.A.U.;Bhuiyan, Md. Kalimuddin
    • Journal of Forest and Environmental Science
    • /
    • 제30권3호
    • /
    • pp.277-284
    • /
    • 2014
  • Status of Arbuscular Mycorrhizal (AM) colonization in seven tree species (Albizia saman, Acacia auriculiformis A. Cunn. ex Benth., Albizia lebbeck, Chickrassia tabularis A. Juss., Eucalyptus camaldulensis Dehnn., Gmelina arborea (Roxb) DC, Swietenia macrophylla King.) collected from the hilly areas of Chittagong University (CU) was investigated. Roots and rhizosphere soil samples were collected in different seasons (pre-monsoon, monsoon and post monsoon). Percentage of AM colonization in root and number of spores/100 gm dry soil were assessed. The result of the investigation reveals that the intensity and percentage of AM colonization varied in different forest tree species in different seasons. In this study, maximum AM colonization and spore population were found in pre-monsoon and minimum were in monsoon season. The intensity of colonization was maximum in C. tabularis (74.43%) in pre-monsoon, A. lebbeck (69.45%) in monsoon and S. macrophylla (67.8%) in post monsoon seasons and minimum in A. auriculiformis (53.75%) during pre-monsoon, A. saman (24.4%) in monsoon and A. saman (19.36%) in post monsoon. The number of spores found per 100 g dry soil ranged between 164-376 during pre-monsoon, 27-310 during monsoon and 194-299 in post monsoon season. Out of six recognized genera of AM fungi, Glomus, Sclerocystis, Entrophospora, Scutellospora, Acaulospora and other unidentified spores were observed.

대기질 영향평가와 예측방법에 대한 개선방향 (A Method of Improving Air Quality Impact Assessment and Prediction)

  • 박종길;원경미;김성수
    • 한국환경과학회지
    • /
    • 제3권2호
    • /
    • pp.77-88
    • /
    • 1994
  • When we conduct environmental impact assessment, main contents consist of summary, project outline, environmental conditions, environmental impacts due to the project, mitigation devices, and alternative measures of harmful impact on environment. In this Paper, to understand how they really conduct air quality impact assessment and prediction and examine their effectiveness, we considered the provisions and actual case of environmental impact assessment in Korea with that in Japan. As a result, we propose a method of improving air quality impact assessment and Prediction, such as reflection of the result in environmental impact assessment, detailed assessment focused on relatively important environmental impact elements, field measurement investigation over four season and seven sucessive days, the uniformity of units, the proper model development to predict environmental concentration and a biennial environmental impact assessment for ex post management.

  • PDF

감쇠효과(減衰效果)를 고려한 비보존력계(非保存力系)의 동적(動的) 후좌굴(後挫屈) 해석(解析) (The Dynamic Post-Buckling Analysis of the Non-Conservative System including Damping Effects)

  • 김문영;장승필
    • 대한토목학회논문집
    • /
    • 제10권3호
    • /
    • pp.67-75
    • /
    • 1990
  • 보존력 및 비보존력을 받는 평면뼈대 구조물의 동적 후좌굴거동을 추적하기 위하여 비보존력의 방향변화를 고려할 수 있는 기하적인 비선형 유한 요소해석 방법을 제시하였다. 보존력계와 비보존력계에 대하여 내적 및 외적감쇠효과를 고려하는 비선형 패트릭스 운동 방정식을 유도하고 Newmark 방법을 사용하여 수치적으로 직접 적분하였다. Post-divergence 및 Post-flutter 현상들응 보여주는 해석예제들을 통하여 내적 및 외적감쇠하중이 이러한 비선형 동적 후좌굴거동들에 미치는 영향들을 조사하였다.

  • PDF

전략환경평가 모형의 개발과 적용에 관한 연구(I): 도시기본계획 평가를 중심으로 (A Study on the Application and Development of the Strategic Environmental Assessment(SEA) Model with Reference to Urban Comprehensive Plan)

  • 성현찬;김귀곤
    • 환경영향평가
    • /
    • 제6권1호
    • /
    • pp.5-31
    • /
    • 1997
  • Strategic Environmental Assessment (SEA) is an assessment process integrated with policy and planning processes considering environmental impacts, not at the level of individual project, but at higher level of policy and plan. Presently, two systems for the SEA are being implemented in Korea. One is "the consultation of environmental investigation into a change in national land utilization", which is to be pre-discussed with the head of the related central administrative organizations, based on the respective individual code. The other is "the consultation of environmental investigation into an administrative plan and project", which is to be pre-discussed with the minister of the environments for the administrative plan. However, these two systems are not integrated procedures with the planning process. In other words, there is a separate post-environmental assessment after planning. Also concrete proposal is not yet prepared for the method and procedure of environmental investigation about details of the planning. Therefore, they do not playa role in taking precautions for environmentally sustainable development. In this study, for the effective environmental investigation at the level of planning, environmental assessment model to be integrated with urban comprehensive plans was developed. The results of this study can be summarized as follows: First, based on the analysis of systematic problems in environmental investigation of this country, the study compared and analysed the SEA method of foreign countries. derived the potential limitations in its applications to this country. Also, the new method in this study, is integrated into planning process by improving the limitations. Thus, we developed the SEA model for this country, which consists of seven steps ; Phase 1; establishing a work program, Phase 2; defining the scop. of the SEA, Phase 3; analyzing an existing environmental situation, Phase 4; examining the consistency with environmental policy, Phase 5; appraising and synthesizing the plan content, Phase 6; proposing recommendations, Phase 7; monitoring and feedback. Second, the two types of application program of the developed assessment model were proposed. One is to integrate this model into planning process, and the other is for the institute and ministry of environments to implement SEA after planning. An aim of this study was developing an environmental assessment model at the planning level which was not yet established in this country and was to apply the model to urban comprehensive plan for inspection. This research will make the effective operation of environmental investigation system possible at the planning level in this country and contribute to the environmental protection at the global level.

  • PDF