• Title/Summary/Keyword: Post-Management

Search Result 2,816, Processing Time 0.039 seconds

A study on the optimal parameter design by analyzing the ordered categorical data (순차 범주형 데이타분석을 위한 최적모수설계에 관한 연구)

  • 전태준;홍남표;박호일
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1992.04b
    • /
    • pp.188-197
    • /
    • 1992
  • 제품 개발에 관한 응용 연구 혹은 개발 연구의 실험 결과가 품질특성의 본질적인 성격이나 측정시의 편의때문에 순차 범주형 자료(ordered categorical data)로 분류되는 경우가 있다. 본 논문에서는 망목 특성 문제(nominal-the-best type problem)를 분석하는데 있어서 기존의 다구찌 누적법이 순차 범주형 자료분석법이 안고 있는 문제점들을 고찰하고, 이를 개선하기 위해 품질손실에 근거한 목표 누적법을 제시한다. 본 논문에서 제시한 기법을 post-etch contact window데이타에 적용해 본 결과 인자의 최적수준을 결정하는데 용이하였다.

  • PDF

Development of a Critical Pathway for Patients with Coronary Artery Bypass Graft (관상동맥 우회술 환자를 위한 Critical Pathway개발)

  • 김기연
    • Journal of Korean Academy of Nursing
    • /
    • v.28 no.1
    • /
    • pp.117-131
    • /
    • 1998
  • The purpose of this study was to develop a critical pathway for case management for patients who have received Coronary Artery Bypass Graft (CABG) because of Ischemic Heart Disease(IHD) which is a factor of rising medical expenses. For this study. a conceptual framework was developed through a review of the literature including six critical pathways which are currently being used in USA. In order to identify the overall service contents required by these patients and to draw up a preliminary critical pathway, 30 cases of medical records of patients who had CABG because of IHD between January, 1995 to June. 1996 at the Cardiovascular Center of Yonsei Medical Center in Seoul were analyzed. An expert validity test was done for the preliminary critical pathway and clinical validity test was also done using seven IHD patients with CABG between November 11 and 23, 1996. After these processes. the final critical pathway was developed. The results of this study are summarized as follows : 1. The vertical axis of the critical pathway includes the following eight items : tests, nutrition, medications, consultations, activity, assessments, treatments, education discharge planning and the horizontal axis includes the time from the start of hospitalization to discharge. 2. Analysis of the 30 medical records indicated that the average length of stay was 20.2days with the average length of stay from hospitalization day to operation day being 6.2 days, and the average length of stay from operation day to discharge day was 13. 9 days. Analysis of the service contents showed that the horizontal axis of the preliminary critical pathway was set from hospitalization to the 14th post operation day and the vertical axis was set to include eight items, the contents which ought to have occurred, according to the time frames of the horizontal axis. 3. As a result of the experts validity, it was found that among the total of 571 items. there was over 83% agreement for 482 items, less than 83% for 89 items, which were then deleted and a revision of the critical pathway was done. 4. A clinical validity test was done using seven IHD patients with CABG. During the process, three patients were deleted because they were out of the criteria the investigator set. Finally, four patients were used. The result of study indicated that only one patient was discharged on the tenth post operation day, which was one day later than the expected day. Three patients were discharged later than the expected day from three days to nine days. All the cases progressed on schedule until the operation day and the first post operation day, but from the second post operation days, there were differences between the critical pathway and the actual practice. The differences came from tests, assessments, and treatments. 5. On the basis of the results of the clinical validity test. the following revisions in the final critical pathway were made : the transfer from ICU to step down ward would be the second post operation day, and the transfer to a general ward, the fifth post operation day, for patients who complained of lack of sleep from the fifth post operation day to discharge, a sleeping pill would be prescribed, skin observations would be performed routinely from immediately after the operation until the third post operation day, and would continue if there was a sign of skin injury on the fourth post operation day, and assessment of chest pain would be done from the third post operation day, and the “stairs climbing” item, expected to be done on the ninth post operation day would be deleted. In conclusion, this critical pathway is partially applicable to the care of patients with CABG but there are some parts needed to be further investigated.

  • PDF

Analysis the Appropriate Schedule for the Installment Payment Amount and Establishment of the Post sale System and Policy in the Apartment Construction (공동주택 건설사업에서 후분양의 제도 및 정책 수립을 위한 분담금 납부 적정시기 분석)

  • Yoon, Inhwan;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.59-65
    • /
    • 2021
  • Since the 2016 "Housing Act Partial Amendment" and the "2018 Housing Comprehensive Amendment Plan", interest in the pre sale system and post sale system of apartment houses has been on the rise. In order to compare the advantages and disadvantages of the pre sale system and the post sale system of apartment houses, and to establish the basis for the institutional policy of the post sale system, a questionnaire survey method was used for tenants of the apartment house from the public side, and issues of time and cost. The time series analysis method is intended to suggest an appropriate time for payment of contributions. Accordingly, through a review of existing theories and literature, the post sale system of public and private institutions was organized, and through a questionnaire survey, the path to securing pre sale money, product information of the model house, and the degree of awareness of the effect of the post sale system were investigated. For the post sale fund support and payment method, it is necessary to increase the commercial line for existing financiers from the user's point of view, and it is necessary to operate in consideration of the economic power of the pre sale market by region. Both 60% post sale and 80% post sale have a price range of up to KRW 10 million, and the total interest rate is 5.0%, and the annual interest rate is about 2.8% for 60% post sale, and about 2.1% for 80% post sale, which is lower than the current 3.1%. I need an interest rate. The research is a perception survey targeting a total of 5,213 households in a sample of after sale apartments in public institutions. As the actual values are analyzed using a time series on the effects of market supply and demand and market prices, there is a limit to applying them to prospective residents of private apartments. In addition, to respond to first time tenants, a questionnaire survey was conducted on five complexes that have moved in within the last five years.

농식품안전 정책방향

  • Jo, Jang-Yong
    • 한국환경농학회:학술대회논문집
    • /
    • 2009.07a
    • /
    • pp.3-18
    • /
    • 2009
  • It is difficult for consumers to satisfy high safety request with post-management method such as inspection and surveillance, as various changes in-and-out of the country associated with food safety. In terms of food safety problems related to foods, it is crucial to recognize public health and consumer protection and construct pre-preventive Food Control System. A joint committee, FAO/WHO made the following consultations to the National Food Safety System. ${\circ}$ Approach entirely from farm to table ${\circ}$ Get ready for Risk Analysis System ${\circ}$ Secure transparency ${\circ}$ Establish the optimal policy by evaluating the effect of regulation When it comes to summarizing the consultation, it would be accumulated as two key words; "Efficiency" and "Credibility". Whereas the problem of efficiency focuses on precaution rather than post-management, it requires policy option to maximize consumer's benefit by evaluating the cost for the Food Safety Management and its benefit. Also, analyzing risk's character and amount, demanding an optimal means, and introducing scientific analysis system put much value on the stakeholder's communications are procedure's security which can satisfy both "Efficiency" and "Credibility" simultaneously. Especially, it is emphasized here that Risk Assessment need to be separated from Risk Management. This action is a valid means of credibility security throughout improving transparency. A number of nations and organizations have reformed the method of food management passing through reflection and examination of the prior National Food Safety Management since BSE occurred in Britain, 1996. FSA; Food Standard Agency, AFFSA, EFSA, BfR, and FSC are Risk Assessment Organization functionally separated from Risk Management Organization, JECFA, JMCFA, JMPR, JEMRA in Codex charge Risk Assessment internationally. In case of advanced countries excluding several those such as The U.S. and so forth, though these Risk Assessment Organizations are either separated functionally within Risk Management Organization or operated as apart organ, common factors are in which it has independence as Science Base. While securing independence of Risk Assessment Function, it is a tendency Risk Management should be functionally unified into efficiency as well. Though Germany constructs integral Risk Management System of diverse ways according to social and political conditions of each country such as GFOCP, DVFA, SNFA, CFIS and AQIS, there is a key word in the center, "Securing efficiency of Food Safety Management". However our nation has a representative plural;diversified system with The U.S., we took a step forward for unification as empowering policy's generalization;adjustment and Risk Assessment Function by means of enacting the "Food Safety Fundamental Law" in 2008 and establishing the "Food Safety Policy Commission" with private and governmental sectors in the Prime Minister's office. Even though the unification of Risk Management hereby increased, there is the lack of strengthening function of Risk Assessment and securing independence. It needs to be required for the professional committee in Food Safety Policy Commission to develop as a exclusive office of Risk Assessment by separating from a policy decision. Administrative Branches should reinforce feeble functions such as fundamental investigation;research for carrying out Risk Assessment with securing efficiency throughout reassessment of prior Risk Management Means.

  • PDF

The Influences of Perceived Adequacy Resource and Locus of Control on the Stress from the Family Resource Management in Housewives (가정자원적정도지각과 통제소재가 주부의 가정자원관리 스트레스에 미치는 영향)

  • 정서린
    • Journal of Families and Better Life
    • /
    • v.15 no.2
    • /
    • pp.141-154
    • /
    • 1997
  • The purpose of this study was to investigate the influence of perceived adequacy resource(PAR) and locus of control on the stress from the family resources management in housewives. The subjects of this study were 474 married women who lived in apartment in Taegu, . A questionaire was used as survey method. Factor analysis and MANOVA were employed for data analysis and Scheffe test for post-hoc analysis, . The main findings were ; First the effect of PAR on the degree of the stress from the family resources management was not different according to locus of control. Second the stress from the family resource management was found to be significantly different according to PAR.

  • PDF

A Study on the Disaster Management R&D of the US and Japan (미국과 일본의 사례를 통해서 본 재난 분야 정부 R&D의 특징)

  • Lee, Juyoung;Choi, Sumin
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.3
    • /
    • pp.123-129
    • /
    • 2016
  • Through two case studies on the United States and Japan, this research aims to identify the characteristics of disaster management research and thereby provides policy implications for Korea. This paper analyzed government-funded disaster management R&D for each country: the National Science Foundation awarded projects from 2005 to 2015 for the United States, and Grants-in-Aid for Scientific Research from 2011 to 2015 managed by the Japan Society for the Promotion of Science for Japan. As a result, four following implications were drawn. 1) pursuit of R&SD(Research & Solution Development) instead of R&D, 2) shift from prevention to life-cycle management, 3) necessity of multidisciplinary research, and 4) emphasis on post-disaster investigation.

Clinical Feature and General Management of Post-Hemorrhagic Hydrocephalus in Premature Infants

  • Shunsuke Ichi
    • Journal of Korean Neurosurgical Society
    • /
    • v.66 no.3
    • /
    • pp.247-257
    • /
    • 2023
  • Recently, the survival of the high-risk population of preterm infants has steadily improved, and the severity of prematurity is a growing threat of gestational-age-related fatal conditions. Posthemorrhagic hydrocephalus (PHH) is the most common but serious neurological complication in premature infants, which can have life-threatening consequences during the acute phase in the neonatal period and life-long psychomotor and cognitive sequelae in their later life. Although neonatologists, pediatric neurologists, and pediatric neurosurgeons have investigated a diversified strategy for several decades, a consensus on the best management of PHH in premature infants still must be reached. Several approaches have tried to reduce the incidence of intraventricular hemorrhage (IVH) and mitigate the effect of IVH-related hydrocephalus. This paper reviews and discusses the clinical feature of PHH in premature infants, general/nonsurgical management of prematurity for IVH prevention, and posthemorrhagic management, and how and when to intervene.

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

Crisis Management System in Hospitals (병원의 위기관리 시스템)

  • Kim, Hyeongjin
    • Korea Journal of Hospital Management
    • /
    • no.spc
    • /
    • pp.85-95
    • /
    • 2016
  • This study is to introduce a comprehensive framework of a crisis management system developed at a prominent hospital in South Korea. Throughout recent decades, especially in the recent years, the way in which to cope with both internal and external challenges has been one of the most critical issues. Since the incident management system in the U.S. is acknowledged as the most advanced crisis management model in the world, a portion of this study refers to the Hospital Incident Command System(HICS) provided by the California Emergency Medical Services Authority(EMSA). Nevertheless, the framework suggested in this article was designed based on a distinctive Korean hospital setting. The main contents of this study are as follows; categorization of each type of crisis, organization of a crisis management team in a non-crisis or crisis state, crisis assessment by life cycle stage, and establishment of crisis management protocol. Even though many types of crises are unspecified, those can be categorized into external crisis, medical crisis, and utility & activity failure. A crisis management organization should be operated and consisted differently- depending on a crisis or non-crisis situation. From a life-cycle perspective, the range by which the crisis should be managed extends from pre-stage to post-stage of the crisis. It is important to set proper scenarios and manuals by crisis type to develop a crisis management framework of high quality. With continuous efforts, hospitals can prepare for the uncertainty to better concentrate on core business operations.

Exploring Factors affecting the Intention to Run University Remote Classes in the Post-COVID-19 Era (포스트 코로나 시대 대학 원격수업 운영 의사에 영향을 미치는 요인 탐색)

  • Kim, Sunyoung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.559-564
    • /
    • 2021
  • The purpose of this study is to explore the factors that affect the intention to run remote classes after COVID-19 with university professors have fully experienced remote classes due to COVID-19. The research questions are what are the factors and the combinations of factors that affect the intention to run remote classes in the post-COVID-19. Data were collected through a survey of 311 remote classes at S Univ. in Seoul in fall 2020, and individuals and combinations of factors were confirmed through logistic regression analysis and decision tree analysis. As a result, individual factors were quality management, online office hours, quizzes midterm oral exams, video development, and student-student and instructor-student Q&A type between face-to-face and remote class. As combinations of factors, it was found that quality management×quiz×student Q&A and quality management×quiz×voting type had an effect on whether to run remote classes. Based on the results, we proposed to run and support remote classes in the post-COVID-19 era.