• Title/Summary/Keyword: Post-Management System

Search Result 695, Processing Time 0.029 seconds

A Study on the Need of Specialized Institution for Post-Evaluation of Construction Projects (건설공사 사후평가 전문기관 설치 필요성 연구)

  • Lee, Du-Heon;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.285-295
    • /
    • 2016
  • The post-evaluation system after construction projects can evaluate estimates of use demand, project cost, and project schedule estimated in the planning phase of construction projects in public sector. Thus, it was introduced in 2000 for the purpose of reduction in future errors during similar constructions by project orderer by referring the post-evaluation results. However, many barriers to the post-evaluation system after construction projects have been reported due to evaluation systems that lack objectivity and reliability and lack of main bodies that utilize the system. Thus, this study derived implications for improvements of the post-evaluation system in Korea by benchmarking building project evaluation system and management as well as utilization systems of developed nations. Then this study conducted a survey with experts who have experienced activities in the post-evaluation committee and members of post-evaluation for public project owners. Therefore it identified the need of installation of specialized post-evaluation institutions as well as functions and work tasks to be taken by specialized institutions. Based on the analysis results, this paper provided revision drafts of related legislations and guidelines to be effective in post-evaluation. Through the study results, many trial and errors can be reduced in similar projects in the future by performing in-depth analysis on large-scale construction projects and repeatedly applied building project practices can be improved to raise technical competitiveness if the specialized institution is installed.

Post-COVID-19 Syndrome: The Effect of Regret on Travelers' Dynamic Carpooling Decisions

  • Li Wang;Boya Wang;Qiang Xiao
    • Journal of Information Processing Systems
    • /
    • v.20 no.2
    • /
    • pp.239-251
    • /
    • 2024
  • Coronavirus disease 2019 (COVID-19) has severely curtailed travelers' willingness to carpool and complicated the psychological processing system of travelers' carpooling decisions. In the post-COVID-19 era, a two-stage decision model under dynamic decision scenarios is constructed by tracking the psychological states of subjects in the face of multi-scenario carpooling decisions. Through a scenario experiment method, this paper investigates how three psychological variables, travelers' psychological distance to COVID-19, anticipated regret, and experienced regret about carpooling decisions, affect their willingness to carpool and re-carpool. The results show that in the initial carpooling decision, travelers' perception gap of anticipated regret positively predicts carpooling willingness and partially mediates between psychological distance to COVID-19 and carpooling willingness; in the re-carpooling decision, travelers' perception gap of anticipated regret mediates in the process of experienced regret influencing re-carpooling willingness; the inhibitory effect of experienced regret on carpooling in the context of COVID-19 is stronger than its facilitative effect on carpooling willingness. This paper tries to offer a fact-based decision-processing system for travelers.

Development of Structural Analysis and Construction Management System for Composite Cable Stayed Bridges (합성형 사장교의 시공단계해석 및 시공관리 시스템 개발)

  • 서주원;박정일;김남식;심옥진
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1994.10a
    • /
    • pp.95-102
    • /
    • 1994
  • This paper presents a Cable Stayed Bridge Construction Management System, which consists of Structural System Identification Method (SSIM), Error Sensitivity Analysis and Optimum Error Adjustment & Prediction System. The 1st System Identification Method builds an error influence matrix using the linear superposition of each error modes. The 2nd SSIM also considers the second error mode term, which shows good error factor estimation. The optimal cable adjustment can be accomplished within the allowable range of both cable tension and camber. The Post processor, constituted with Motif and GL library on SGI platform, is useful for monitoring construction stage management by displaying construction data, adjustment and prediction results at each construction step.

  • PDF

The Study on the Cost Analysis Based on ABC System in Clinical Laboratory (활동기준원가시스템을 이용한 임상병리과 검사 서비스 원가 분석)

  • 전기홍;김보경;안태식;조우현
    • Health Policy and Management
    • /
    • v.8 no.2
    • /
    • pp.88-109
    • /
    • 1998
  • The main purpose of this study is to compare the traditional cost system and ABC(Activity Based Cost) system of clinical laboratory department in a hospital. The study subject was 296 services in clinical laboratory from March, 1997 to August, 1997. In a new costing system, cost for a lab test consist of direct cost element, activity based cost element, and allocated common cost element. In a traditional cost system, cost elements included direct cost element and indirect cost allocated based on test volumes The major findings of this research were as follows. 1. In the application of ABC system, total cost was analyzed as follows. Direct cost was 39.3% of total cost. Activity cost and allocation were 20.9% and 39.8%, respectively. The results of analysis to use traditional cost system were as follows. Direct cost was 39.3% and it was as same as the result of direct cost of ABC system. Indirect cost was 60.7%. 2. Activities of clinical laboratory of subject hospital were registration, pre-test operation, test, test result handling, delivery, culture, post-test operation, technical support, management support, and educational support. 3. The differences of the case of higher number of test case being carried out, the cost of ABC system was lower than the cost of traditional cost system. Otherwise in the case of lower number of test case being carried out, the rests have not been appropriately evaluated, and effective management were needed in clinical laboratory.

  • PDF

A Method of Selecting Priority Support Villages by Establishing an Post Evaluation System for Rural Development Projects - In the Case of Rural Development Projects of Taean-gun - (일반농산어촌개발사업 사후평가체계 정립을 통한 우선 지원마을 선정 방법 - 태안군 일반농산어촌개발사업을 중심으로 -)

  • Yang, Ji-Eun;Noh, Yun-Jin;Lee, Jae-Ho
    • Journal of Korean Society of Rural Planning
    • /
    • v.27 no.4
    • /
    • pp.71-82
    • /
    • 2021
  • A diverse rural development projects are continuously increasing. However, in most villages, the business run by residents is not being operated normally. Followed by these problems, a follow-up management evaluation system has been created and utilized, but the existing evaluation system is only administratively approached and not suitable for application in reality. This research emphasizes that the perspective of community and re-startup support should be added to the evaluation system as these are projects that are carried out to improve the quality of life of local residents and enhance the rehabilitation of villages. Based on the evaluation system proposed in this study, field surveys and interview surveys were conducted targeting 10 villages in Taean-gun, Chungcheongnam-do in South Korea. As a result of the study, various types that have not been activated were derived, and they were presented by categoriz ing them. The purpose of this study is to help the rehabilitation of common rural villages by providing a updated post evaluation system and items that can be applied not only to Taean-gun but also to numerous villages in the entire villages in South Korea.

Establish of Evaluation level in Public Management System using Policy Evaluation Framework in Urban Renewal Project (정책평가 틀을 이용한 도시정비사업 내 공공관리자제도의 평가기준 수립에 관한 연구)

  • Lee, Jeong Jae;Lee, Joo-Hyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.5955-5967
    • /
    • 2015
  • This study targets to recognize needs of adopting public management system in Urban Renewal Project. and to establish evaluation level of public management system using policy evaluation framework for establishing perspective and systemic level. Also, this study constructed basic principles as expanded concept like Public, expertise, participation, rationality, and sustainability based on previous studies and expert opinion. AHP analysis results are following. In case of upper level, post management and continuity are important factors. Also in case of under level, making stable economic system, honest operating system, reducing development costs, local development with self-sufficiency were important factors. through empirical results, the implications are following. First, public management system needs to develop a consistent principle from planning step to post management. Second, it is essential point that continuous retraining between involved people and drawing residents participate in progress activity. Third, when evaluating public management system, it is need that emphasize non-physical factor like conflict issue between stakeholder.

A Decision Support System for Supplier Selection in B2B E-procurement (전자조달을 위한 공급자 선택 지원 시스템의 개발)

  • 하성호;남미성
    • Korean Management Science Review
    • /
    • v.21 no.1
    • /
    • pp.113-129
    • /
    • 2004
  • Nowadays many enterprises build e-procurement systems. An e-procurement is a Web-based procurement process and its functionalities are considered important in the B2B e-commerce. Buyers should select competent suppliers for a successful e-procurement. Therefore, this study proposes a method using the analytic hierarchy process(AHP) for building a Web-based supplier selection system. In detail, the purpose of this study is (1) to review methods previously used when buyers selecting suppliers and to extract important selection criteria: (2) to explain extended AHP method adopted by this study among supplier selection methods: (3) to describe the supplier selection steps using extended AHP : and (4) to propose a decision support system embedding the methodology described above. The proposed system comprises of three phase: first phase is to evaluate suppliers on enterprise level: second phase to evaluate them on each transaction level: third phase to post-evaluate them.

Development of an Inspection Data Management System for Concrete Structures (콘크리트구조물의 외관손상정보관리 시스템 개발)

  • Oh, Kwang-Chin;Choi, Jae-Ho
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05a
    • /
    • pp.562-565
    • /
    • 2006
  • Recently, the public interest for infrastructure safety has been growing, but the process of data acquisition and management system for safety is being carried out in an inefficient manner. The data obtained during the inspection for the safety of infrastructure tends to be documented using papers, which is not efficient in the stage of post analyses. The information technology (IT), which is rapidly being developed, is applied to the new system as a solution. Information technology provides valuable tools for converting and generating digital data, handling the history of defects, and assessing the condition and estimating the service life of infrastructure. The purpose of this paper is to introduce Infrastructure Management System(IMS). It is expected that the IMS would minimize the manpower, time and maintenance cost, and improve the safety of infrastructure.

  • PDF

Automation technology for analyzing 3D point cloud data of construction sites

  • Park, Suyeul;Kim, Younggun;Choi, Yungjun;Kim, Seok
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1100-1105
    • /
    • 2022
  • Denoising, registering, and detecting changes of 3D digital map are generally conducted by skilled technicians, which leads to inefficiency and the intervention of individual judgment. The manual post-processing for analyzing 3D point cloud data of construction sites requires a long time and sufficient resources. This study develops automation technology for analyzing 3D point cloud data for construction sites. Scanned data are automatically denoised, and the denoised data are stored in a specific storage. The stored data set is automatically registrated when the data set to be registrated is prepared. In addition, regions with non-homogeneous densities will be converted into homogeneous data. The change detection function is developed to automatically analyze the degree of terrain change occurred between time series data.

  • PDF

PMI Using Knowledge Management Viewed from Merger of Hanil Bank and Commercial Bank of Korea (지식경영을 활용한 기업인수 후 합병후 통합(PMI) : 한일은행과 상업은행의 합병 사례를 중심으로)

  • Jekarl, Jeong-Oung;Choi, Dosoung
    • Knowledge Management Research
    • /
    • v.9 no.1
    • /
    • pp.97-116
    • /
    • 2008
  • The purpose of this study lies in examining how knowledge management was applied to PMI(Post Merger Integration) in bank merger. Individuals and organizations in Korea have experienced a lot of changes since the 1997 foreign exchange crisis. In such a situation, individuals came to think the only thing to rely on was personal knowledge. Since organizations had to lay off workers in order of their birth year, not based on whether or not individuals had the knowledge necessary for the organizations, they needed to have such a system that could use their explicit knowledge and even outside knowledge or customers' knowledge as IT developed by changing individuals' tacit knowledge into explicit knowledge as needed in order to continue to maintain their competitiveness and for their own development. Thus, each firm started to pitch for the introduction of knowledge management. Individuals started to store their own experience and knowledge in their homepages or blogs. It was Woori Bank, the merged bank of Hanil Bank and Commercial Bank of Korea, that introduced the knowledge management system and Shared Service Center, in which knowledge creation is available, for the first time in the banking business. Its previous name was Hanbit Bank. Hanbit Bank wanted to construct an advanced bank system, bringing in their chief information officer(CIO) from a foreign bank and introducing an IT software used in Spanish banks to adjust all banking processes to it. However, they could not help giving up the plan in the middle of the road since there was a great difference between Spain and Korea in the financial system and more than 30% of software package had to be changed. In this situation, PMI was delayed, and customer inconvenience continued, which made the integration of organizational cultures slow down. As a breakthrough in this situation, knowledge management was introduced. To integrate knowledge of two organizations in the process of PMI is an important job for all merger candidates. This study aims at presenting the successful results from using knowledge management as a means to PMI ahead of other financial institutions so they can apply them to their organizations. PMI was not achieved properly after the two banks had been merged as Hanbit, but entering the era of Woori Bank, workers were integrated under one standard organization following the organizational and knowledge integration, and knowledge management was introduced for an efficient sharing of knowledge among members. A great number of mergers have occurred up to now, but Woori Bank is the first case that used knowledge management as a means to both PMI and competitiveness enhancement. Probably it was an appropriate time when Woori Bank introduced knowledge management as it was organized. Since Hanil Bank and Commercial Bank of Korea had not introduced knowledge management until then, it could use knowledge management as a means to PMI. Using knowledge management, it could create a new organizational culture and increase competitiveness in the banking industry.

  • PDF